17-71-070 - Tree protection measures during construction.

(A) Protection of existing trees during the construction process. Site construction shall take into account the life and good health of trees preserved on the site. The following procedures shall be followed for tree protection, unless alternate mitigation measures are approved in the tree preservation plan: (1) Tree protection fencing shall be installed prior to any site activity and shall remain in place and be maintained in the condition in which they were installed for the duration of the construction activity. Protective fencing or barriers shall be set up to visibly show the tree protection zone. Chain link fencing six feet high, with steel posts driven into the ground at not more than ten foot intervals is required, but other barriers may be approved in the tree preservation plan based on site conditions. (2) All equipment, including foot traffic shall remain outside of the tree protection zone. (3) If roots greater than one-inch in diameter require removal, a clean cut shall be accomplished using a sharp hand tool. A maximum of two, three-inch diameter roots per tree are permitted for removal. The removal of additional roots three-inches or greater in diameter requires approval of the city and county landscape architect, city and county forester, or their designee. (4) Limb removal shall be accomplished under the direction of a certified I registered arborist, forester or licensed landscape architect before construction begins. (5) Concrete washout areas shall be designated on the property, and such areas shall not flow into or across the tree protection zone. (6) No excavation is permitted within the tree protection zone. If excavation is required within the tree protection zone, the city and county forester, the city and county landscape architect or their designee must be notified prior to start of excavation activities. (7) No branches or bark are to be damaged within the tree protection zone. If it appears any work may cause damage to the branches of a tree, the property owner or their contractor shall contact the city and county forester or the city and county landscape architect, or their designee for a determination as to whether such damage is likely and pruning is necessary. (8) No stockpiling of soil, materials, or supplies of any kind are permitted within the tree protection zone. (9) No vehicle parking is permitted within the tree protection zone. (10) The soil shall not be compacted within the tree protection zone.

(Ord. No. 2240, § 1, 12-10-2024)