Sec. 13-12-190. - Industrial wastewater discharge permits.
(a) No significant industrial user shall discharge wastewater into the wastewater treatment plant without first obtaining an industrial wastewater discharge permit from the Director. The Director may require others to obtain industrial wastewater discharge permits as necessary to carry out the intent of this Article. All existing significant industrial users connected to or contributing to the POTW shall obtain an industrial wastewater discharge permit within one hundred eighty (180) days after the effective date of notice. (b) Permit applications. All users required to obtain an industrial wastewater discharge permit shall submit a permit application on the form provided by the City. The Director may require users to submit as part of an application all information the user deems necessary, including information and data on the nature and characteristics of the wastewater. In support of the application, the user shall submit, in units and terms appropriate for evaluation, the following information: (1) Name, address and location. (2) SIC number(s) according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972. (3) Time and duration of wastewater discharge. (4) Average daily and thirty-minute peak wastewater flow rates, including daily, monthly and seasonal variations, if any. (5) Site plan, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections and appurtenances by the size, location and elevation. (6) Description of activities, facilities and plant processes on the premises, including all materials which are or could be discharged. (7) Wastewater constituents and characteristics and any applicable state or national pretreatment standards, as determined by a reliable analytical laboratory. Sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to Section 304(g) of the Act and contained in 40 C.F.R. Part 136. (8) A statement regarding whether or not the local limits, and applicable state or national pretreatment standards, are being met on a consistent basis and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the user to meet the applicable standards. (9) If additional pretreatment and/or O&M will be required to meet the pretreatment or local limits discharge standards, the shortest schedule by which the user will provide such additional treatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to this schedule: a. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment or discharge standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). b. No increment referred to in Subparagraph a. above shall exceed nine (9) months. c. No later than fourteen (14) days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the Director, including as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine (9) months elapse between such progress reports to the Director. (10) Each product produced by type, amount, process or processes and rate of production. (11) Type and amount of raw materials processed (average and maximum per day). (12) Number and type of employees and hours of operation of the plant and proposed or actual hours of operation of the pretreatment system. (13) Any other information as may be deemed by the Director to be necessary to evaluate the permit application. (c) Permit decision. The Director will evaluate the information furnished by the applicant and may require additional information. Within ninety (90) days of receipt of a complete application, the Director will determine whether or not to issue an industrial wastewater discharge permit. (d) Permit issuance. The Director shall issue an industrial wastewater discharge permit to the applicant if the following conditions are met: (1) The proposed discharge of the applicant is in compliance with the prohibitions and limitations of this Article; (2) The proposed discharge of the applicant would permit the normal and efficient operation of the wastewater treatment system; (3) The proposed discharge of the applicant would not result in a violation by the POTW's permit; and (4) All applicable fees have been paid by the user. (e) Permit denial. If, in the judgment of the Director, the proposed discharge may have a deleterious effect upon the wastewater facilities, processes, equipment or receiving waters, or which otherwise create a hazard to life or constitute a public nuisance, the Director may: (1) Reject the wastes and notify the applicant in writing of such denial; (2) Require pretreatment to an acceptable condition for discharge to the public sewers; (3) Require control over the quantities and rates of discharge, including the installation of flow equalization facilities; (4) Require payment to cover the added cost of handling and treating the wastes not covered by existing taxes or sewer charges; and/or (5) If the Director requires the pretreatment or equalization of waste flows, the design and installation of the plants and equipment shall be subject to review and approval of the Director. The Director may deny any application for an industrial wastewater discharge permit. (f) Permit conditions. At a minimum, the permit must contain: (1) A statement of duration (not to exceed five [5] years); (2) A statement of nontransferability; (3) Effluent limitations based on the requirements of Sections 13-12-170 and 13-12-180, and any other applicable pretreatment standards; (4) Self-monitoring, sampling, reporting, notification and record keeping requirements, including an identification of the pollutants to be monitored, sampling location, sampling frequency and sample type, based on applicable federal, state and local requirements; (5) A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedules may not extend any compliance date beyond applicable federal deadlines; and (6) The permit may contain any conditions deemed appropriate by the Director to ensure compliance with this Article, and state and federal laws and regulations. (g) Administrative appeals. The permittee may petition the Director in writing to reconsider the terms of an industrial wastewater discharge permit within thirty (30) days of its issuance or denial. Failure to submit a timely written petition for review shall be deemed to be a waiver of the administrative appeal. In its petition, the permittee must indicate the provisions to which it objects, the reasons for this objection and alternative conditions, if any, it seeks to have placed on the industrial wastewater discharge permit. The effectiveness of the permit shall not be stayed pending the appeal. If the Director fails to act within thirty (30) days, a request for reconsideration shall be deemed to be denied. The decision of the Director shall be final. (h) Permit modifications. The Director may modify an industrial wastewater discharge permit for good cause, including but not limited to the following reasons: (1) To incorporate any new or revised federal, state or local pretreatment standards or requirements; (2) To address significant alterations or additions to the permittee's operation, process or wastewater volume or characteristics; (3) A change in the City's wastewater facilities that requires either a temporary or permanent reduction or elimination of the authorized discharge; (4) Information indicating that the permitted discharge poses a threat to the wastewater facilities, workers' health or safety or the receiving waters; (5) Violations of any terms or conditions of the permit; (6) Misrepresentations or failure to fully disclose all relevant facts in the application or in any required reporting; (7) To correct typographical or other errors in the permit; and/or (8) To reflect a transfer of ownership or operation. (i) Permit reissuance. A discharger with an expiring industrial wastewater discharge permit shall apply for permit reissuance by submitting a complete industrial wastewater discharge permit application, in accordance with Subsection 13-12-190(b), a minimum of ninety (90) days prior to the expiration of the discharger's existing industrial wastewater discharge permit. (j) Permit transfer prohibited. Industrial wastewater discharge permits are issued to a specific user for a specific operation. An industrial wastewater discharge permits shall not be reassigned or transferred or sold to a new owner, new user, different premises or a new or changed operation.
(Ord. 1735 §3, 2002; Ord. 2113 §3, 2011)
Ask a question about Brighton law
Corpus searches the Brighton sections it holds and shows the ones that match, with their citations. Free, no sign-in.