§ 17-40-130 — Duties and responsibilities of the city engineer
Municipal Code of the City and County of Broomfield, Colorado (Codified through Ordinance No. 2304, adopted May 26, 2026 (Supp. No. 54)) · Broomfield Municipal Code § 17-40-130
Corpus is an independent public-information project, not the official City of Broomfield website. Stable reference: corpuslaw.us/code/46a9afff-b8ce-485e-8941-6a576ea997a3
17-40-130 - Duties and responsibilities of the city engineer.
Duties of the city engineer shall include, but not be limited to: (A) Permit review. (1) Review all development permits to determine that the permit requirements of this chapter have been satisfied; (2) Review all development permits to determine that all necessary permits have been obtained from federal, state, or local governmental agencies from which prior approval is required; (3) Review all development permits to determine if the proposed development is located in the floodway. If located in the floodway, assure that the encroachment provisions of subsection 17-40-170(A) are met. (B) Use of other base flood data. When base flood elevation data has not been provided in accordance with section 17-40-060, the city engineer shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from any federal, state, or other source as criteriafor requiring that new construction, substantial improvements, or other development in Zone A are administered in accordance with section 17-40-160. (1) For waterways with base flood elevations for which a regulatory floodway has not been designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within Zones A1-30 and AE on the city's FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one-half foot at any point within the city. (2) Under the provisions of 44 C.F.R Chapter 1, Section 65.12, of the National Flood Insurance Program regulations, the city may approve certain development in Zones A1-30, AE, and AH, on the city's FIRM which increases the water surface elevation of the base flood by more than one-half foot, provided that the city first applies for a conditional FIRM revision through FEMA (Conditional Letter of Map Revision), fulfills the requirements for such revisions as established under the provisions of Section 65.12, and receives FEMA approval. (C) Information to be obtained and maintained. (1) Obtain and record the actual elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved structures, and whether or not the structure contains a basement. (2) For all new or substantially improved floodproofed structures, (i) verify and record the actual elevation (in relation to mean sea level) to which the structure has been floodproofed and (ii) maintain the floodproofing certifications required in paragraph 17-40-160(B)(3). (3) Maintain for public inspection all records pertaining to the provisions of this chapter. (D) Alteration of watercourses. (1) Notify adjacent communities and the Colorado Water Conservation Board prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency. (2) Require that maintenance is provided within the altered or relocated portion of said watercourse so that the flood-carrying capacity is not diminished. a. Channelization and flow diversion projects shall appropriately consider issues of sediment transport, erosion, deposition and channel migration and properly mitigate potential problems through the project as well as upstream and downstream of any improvement activity. A detailed analysis of sediment transport and overall channel stability should be considered, when appropriate, to assist in determining the most appropriate design. b. Channelization and flow diversion projects shall evaluate the residual 100-year floodplain. c. Any channelization or other stream alteration activity proposed by a project proponent must be evaluated for its impact on the regulatory floodplain and be in compliance with all applicable federal, state and local floodplain rules, regulations and ordinances. d. Any stream alteration activity shall be designed and sealed by a registered Colorado professional engineer or certified professional hydrologist. e. Within the regulatory floodway, stream alteration activities shall not be constructed unless the project proponent demonstrates through a floodway analysis and report, sealed by a registered Colorado professional engineer, that there is not more than 0.00-foot rise in the proposed condition of the floodway resulting from the project compared to existing conditions (otherwise known as a No-Rise Certification), unless the city first applies for floodway revision in accordance with section 17-40-170 and a CLOMR. (E) Interpretation of FIRM boundaries. Make interpretations, where needed, as to the exact location of the boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions). The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in section 17-40-140.
(Ord. 1972 §3, 2013)
Ask a question about Broomfield law
Corpus searches the Broomfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
