For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-8-70 — Post-construction stormwater management requirements

Municipal Code of the City of Brighton, Colorado (Codified through Ordinance No. 2508, adopted June 16, 2026. (Supp. No. 26, Update 2)) · Brighton Municipal Code § 14-8-70

Corpus is an independent public-information project, not the official City of Brighton website. Stable reference: corpuslaw.us/code/1cf51b35-a31e-4b9d-bcd2-0432583c75e3

Sec. 14-8-70. - Post-construction stormwater management requirements.

(a) All applications and approvals of applicable development and redevelopment sites shall include post-construction stormwater management requirements incorporated into the development design as approved. (1) Post-construction BMPs shall be designed and constructed according to City standards and specifications. (b) Responsibility for drainage structures. (1) Stormwater structural post-construction BMP located on private property shall be operated, repaired, maintained and replaced as necessary by the landowner of the property on which the BMP is located as required in this Section, unless the Maintenance Agreement or the Director, in writing, provides that a person or entity other than the landowner shall be responsible for the operation, repair, maintenance and replacement of such BMP. (2) Stormwater structural post-construction BMP located on private property shall be operated, repaired, maintained and replaced as necessary by a person other than the landowner of the property on which the BMP is located as required in this Section, as provided in the Maintenance Agreement or with the approval of the Director. (3) Prior to the approval of the development or redevelopment, the Director may require the landowner to create an association to be responsible for the operation, repair, maintenance and replacement of stormwater structural post-construction BMP. The bylaws, covenants and restrictions of the association shall include the legal responsibility to operate, repair, maintain and replace post-construction BMP installed in the development, as well as legal authority to levy an assessment on each owner to pay for the operation, repair, maintenance and replacement of the BMP, and provisions for a lien on an owner's property for failure to pay the assessment. (c) Long-term inspection of post-construction BMP. (1) The landowner or person responsible for any post-construction BMP shall perform regular inspections in accordance with the Maintenance Agreement on all required stormwater post-construction BMP and document repair, maintenance and replacement needs to ensure compliance with the requirements of this Article. (2) Maintenance records shall be retained for at least five (5) years, and shall be readily available to the Director upon request. (3) Upon written notification by the Director, the landowner or person responsible for any post-construction BMP shall, at his or her own cost and within a reasonable time period determined by the Director, have an inspection of the post-construction BMP conducted by a qualified professional; file with the Director a copy of the written report of inspection prepared by the professional; and, within the time period specified by the Director, complete any repair, maintenance or replacement work recommended in the report to the satisfaction of the Director. (d) Long-term maintenance of post-construction BMP. (1) All post-construction BMP, structural and nonstructural, shall be maintained in perpetuity, unless otherwise specified in writing by the Director. (2) Preventative and corrective repair, maintenance and replacement shall be performed to maintain the function and integrity of the stormwater post-construction BMP. (3) Repair, maintenance and replacement requirements of post-construction BMP include routine and nonroutine maintenance procedures. Routine maintenance procedures include, but are not limited to, inspections, debris and litter control, mechanical components maintenance and replacement, vegetation management and other routine tasks. Nonroutine procedures are those associated with removing accumulated sediments from stormwater quality facilities, restoration of eroded areas, snow and ice removal, fence repair or replacement, restoration of vegetation and long-term structural repair, maintenance and replacement. (4) The City may enforce the requirements of this Article and the Maintenance Agreement, as provided in Sections 14-8-90 and 14-8-100 below. (e) Maintenance Agreement. (1) As a condition of development or redevelopment approval, the landowner, or person responsible therefor, shall agree in writing to maintain post-construction BMP to their design capacity unless or until the City relieves the landowner or responsible person of that responsibility in writing. The obligation to maintain post-construction BMP, and the City's legal right to enforce that obligation, shall be memorialized on the subdivision plat, annexation map, subdivision development agreement or Maintenance Agreement or other instrument in a form acceptable to the City. (2) The subdivision plat, annexation map, subdivision development agreement or Maintenance Agreement shall be filed of the record in the office of the clerk and recorder of the county or counties in which the property and the post-construction BMP are located, and the terms thereof shall run with the land and be binding on all subsequent owners of the property, the person responsible for operation, repair, maintenance and replacement of the BMP or his or her successors and assigns, to ensure structural BMP function as designed and nonstructural BMP are preserved and not altered. (3) The development or Maintenance Agreement shall include: a. The name and contact information of the landowner of the property on which all post-construction BMP are located; b. The names and contact information of the persons responsible for long-term operation, repair, maintenance and replacement of all post-construction BMP; c. The names and contact information of the persons responsible for financing long-term operations, repairs, maintenance and replacement, including emergency repairs, of all post-construction BMP; d. The names and contact information of the persons responsible for inspecting all post-construction BMP; e. Description and identification of all stormwater post-construction BMP, structural and nonstructural; f. Description of specific preventative maintenance tasks and maintenance frequency for all post-construction BMP; g. Description of inspection procedures and frequency for all post-construction BMP; h. Designation of drainage easements on the property sufficient to ensure access to all post-construction BMP on a permanent basis for the purpose of inspection, operation, repair, maintenance and replacement. Such easements shall be recorded in the office of the clerk and recorder of the applicable county, and the easements shall run with the land; i. An estimate of the annual costs for operation, repair, maintenance and replacement of post-construction BMP, including cost of sediment, debris or trash removal and disposal; j. Warranty and operational standards from the manufacturer of any manufactured BMP structure or device; k. Signed certification by the landowner and person responsible for operation, repair, maintenance and replacement of BMP stating that the agreement is accurate and complete; and l. Other information or provision as required by the Director.

(Ord. 1962 §1, 2008; Ord. 2260 §19, 2017)

Ask a question about Brighton law

Corpus searches the Brighton sections it holds and shows the ones that match, with their citations. Free, no sign-in.