§ 3.04 — Required Improvements
Municipal Code of the City of Brighton, Colorado (Codified through Ordinance No. 2508, adopted June 16, 2026. (Supp. No. 26, Update 2)) · Brighton Land Use and Development Code § 3.04
Corpus is an independent public-information project, not the official City of Brighton website. Stable reference: corpuslaw.us/code/0c3b9583-065c-4c90-835b-0686daabb5b2
3.04 - Required Improvements
A. Intent. The intent of this section is to: 1. Ensure that all improvements necessary to serve lots within a subdivision are constructed, inspected or otherwise assured of completion prior to the issuance of building permits. 2. Prevent the location or design of a subdivision from placing an undue burden on public utility systems and community facilities serving other areas. 3. Provide appropriate apportionment of costs and offset higher net costs or premature costs to the public necessitated by the subdivision. 4. Protect against subdivisions where soil, subsoil or flooding conditions would create potential dangers to public health or safety. 5. Coordinate subdivisions and construction of required improvements with other anticipated improvements or with future growth. B. General Requirements. 1. All required improvements shall be outlined in the subdivision plan, and be incorporated into the final design at the time of final plat as provided in Section 2.02. 2. The applicant shall post a performance bond, letter of credit or similar security instrument drawn in favor of the City in an amount equal to 115% of the estimated cost of the construction of improvements, determined by the City Engineer. 3. The schedule for construction of improvements may be divided into phases according to an approved preliminary or final plat as specified in Section 2.02. 4. Required improvements shall be constructed in accordance with the Public Works Standards and Specifications and in accordance with approved plans and profiles and the construction requirements and specifications of the City. 5. Finished plans of all public improvements as built shall be required before the City shall accept improvements. The approved design plans are acceptable if they remain true after construction and if attested to by a registered engineer. 6. The performance guarantee shall be released upon written request by the applicant to the Director or his or her designee, only after all improvements for the subdivision, or any particular phases noted on a phasing plan, are completed, inspected and finally accepted by the City. 7. The applicant shall be responsible for the repair, replacement and maintenance of any required improvement which fails to function or meet the standards of the City due to defects in material or workmanship, within 2 years from the date of final acceptance. C. Improvements. The following improvements are required to be constructed with the subdivision, except where facilities sufficient to serve the subdivision exist and have been approved by the City. The size, type and general location of each improvement, and estimated cost shall be included as part of the final plat submittal and review. 1. Easements and utility services, including water lines, sanitary sewer, and other public utilities 2. Easements and drainage systems including storm sewer lines, natural and constructed conveyances, retention/detention ponds, and similar facilities 3. Retaining walls associated with an approved grading plan. 4. Wells. 5. Fire Hydrants. 6. Rights-of-ways and streets. 7. Access and alleys and other required vehicle circulation and parking components, and easements where shared or cross-access is proposed. 8. Streetscape elements, including curb, gutter, sidewalks, landscape and amenity areas, street lights, and street signs. 9. Traffic signal lights and signs, and any other safety measures in the rights-of-way. 10. Open and civic spaces, whether public, common, or shared. 11. Survey monuments, including range points and lot pins as required by the City Engineer. In general, this shall be at all beginning and end points, all angle points, or any change in radii of a curved line, and no more than 1,400 feet apart on any straight boundary line. In addition, minimum half-inch steel pins shall be set at all lot corners with a Colorado registration number of the surveyor responsible for the monument. 12. Communication and electric distribution services and lines, which shall be underground with the exception of meters, terming boxes and other facilities. All facilities shall be in easements or the right-of-way subject to the design specifications and approval of the City through the plat review process. Every effort shall be made to place pedestals in accessible locations close to corner lot lines but to minimize their appearance through streetscape design, landscape materials, or other site planning and urban design strategies that minimize their impact on the public realm. D. Reimbursement Agreements. Applicants constructing required improvements for their property within their project or through undeveloped areas to serve their project shall be responsible for the entire cost of the improvements. Whenever any portions of the required public improvements are part of a planned future facility for the City, serving an area larger than the subdivision and its impact, the City may require and the applicant may enter into an upsizing agreement. The City and the applicant shall negotiate the following aspects of the agreement prior to approval of the plat: 1. The applicant shall construct the facilities as planned by the City for future capacity as part of the subdivision and development process. 2. The applicant shall be responsible for the portion of the costs required to serve the proposed subdivision based on actual total cost to build the facilities absent any upsizing agreement. 3. The City shall be responsible for any incremental costs to expand the facility to the planned capacity, beyond the capacity to serve the subdivision. The City's participation may be based by the applicant bidding the project with bid alternates: one alternate to build the minimum required facility to serve the subdivision or development and the second bid alternate being for the upsized facility planned by the City. 4. The City may coordinate its reimbursement schedule to the applicant with fees assessed to other property in coordination with any future development of land benefitting from the improvements, but in no case may this period be extended beyond 8 years from the date the improvement is made, unless specifically agreed to by the applicant. 5. The agreement shall be subject to approval by the City Attorney.
(Ord. No. 2349, § 4, 12-15-2020)
Ask a question about Brighton law
Corpus searches the Brighton sections it holds and shows the ones that match, with their citations. Free, no sign-in.