§ 10.01 — Oil & Gas Facilities
Municipal Code of the City of Brighton, Colorado (Codified through Ordinance No. 2508, adopted June 16, 2026. (Supp. No. 26, Update 2)) · Brighton Land Use and Development Code § 10.01
Corpus is an independent public-information project, not the official City of Brighton website. Stable reference: corpuslaw.us/code/48cd3336-f358-4397-8abf-8bdf8674be64
10.01 - Oil & Gas Facilities
A. Intent. State law recognizes that surface and mineral estates are separate and distinct interests in land and that one may be severed from the other. Further, the City's primary source of water for its municipal and domestic use comes from numerous wells located throughout the City. This section has the following intent with regard to the rights of surface and mineral estates: 1. Ensure and monitor compliance with all State and Federal laws and rules; 2. Enable the right to use that part of the surface estate reasonably required to extract and develop their subsurface mineral interests; 3. Minimize or mitigate adverse land use impacts on mineral estates, and provide mutual accommodation of the surface and mineral owners. 4. Protect the City's groundwater resources and require mineral estate developers to minimize and mitigate any adverse impacts to groundwater resources. B. Applicability. The standards and procedures in this section apply to all apply to oil and gas exploration, drilling and production operations, including infrastructure and accessory equipment or structures within all zoning districts, including a planned unit development district. 1. New Facilities and Expansions. All new oil and gas locations, oil and gas facility expansion that requires a new or modified permit from COGCC, and construction of pipelines, shall require a conditional use permit approved by the City Council or a memorandum of understanding approved by the City Manager. 2. Existing Facilities. Well and production sites that are in existence on the effective date of this Section or located within territory annexed to the City, may continue operating without the issuance of a conditional use permit or a memorandum of understanding until the production site is expanded or new wells are drilled on the well site requiring a new COGCC permit. The reentering of a well in existence prior to the date of adoption of this Section, for purposes of deepening, recompleting or reworking, shall not require approval of a conditional use permit as required by this Section, unless such work requires a new COGCC Form 2 or Form 2A. 3. Accessory Equipment. Accessory equipment and pumping systems that are in existence on the effective date of this Section or located within territory annexed to the City may continue operating without the issuance of a conditional use permit or a memorandum of understanding. Any renovation or repair of nonconforming accessory equipment or pumping systems shall be permitted without a conditional use permit, provided the work does not increase the degree of nonconformity. Any replacement of existing accessory equipment or any addition of accessory equipment shall conform to this Section and require a site improvement permit subject Section 2.06, Site improvement permits. The replacement or addition of individual tanks, treaters, or separators shall not require the remaining accessory equipment in a production site, an access road, or a well site, to conform to the standards and requirements of this Section. 4. Infrastructure. Construction or reconstruction of access roads shall conform to the requirements of this Section and shall require a site improvement permit subject to Section 2.06. C. Application Forms. All applications for a conditional use permit and memorandum of understanding shall be on form provided by the Director according to Article 2, and for oil and gas facilities shall specifically include the following information: 1. The operator's and surface owner's names and addresses, and designation of agent, if applicable; 2. A list of all permits or approvals obtained or to be obtained from local, state, or federal agencies other than COGCC; 3. A list of COGCC permits that shall be submitted in conjunction with the COGCC Form 2A, Application for Permit to Drill (Form 2) and any exceptions or variances proposed to be requested; 4. A vicinity map or satellite photo at a scale of 1 inch equals 250 feet, extending at least one-quarter-mile beyond the oil and gas location. The map or satellite photo shall denote: a. The outline of the oil and gas location to be developed; b. Streets and highways; c. All existing oil and gas wells, injection wells, production facilities and pipelines; d. Natural drainage courses, water bodies, and similar major natural or man-made features of the area; e. Existing uses for residential, commercial, industrial and public purposes; f. Any parcels proposed as school locations; and g. Proposed access (ingress/egress) locations and haul routes. 5. A detailed site plan for all well sites that includes submittal to the City of all documents required to be submitted with COGCC Form 2A, a depiction of all visible improvements within one thousand three hundred twenty (1,320) feet of the proposed location, including buildings/residences, public roads and trails, major above-ground utilities, railroads, pipelines, mines, oil/gas/injection/water/plugged wells, etc., as required by COGCC Rule 303.d(3)C, and the site plan requirements of the Municipal Code,; 6. An operating plan including identified access points and estimated operational timeline for posting to the City's community information web-page; 7. A site plan for site preparation, mobilization and demobilization; 8. A stormwater management plan; 9. A plan for interim reclamation and re-vegetation of the well pad and final reclamation of the well pad; 10. A utilities report if applicable; 11. A plan for noise, light, odor and dust mitigation; 12. A traffic management plan (described in greater detail in Section 10.01.G, Transportation and access roads below); 13. Proposed form and issuer of a reasonable bond to cover any damage to public infrastructure during active drilling and completion; 14. A preliminary visual mitigation plan, including but not limited to, a list of the proposed colors for the operations' equipment, proposed fencing and screening; 15. An air emissions mitigation plan; 16. An emergency response plan for each specific facility site, which is in compliance with the applicable fire code. The plan shall be filed with the City and the Greater Brighton Fire Protection District and updated on an annual basis in January of each year or as conditions change (responsible field personnel change, ownership changes, etc.). The emergency response plan will address all potential emergencies that may be associated with an oil and gas facility. The emergency response plan shall consist of at least the following information to be submitted to the City for review and approval: a. Name, address and phone number, including 24-hour emergency numbers for at least two persons responsible for emergency field operations; and b. A diagram depicting the planned site design. Following construction of the facilities, the operator shall submit as-built drawings in AutoCAD format, or another format acceptable to the City, that is compatible with the City's current adopted coordinate system. The as-built drawings shall depict the locations and type of above and below ground facilities including sizes, and depths below grade of all oil and gas gathering and transmission lines and associated equipment, isolation valves, surface operations and their functions, as well as transportation routes to and from exploration and development sites, and dry and wet utility infrastructure and/or surface water bodies, for emergency response and management purposes. The information concerning pipelines and isolation valves shall be held confidentially by the City and shall only be disclosed in the event of an emergency or to emergency responders. The City shall deny the right of inspection of the as-built drawings to the public or for the training of emergency responders pursuant to C.R.S. § 24-72-204; and c. Detailed information addressing each reasonably potential emergency that may be associated with the operation. This may include any or all of the following: explosions, fires, gas, oil or water pipeline leaks or ruptures, hydrogen sulfide or other toxic gas emissions, or hazardous material vehicle accidents or spills. A provision that any spill outside of the containment area, that has the potential to leave the facility or to threaten waters of the state, or City water supplies, or as required by the City-approved emergency response plan shall be reported to the local emergency dispatch and the COGCC Director in accordance with COGCC regulations; and d. Detailed information identifying access or evacuation routes, and health care facilities anticipated to be used; and e. A project specific emergency response plan for any project that involves drilling or penetrating through known zones of hydrogen sulfide gas; and f. A fire protection plan that is mutually acceptable to the operator and the Greater Brighton Fire Protection District that includes planned actions for possible emergency events and other pertinent information; and g. Detailed information showing that the operator has adequate personnel, supplies, and training to implement the emergency response plan immediately at all times during construction and operations; and h. A program to ensure that the operator maintains on site all current material safety data sheets (MSDS) for all chemicals used or stored on a site. The MSDS sheets shall be provided immediately upon request to City officials, employees or agents; a public safety officer; or a health professional as required by COGCC Rule 205; and i. A process by which the operator notifies the surrounding neighbors to inform them about the on-site operations and provide sufficient information for surrounding neighbors to communicate with the operator as required by the COGCC; and j. Any additional training and emergency equipment needs prompted by the emergency response plan shall be coordinated with the Greater Brighton Fire Protection District; and k. A provision obligating the operator to reimburse the appropriate emergency agencies for expenses and damages resulting from the operator's operations, to the extent required by Colorado State Statutes. 17. A weed control plan; 18. Required fees including the oil and gas application review fee or the MOU fee together with such other impact fees or other fees that may be adopted by City Council in the annual fee resolution. 19. If a well or production facility is proposed to be located less than 1,000 feet from a high occupancy building unit, a building unit, or public water supply well(s), the applicant shall submit the following "alternative location analysis" as part of the application: a. On a map, denote surface locations that could feasibly access the targeted minerals that are a greater distance from building units and public water supply wells than the location proposed. b. A brief explanation of why each alternative location was not chosen. 20. Any information or documentation agreed to be provided to the City by the applicant at the pre-application conference. 21. A biological resource report identifying the following, including any mitigation or protection that needs to take place: a. An evaluation of wetlands in the vicinity. b. An evaluation of endangered species in the vicinity, including plants and animals. D. Procedures, Generally. 1. Approval Required. Development of an oil and gas facility shall not commence until and unless any required permits from COGCC, and a conditional use permit or administrative approval by memorandum of understanding from the City, have been approved. 2. Transfer. Conditional use permits or memorandums of understanding may be assigned to another operator provided that the new operator provides the City Manager written assurance that operator can and will comply with all conditions of the transferred conditional use permit or memorandum of understanding and with all of the applicable provisions of this Section. The existing operator shall assign the conditional use permit or memorandum of understanding to the new operator on a form provided by the City and the new operator shall also sign the form agreeing to comply with all of the conditions of the permit and all applicable provisions of this Chapter. These forms will be supplied to the City Manager within 30 days of the assignment. 3. Fees. When an application is submitted to the City for a conditional use permit or administrative approval by memorandum of understanding under this Section, the applicant shall pay to the City an oil and gas application review fee or an MOU fee for each oil and gas facility shown on the site plan as established in the City's annual fee resolution. The City may require a third-party consultant to participate on behalf of the City in pre-application meetings, to review any submittals or applications to the City, and to advise on an MOU or other processes deemed by the City to be appropriate and necessary to complete the review. Reasonable costs associated with such reviews, including third-party consultant fees, shall be paid by the Operator. 4. Pre-application Conference. a. Timing. The timing provision for the pre-application conference is intended to allow the City of Brighton to carry out its regulatory procedures in harmony with those of the COGCC. (1) A pre-application conference shall be held at least 30 days prior to the applicant applying for a conditional use permit. (2) The applicant will make best efforts to conduct a pre-application conference prior to submitting a COGCC Form 2A, otherwise the City shall request from the COGCC additional time for review and, depending on the selected location, may also request a hearing before the COGCC pursuant to COGCC Rule 305. (3) At latest, the operator shall contact the City on or before the day of the pre-application notice required by COGCC Rule 305.a.(1) and schedule the pre-application conference to a date certain. (4) The operator shall use its best efforts to conduct the pre-application conference with the City prior to completing well siting decisions, to the extent reasonably feasible. (5) Following the pre-application conference and applicant has six months to submit a formal application, otherwise a new conference will be required. b. Topics. In addition to the general pre-application conference topics in Article 2, a pre-application conference for oil and gas facilities shall consider the following: (1) Discuss the provisions set forth in Article 2 of the Code; (2) Review the City's conditional use review process so that the applicant can plan its proposed oil and gas operation in a manner that ensures compliance with the Code; (3) Review the applicant's objectives and land use proposal; (4) Review the preferred oil and gas location, site-specific matters, and, if necessary, possible alternatives; (5) Discuss project impacts (particularly as related to the City's domestic water supply) and possible mitigation methods, including field design and infrastructure construction, to minimize impacts; (6) Discuss the submittal requirements for the transportation plan described in Section 10.01.G; (7) Discuss coordination of field design with other existing or potential development and oil and gas operations; and (8) Inform the applicant about the benefits of the expedited administrative approval by MOU process as more particularly set forth in Section 10.01.E. c. Site Visit. At the discretion of the Director, after obtaining surface owner consent, the Director may require a site visit as part of the pre-application conference with the applicant to evaluate well locations, compliance with this Section, and/or mitigation measures and best management practices that may be required to adequately ensure compliance with this Section. 5. Approval Process and Criteria. In addition to the general approval process and criteria for conditional use permits in Article 2, oil and gas facility conditional use permits shall be reviewed according to the following criteria: a. The site plans for an oil and gas facility application to comply with all requirements this Section. b. Compliance with the all provisions for special mitigation applicable from this Section. c. The application complies with all other site specific requirements as determined necessary by City Council and are otherwise consistent with applicable law. d. The proposal will be compatible with adjacent land uses. (1) Compatibility with the surrounding area; (2) Harmony with the character of the neighborhood; (3) Need for the proposed use; (4) Effect of the use on the immediate area; (5) Effect of the use on future development of the area; (6) Conformance with the City Comprehensive Plan; and (7) If the property is in an urban renewal area at the time of the application, consistency with any adopted Urban Renewal Plan. e. The proposed use will not significantly degrade the environment or public health, safety, and welfare. 6. Final Plans. Following approval by the City Council, final plans shall be approved by the City Manager. The City Manager may refer any revised plans that substantially deviate from plans approved in the conditional use permit back to the City Council for a review and decision. If the City did not require modification of the draft plans reviewed with the application, and the operator has not otherwise updated or changed plans associated with the application, final plans need not be resubmitted to the City Manager. The final plans shall include the following, which may be modified by an MOU under 10.01.E: a. A response letter that outlines how the permit requirements have been met; b. A summary of planned operations, including identified access points and operational timeline for posting to the City's information web-page; c. A site plan for site preparation, mobilization and demobilization; d. A plan for interim reclamation and revegetation of the well pad and final reclamation of the well pad; e. A stormwater management plan; f. A utilities report if applicable; g. Copies of all permits requested, including any exceptions; h. A final air emissions mitigation plan; i. A final emergency response plan; j. A final plan for noise, light, odor and dust mitigation; k. A final traffic management plan and a reasonable bond to cover any damage to public infrastructure during active drilling and completion; l. A final visual mitigation plan; m. A final weed control plan; and n. A water quality monitoring plan if required by an MOU. 7. Notice. Not less than 30 days in advance of commencement of operations with heavy equipment for the drilling of a well (COGCC Rule 305f.), recompletion, or plugging and abandonment of a well, operators shall provide notice to the well site surface owner(s) and Brighton's local governmental designee. Notice to the surface owner may be waived in writing by the surface owner. The notice must contain: a. The operator's name and contact information for the operator or its agent; b. A site diagram or plat of the proposed well location and any associated roads and production facilities; and c. The date operations with heavy equipment are expected to commence and be completed. E. Procedures, Memorandum of Understanding. The administrative review and approval by memorandum of understanding is an alternative to the conditional use review process in 10.01.D. Applications for administrative review by MOU will be governed by the Code and the terms of the negotiated MOU and Attachment "A". (On file with the City.) For each application for administrative review by MOU, the Attachment "A" (which lists the conditions that will be attached to the COGCC permit) will be modified by agreement of the parties to reflect the location chosen and the specific mitigations and best management practices required by that application. 1. Model MOU. The City Manager is authorized and shall prepare a model MOU (the "model MOU") which shall contain best management practices to address issues including surface owner involvement, setbacks for new oil and gas locations, pits, water quality monitoring, noise mitigation measures, floodplain, and visual impacts and aesthetics. The model MOU is intended to be used by all operators who submit an application for a new oil and gas location within the City for administrative review of a memorandum of understanding. a. Operators interested in pursuing an administrative approval by MOU should contact the City to obtain a copy of the model MOU and schedule a meeting with the City to discuss the MOU. This meeting should be held well in advance of the operator submitting any application to the City. b. Operators are encouraged to discuss their immediate and longer range plans for operations within the City. Such information will be held in confidence. c. Attachment "A" to the memorandum of understanding shall set forth the site-specific conditions to be placed on applications that are administratively approved by MOU. (1) The City Manager is authorized to work in good faith with the operator to finalize and execute Attachment "A". (2) Attachment "A" may address, by means of illustration only, such best management practices as pits, containment berms, water supply and quality, setbacks for new oil and gas locations, discharge valves, burning, chemical storage, water quality and monitoring, floodplain, visual impacts and aesthetics, electric equipment, air quality mitigation, fugitive dust suppression, flammable material, flow lines, and removal of debris and equipment. (3) The operator shall include as conditions of approval the best management practices requirements set forth in Attachment "A" on all applications for Permit-to-Drill, Form 2, and Oil and Gas Location Assessments, Form 2A, submitted to the Commission for new wells after the effective date of this Section, except to the extent the City Manager in his/her sole discretion determines that such requirements do not need to be so included. d. A memorandum of understanding (MOU), in a form approved by the City shall be executed by the applicant and the City Manager and thereafter be in full force and effect, and the oil and gas facility as proposed shall be in compliance with the provisions of the MOU. 2. Pre-application Conference. A pre-application conference is required and shall follow all of the standards and procedures for pre-application conferences required for conditional use permits in 10.01.D. 3. Application, Fees and Review for Completeness. Applications for a memorandum of understanding shall submit all fees and application materials required for a conditional use permit under 10.01.C and D. The Director shall review the application for completeness within 3 days. 4. Neighborhood Meeting. A neighborhood meeting shall be required for any oil and gas facilities that require an application for administrative approval by memorandum of understanding. The operator shall schedule, attend, and conduct the neighborhood meeting. The City shall attend to facilitate the discussion. A written summary of the neighborhood meeting shall be prepared by the operator and provided to the City. The meeting shall have the following notice requirements: a. Mailed Notice. The City shall mail notice of the application for an administrative approval by memorandum of understanding, no more than 14 days after a complete application has been submitted to the City. Owners of record shall be determined according to Assessor's office records in the county in which the well is located or within the area around the well for which notice is required. Notice of the application shall include reference to the neighborhood meeting, and be made as follows: (1) To the surface owners of the parcels of land on which the oil and gas operation is proposed to be located; (2) To the surface owners of the parcels of land in the City or adjacent unincorporated Weld or Adams County within 1,000 feet of the parcel on which the oil and gas operation is proposed to be located. (3) Mailing notice shall be provided at least 14 days prior to the neighborhood meeting. b. Posted notice. A sign shall also be posted on the real property on which the oil and gas operation is proposed to be located, providing notice to the general public of the proposed operation. Such signs shall be provided by the City and shall be posted on the subject property by the applicant in a manner and at a location or locations reasonably calculated by the City to afford the best notice to the public, which posting shall occur a minimum of 14 days prior to the neighborhood meeting. 5. Review Process. A complete application shall be reviewed by the Development Review Committee within 21 days. An application may require review by outside agencies such as the U.S. Army Corps of Engineers, if the project impacts a floodplain, and may also be referred to any life-safety providers, adjacent jurisdictions, local public health department, and others as may be deemed appropriate by the City Manager, and any agency comments shall be returned to the City within a reasonable time. The applicant will be notified of any outstanding issues in connection with application materials upon completion of this review and will be required to address any issues or deficiencies in connection with the application materials. If necessary, a meeting will be held to discuss any issues that need to be resolved. The applicant may then submit an amended application, plan or other submittals, as appropriate, to the City for verification that deficiencies have been addressed by the applicant. If the outstanding issues cannot be resolved, the City Manager may refer the application for consideration as an application for conditional use by the City Council. 6. Revisions. If substantive revisions are submitted, the City shall be provided no more than 14 days to review the revised application. Upon determination by the City that all issues have been resolved, the revised application shall be considered the final copy of the application and exhibits. The Director shall forward the final copy of the application materials for final review by the City Manager. 7. Decision. Unless there are any issues that have not been resolved by agreement with the applicant, the City will exercise its best efforts to process the administrative approval by memorandum of understanding for an oil and gas facility in 21 days or less from the date of the neighborhood meeting. The City manager may approve, approve with conditions, or deny the application. Written notice of the decision shall promptly be provided to the applicant, and, if denied, the notice shall include a statement of the reason(s) for denial. The 21-day timeframe applies only to the City's processing time and does not include the applicant's response time. Approval with conditions or denial of the administrative approval by memorandum of understanding shall in no way prevent, delay or restrict the ability of the applicant to resubmit the application through the standard conditional use review, described in Section 10.01.D. 8. Term. An approval of the application for administrative approval by memorandum of understanding shall be valid for 5 years from the date of the MOU unless the MOU states otherwise, or unless the oil and gas facility is substantially commenced prior to the expiration of such timeframe. If the MOU is terminated for any reason, the conditions of the MOU that were applied to an administrative approval of an oil and gas location shall continue to be enforced through this Section and other applicable provisions in this Chapter. 9. Appeal. An applicant may appeal the City Manager's denial of an application for an administrative approval by memorandum of understanding, or any conditions of approval, to the City Council for a de novo hearing. The applicant must file the appeal within 14 days of the date of the City Manager's decision by submitting a letter of appeal to the City Manager. The matter will be scheduled on the next available agenda of the City Council. The City Council may affirm, reverse or modify the decision of the City Manager, based upon the provisions of this Section. 10. Conditions. The approval of an application for administrative approval by memorandum of understanding shall automatically include as conditions of approval all provisions of the MOU executed by the applicant and the City. 11. Amendment. If the applicant or operator proposes changes to the plans approved and agreed to by the memorandum of understanding, the applicant or operator shall submit a proposed amendment to the MOU showing the changes together with payment of the applicable fee. The proposed amendment will be reviewed by the City and, if applicable, the City may require additional information. 12. Notice. At least 14 days prior to the commencement of any new drilling operations, the operator shall provide a notice to the City for posting on the website setting forth the information required by the City, including the operator and surface owner's names and addresses, designation of the operator's agent, identification of the City's designee and the approximate commencement of operations, which the operator may revise from time to time during operations. F. Coordination with COGCC Rules. In addition to any other standards that are part of a conditional use permit or memorandum of understanding, all oil and gas facilities shall comply with the following COGCC rules. 1. Abandonment and Plugging. The operator shall provide the City with the COGCC approved Form 6 (well abandonment report). The well abandonment report must be accurately and completely filled out and the location recorded with the Clerk and Recorder of the applicable county. Operators shall also comply with all applicable requirements set forth in the subdivision regulations of the City, as more specifically set forth in Article 3. 2. Seismic Operations. All notices which an operator is required to file with the Commission with respect to seismic operations shall be simultaneously filed with the City. The City shall comply with the same confidentiality requirements which bind the COGCC. 3. Signs. the owner or operator shall maintain all signs required by COGCC in good, readable condition. 4. Fencing. All pumps, pits, and producing facilities shall be adequately fenced to prevent access by unauthorized persons when the producing site or equipment is easily accessible to the public and poses a physical or health hazard (COGCC Rule 605c.(3)). Fencing materials will be determined by City, taking into consideration aesthetics, cost, and functionality. 5. Reclamation. All facilities shall comply with all Commission rules with respect to site reclamation. As part of site reclamation, Operator is required to remove all unused pipelines, gathering lines, and flowlines within the City limits unless this requirement is waived by the City Manager in writing. 6. Location Restrictions. All facilities shall comply with all Commission rules with respect to equipment at drilling and production sites in geological hazard and floodplain and, to the maximum extent practicable, all equipment should be anchored to the extent necessary to resist flotation, collapse, lateral movement or subsidence and to the extent necessary to comply with the Federal Emergency Management Act and 10.02, FC-Flood Control Overlay. a. Setbacks. Oil and Gas Facilities shall be at least 1,000 feet from the property line of any existing or platted residences, schools, Future School Facilities, state licensed daycares, or occupied buildings. b. Water protection. There shall be no Oil and Gas Facilities permitted within a floodway or within 500 feet of a public water system well subsection F.8. 7. Recordation of Pipelines. All new pipelines that leave the well pad, including transmission and gathering systems, shall have the legal description of the location recorded with the Clerk and Recorder of the applicable county within 30 days of completion of construction. Abandonment of any recorded pipelines, including transmission and gathering systems, shall be recorded with the Clerk and Recorder within 30 days after abandonment. The owner of the pipeline, transmission line, or gathering system shall be responsible for the recording requirements under this Section. 8. Well Water Protection. On July 28, 2014, the COGCC passed Order 1-189 to give additional protections to the Brighton public water system (PWS) consisting of certain wells in Beebe Draw and on the South Platte River (collectively "wells"), Ken Mitchell Lakes and Barr Lake (collectively "lakes"), and specified segments of the South Platte River, including but not limited to Second Creek, Third Creek, Fulton Ditch and Lateral, Brighton Ditch and Lateral, and Brian Canal (collectively "ditch segments"). Exhibit A attached to and made a part of Order 1-189 entitled "Brighton PWS Management Map, Commission Order No. 1-189" includes the relevant river, stream, and ditch segments which are integral to Brighton's PWS and the exact boundaries of the exception zone, groundwater monitoring zone and BMP buffer zone. The COGCC Order 1-189, including all maps, exhibits and attachments are attached to this ordinance as Exhibit 1. (On file with the City). The following shall be required for all drilling, completion, production and storage (DCPS) operations at new oil and gas locations within the one-half-mile buffer zone. a. If a new oil and gas location is proposed within one-half mile of the Brighton PWS, the operator will consult with Brighton and the COGCC regarding site-specific BMPs and operating practices in addition to those required for the BMP buffer zone that may be required to avoid potential significant adverse impacts to the ditches or South Platte River. Where a discrepancy between the zones as described above and the attached Brighton PWS Management Map exists, the operator shall request a consultation with Brighton and staff to determine the applicability of this order. b. Operator shall notify the Brighton Department of Utilities prior to commencement of new surface disturbing activities at the site; and c. An emergency spill response program that includes employee training, safety, and maintenance provisions and current contact information for Brighton. The emergency response plan shall specify when notifications to Brighton shall be made and must be prepared in consultation with Brighton. d. In the event of a spill or release, the operator shall immediately implement the emergency response procedures in the above-described emergency response program. If a spill or release results in significant adverse impacts or threatens such impacts to a portion of the Brighton PWS, the operator shall notify Brighton immediately following discovery of the release in addition to reporting in accordance with Rule 906.b. G. Transportation and Access Roads. 1. Transportation Management Plan. In each application for a conditional use permit, the applicant shall include detailed descriptions of all proposed access and haul routes for equipment, water, sand, waste fluids, waste solids, mixed waste, and all other material to be hauled on the public streets and roads of the City. The disposal of water used on site shall also be documented in detail by the operator, including anticipated haul routes, approximate number of vehicles needed to supply and dispose of water and the final destination for water used in operation. In order for the Director of the Department of Streets and Fleet to assess the impact of the oil and gas operation on the City's roadways, the submittal may include the estimated weights of vehicles when loaded, a description of the vehicles, including the number of wheels and axles of such vehicles, trips per day and any other information required by the City traffic engineer. The operator shall comply with all transportation requirements as contained in the Model Traffic Code as adopted by the City, Article 10-13 of the Municipal Code. 2. Access roads to oil and gas locations shall be subject to review by the Director of the Department of Streets and Fleet in accordance with the following minimum standards: a. The operator agrees to construct (unless already constructed) and maintain an access road designed to support an imposed load of 75,000 pounds (or the load of the heaviest truck anticipated, whichever is greater), that will accommodate emergency response vehicles such as law enforcement, emergency command vehicles (cars/SUVs), ambulances, hazardous materials response vehicles, water tenders, and fire apparatus during construction and operation of new tank batteries, new drilling activity and reworks or recompletions of existing wells that require a new Form 2 or 2A permit, unless a local fire department or fire district agrees to a different or lesser standard or waived by the City. b. With respect to new roads to new tank batteries, the operator agrees to construct access roads at least 16 feet wide graded gravel roadway with a prepared subgrade and an aggregate base course surface a minimum of 6 inches thick compacted to a minimum density of 95% of the maximum density determined in accordance with generally accepted engineering sampling and testing procedures. The aggregate material, at a minimum, shall meet the requirements for Class 3, Aggregate Base Course, as specified for aggregate base course materials in the Colorado Department of Transportation's "Standard Specifications for Road and Bridge Construction," latest edition. c. Graded to provide drainage from the roadway surface and constructed to allow for cross drainage of waterways (such as roadside swales, gulches, rivers, creeks, and the like) by means of an adequate culvert pipe. Adequacy of the pipe is subject to approval of the Director of the Department of Streets and Fleet. d. Maintained to provide a passable roadway reasonably free of ruts at all times. 3. All access roads will be protected through the following methods: a. Water management. Water necessary for drilling and hydraulic fracturing shall be piped to the location if reasonably and commercially practicable. The availability and use of City water shall be at the sole discretion of the City. b. Chains. Traction chains from heavy equipment shall be removed before entering a City street or right-of-way. c. Mud tracking. The operator shall take all practicable measures to ensure that vehicles do not track mud or debris onto City streets and rights-of-way. If mud or debris is nonetheless deposited on City streets, in excess of de minimus levels, the streets shall be cleaned as soon as practicable by the operator. If for some reason this cannot be done, or needs to be postponed, the City shall be notified of the operator's plan for mud removal. 4. Operators, or operators' contractors, as applicable, must obtain permits from the Department of Streets and Fleets for all vehicles that exceed legal vehicle dimensions or weights as specified in Section 10-13-60 of the Municipal Code. H. Exceptions. An applicant may request exceptions from the standards of this Section through the conditional use process or administrative approval of a memorandum of understanding, only if the owner or operator will employ equivalent mitigation measures for the standards waived or modified. 1. Criteria. An exception may be in the form of a waiver or modification, and may be granted based on one or more of the following: a. There is no technology commercially available at a reasonable cost to conduct the proposed oil and gas operations in compliance with the provision and granting an exception from the operation of the provision will not have an adverse effect on the public health, safety, or welfare or on the environment. b. An alternative approach not contemplated by the provision is demonstrated to provide a level of protection of the public health, safety, and welfare and of the environment that would be at least equivalent to the applicable provision. c. Application of the provision is impractical or would create an undue or unnecessary hardship because of unique physical circumstances or conditions existing on or near the site of the oil and gas facility such as topographical conditions, shape or dimension of the operation site, or inadequate public infrastructure to the site. I. Enforcement and Reporting. 1. Inspections. In recognition of the potential impacts associated with oil and gas drilling and well operation in an urban setting, all wells and accessory equipment and structures may be inspected by the City at reasonable times to determine compliance with applicable provisions of this Section, the International Fire Code, the International Building Code, and all other applicable standards adopted by the City of Brighton. For the purpose of implementing and enforcing the provisions of this Section, the personnel and/or agents of the City have the right to enter upon private property after reasonable notification to the operator, and reasonable compliance with any safety requirements of the operator. The operator will be given an opportunity to be present at the inspection. The City may use the information collected by the inspections to enforce the requirements of this Section. These enforcement actions may be either through enforcement of City regulations or, in the case of state statutes or regulations, the City may report the inspection information to appropriate state officials for proper enforcement. Operator shall reimburse the City for inspection costs reasonably incurred to inspect the Well Sites to determine compliance with the Code. Such fees shall include estimated costs incurred by the City, including employee time, employee supervision, necessary equipment rental, and overhead. For the avoidance of doubt, this fee is based on the individual wells and not on the Well Site. Fees for Oil and Gas Facility inspections shall be assessed according to the City's adopted fee schedule. 2. Civil action, Enforcement. The City Attorney, in addition to the other remedies provided by law, ordinance, or resolution, may institute an injunction, mandamus, abatement, or other appropriate action or proceeding to prevent, enjoin, abate, or remove such unlawful erection, construction, reconstruction, alteration, or use. The enforcement provisions of this Section shall apply to all conditional use permits or administrative approval by memorandums of understanding adopted pursuant to this Section and all operator agreements adopted on or after the effective date of this ordinance. Violations may include: a. Constructing, installing or causing to construct or install any facility without a conditional use permit or memorandum of understanding required by this Section. b. Nonconformance with a memorandum of understanding or conditional use permits, c. Nonconformance with plans submitted and approved by the City pursuant to this Section, or d. A building or structure is or is proposed to be erected, constructed, reconstructed, altered, or used, or any land is or is proposed to be used, in violation of any provision of this Section or the conditions and requirements of the oil and gas conditional use permit or memorandum of understanding, 3. Revocation. If the City Manager believes the operator has failed to conduct its operations in accordance with the terms and conditions of the conditional use permit or memorandum of understanding, then as a condition precedent to terminating the conditional use permit or memorandum of understanding, the City must provide written notice to operator specifying, in reasonable detail, the failure and the remedy required. Operator shall then have a period of 45 days in which to remedy the failure, or if the failure is of a nature that cannot be remedied within that 45-day period, operator shall have commenced to remedy the failure and will diligently complete the remedy. If operator fails to remedy a material default in the manner set forth above, the City Manager may request a hearing with the City Council. Upon 30 days' written notice sent by certified mail to the operator and otherwise made in accordance with the City's requirements for notification of a City Council meeting, the City Council may hold a public hearing on the alleged violations. At such hearing, the City Council may determine that no such failure occurred, that such failure occurred but was remedied in the manner set forth above, or that such failure occurred and has not been remedied. If the City Council finds that such failure occurred and has not been remedied, the City Council, upon allowing 45 days' notice to operator prior to such action, may act in its discretion to terminate, suspend, or restrict the conditional use permit or memorandum of understanding and revoke any or all approvals for operations of the subject oil and gas facilities, or alternatively, may require such other actions of the operator as it deems appropriate. Upon such revocation, operator shall cease operating such oil and gas facilities until it obtains approval for such wells under the then-applicable City Code. 4. Coordination with Air Quality Control Commission. Pursuant to C.R.S. § 25-7-128(4), upon the issuance of any enforcement order or granting of any permit, the City shall transmit to the AQCC a copy of the order or permit. Pursuant to C.R.S. § 25-7-128(6), the City shall confer and coordinate its activities regarding efforts to control or abate air pollution consistent with that provision. 5. Coordination with the COGCC. The City's designated local government designee is only given a very short window to review COGCC permits. In recognition of this, the local government designee, in coordination with the City Manager, is hereby authorized to: a. Comment on COGCC applications on behalf of the City, b. Request an additional time to review applications, c. Request onsite inspections, d. Request review from CDPHE, and e. Recommend actions to the City Council regarding COGCC applications or other COGCC processes. J. Defined Terms. The following terms used in this Section shall have the meaning given below. All terms not listed but that are defined in the Act, or in regulations by the COGCC or CDPHE authorized under the Act, shall defer to those definitions, and any conflicts resolved in favor of the state definitions. All other terms shall have their usual customary meaning, the meaning given elsewhere in this code, or any generally accepted oil and gas industry meaning if the term is technical in nature. Act means the Oil and Gas Conservation Act of the State of Colorado. Air emissions mitigation plan means a description of the emission controls an operator will utilize on an oil and gas location to meet emission standards, as required by the Colorado Department of Public Health and Environment (CDPHE), Air Quality Control Commission (AQCC), COGCC, and United States Environmental Protection Agency (EPA). Biological Resources Report means the product and recommendations of a study evaluating wetlands and endangered species in the vicinity of the oil and gas development Building unit means a residential building unit, and every 5,000 square feet of building floor area in commercial facilities or 15,000 square feet of building floor area in warehouses or other similar storage facilities that are operating and normally occupied during working hours. COGCC rules means the rules of the Oil and Gas Conservation Commission of the State of Colorado. Commission or COGCC means the Oil and Gas Conservation Commission of the State of Colorado. Department or CDPHE means the Department of Public Health and Environment of the State of Colorado. DOGCC Director means Director of the Oil and Gas Conservation Commission of the State of Colorado. High occupancy building unit means: (1) A public school as defined in C.R.S. § 22-7-703(4); (2) Nonpublic school as defined in C.R.S. § 22-30.5-103(6.5); (3) Nursing facility as defined in C.R.S. § 25.5-4-103(14); (4) Hospital; (5) Life care institution; (6) A jail which includes those structures where the personal liberties of occupants are restrained, including but not limited to prisons, detention facilities, and reformatories; or (7) An child care center as defined in C.R.S. § 26-6-102(1.5). Inspector, City means the Manager's designee, who shall have the authority to inspect a well site to determine compliance with this Section and other applicable ordinances of the City. Local government designee means the office designated to receive, on behalf of the City, copies of all documents required to be filed with the local governmental designee pursuant to the rules of the COGCC. MOU means a "memorandum of understanding" or contractual agreement between the oil and gas operator and the City of Brighton for the purpose of facilitating and ensuring responsible oil and gas development within the City of Brighton, and shall consist of a model MOU and Attachment A. Multi-well production facilities means all storage, separation, treating, dehydration, artificial lift, power supply, compression, pumping, metering, monitoring, flow lines and other equipment directly associated with two or more oil wells, gas wells, or injection wells. Municipal Code means "Brighton Municipal Code" of the City of Brighton, Colorado. Oil and gas facility means equipment or improvements used or installed at an oil and gas location for the exploration, production, withdrawal, gathering, treatment, or processing of oil or natural gas. Oil and gas location means a definable area where an operator has disturbed or intends to disturb the land surface in order to locate an oil and gas facility. Operating plan means a general plan which describes an oil and gas exploration and production facility identifying the purpose, use, typical staffing pattern, seasonal or periodic considerations, routine hours of operation, source of services/infrastructure, any mitigation plans and any other information related to regular functioning of that facility. Operator means any person or entity who exercises the right to control the conduct of oil and gas operations. Production facilities means all storage, separation, treating, dehydration, artificial lift, power supply, compression, pumping, metering, monitoring, flow lines and other equipment directly associated with oil wells, gas wells, or injection wells. Recompletion operation means any action taken after the initial completion of a well, including the action and techniques of reentering the well and redoing or repairing the original completed well to restore the well's productivity. Residential building unit means a building or structure designed for use as a place of residency by a person, a family, or multiple families. The term includes manufactured, mobile and modular homes, except to the extent that any such manufactured, mobile, or modular home is intended for temporary occupancy or for business purposes. Setback location means the minimum distances from building units, high occupancy building units, or designated outside activity areas as established in COGCC rules. Surface owner means any person owning all or part of the surface of land upon which oil and gas operations are conducted, as shown by the tax records of the county in which the tract of land is situated, or any person with such rights under a recorded contract to purchase. Surface use agreement means any agreement in the nature of a contract or other form of document binding on the operator, including any lease, damage agreement, waiver, local government approval or permit, or other form of agreement, which governs the operator's activities on the surface in relation to locating a well, multi-well site, production facility, pipeline or any other oil and gas facility that supports oil and gas development located on the surface owner's property. Utilities report means utility line easements and rights-of-way within one hundred fifty (150) feet of the proposed oil and gas location and access road. For those facilities utilizing the power grid, it will also indicate any new power lines or other infrastructure necessary for the purpose of supplying electric power to oil and gas facilities. Well means an oil or gas well, a hole drilled for the purpose of producing oil or gas, a well into which fluids are injected, a stratigraphic well, a gas storage well, or a well used for the purpose of monitoring or observing a reservoir. Well site means the areas that are directly disturbed during the drilling and subsequent operation of, or affected by production facilities directly associated with, any oil well, gas well, or injection well and its associated well pad. Wellhead means the mouth of the well at which oil or gas is produced.
Ask a question about Brighton law
Corpus searches the Brighton sections it holds and shows the ones that match, with their citations. Free, no sign-in.