For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17-38-060 — PUD plan; contents

Municipal Code of the City and County of Broomfield, Colorado (Codified through Ordinance No. 2304, adopted May 26, 2026 (Supp. No. 54)) · Broomfield Municipal Code § 17-38-060

Corpus is an independent public-information project, not the official City of Broomfield website. Stable reference: corpuslaw.us/code/70d66ed6-9b60-4d4e-92c7-457a1cde57ae

17-38-060 - PUD plan; contents.

The PUD plan shall contain the following information: (A) All information listed in section 16-16-040, B.M.C. (B) Identification of all proposed land uses by area, type, location, and size. (C) Statement of project intent including the following information: (1) Overall design concept; (2) Design concept for each type of residential layout or lot size; (3) Type and style of dwellings or buildings; (4) If project is a deviation from master plan: a. Detailed description of architecture and site design; b. Lot sizes and distribution within project; c. Residential dwelling size according to lot size; and d. Percentage distribution of residential dwelling size and lot size. (D) Project phasing plan showing projected build-out dates for each area. (E) Statement of methods for addressing unique features of the site. (F) Chart with each land use area listed showing the following information: (1) Gross acreage; (2) Floor area ratios (for commercial and industrial); (3) Number of dwellings units (for residential); (4) Dwelling units per acre (for residential); (5) Minimum lot sizes; (6) Minimum setbacks of principal, accessory buildings; (7) Minimum floor areas (for residential); (8) Maximum building height; and (9) Principal and accessory uses. (G) A list of any proposed deviations from the provisions of title 14, 16, or 17, B.M.C. (H) Certification for approval by the land use review commission with signature lines for the chair and secretary. (I) Certification for approval by the city council with signature lines for the mayor and city clerk. (J) The location of any plugged and abandoned oil and gas well and its production site or any former oil and production sites located within the boundaries of the PUD plan or within 200 feet of such boundaries on abutting property.

(Ord. 725 §1, 1987; Ord. 1111 §27, 1995; Ord. 1399 §1, 1999; Ord. 1698 §7, 2002; Ord. 1935 §47, 2011) (Ord. No. 2138, § 47, 4-6-21)

Ask a question about Broomfield law

Corpus searches the Broomfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.