For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-9-82 — Credit eligibility

Municipal Code of the City of Brighton, Colorado (Codified through Ordinance No. 2508, adopted June 16, 2026. (Supp. No. 26, Update 2)) · Brighton Municipal Code § 14-9-82

Corpus is an independent public-information project, not the official City of Brighton website. Stable reference: corpuslaw.us/code/282e7999-55ba-43a3-a3b3-a1c486fa4b1a

Sec. 14-9-82. - Credit eligibility.

(a) Multi-family residential, non-residential, commercial, mixed use, and schools may be eligible for up to a sixty-five percent (65%) credit against their monthly charges. The credit is based on private drainage infrastructure improvements that provide a regional benefit. (b) The Utilities Director is responsible for creating rules and procedures to administer the credit program. (c) The amount of the credit shall be determined by the Utilities Director and may include but is not limited to a review of the property owner's documentation substantiating the storm improvements, an engineer's report, or a physical inspection by Utilities staff. (d) Ongoing credit will only be available to properties that maintain their structural controls in a fully functional condition in accordance with City standards. (e) Credit may be granted for a maximum of three (3) years from the date of approval. After expiration, property owners may be required to submit a renewal credit application, or the credit may be administratively continued at the sole discretion of the Director. Renewed credits are contingent on the proper function of the drainage structure.

(Ord. 2362 §4, 2021; Ord. 2454, §28, 2024)

Ask a question about Brighton law

Corpus searches the Brighton sections it holds and shows the ones that match, with their citations. Free, no sign-in.