§ 13.12.080 — System development fees

Municipal Code of the Town of Castle Rock, Colorado (Codified through Ordinance No. 2026-014, enacted May 5, 2026 (Supp. No. 63)) · Castle Rock Municipal Code § 13.12.080

Corpus is an independent public-information project, not the official City of Castle Rock website. Stable reference: corpuslaw.us/code/e053a780-5eeb-4e23-98e5-a128b7ff4efe

13.12.080 - System development fees.

A. In order to defray the capital costs of utilizing, expanding and developing municipal facilities for the provision of water, system development fees for the construction of any new commercial and industrial buildings and multifamily residential dwellings shall be assessed in accordance with the following schedule of rates in effect as of the date of submission of a complete building permit application: Water System Development Fees - Commercial and Industrial Buildings and Multifamily Residential Dwellings Meter Size | SFE | Meter Capacity (GPM*) | 2026 and thereafter ⅗" x ¾" | 0.60 | 18 | $5,959 ⅝" x ¾" | 0.67 | 20 | $6,654 ¾" | 1.00 | 30 | $9,931 1" | 1.67 | 50 | $16,585 1.5" | 3.33 | 100 | $33,070 2" C2 | 6.67 | 200 | $66,240 2" T2 | 8.33 | 250 | $82,725 3" C2 | 16.67 | 500 | $165,550 3" T2 | 21.67 | 650 | $215,205 4" C2 | 33.33 | 1,000 | $331,000 4" T2 | 41.67 | 1,250 | $413,825 6" C2 | 66.67 | 2,000 | $662,100 6" T2 | 83.33 | 2,500 | $827,550 * Potential flow capacity in gallons per minute. B. Reserved. C. In order to defray the capital costs of utilizing, expanding and developing municipal facilities for the provision of wastewater, system development fees for the construction of any new commercial and industrial buildings and multifamily residential dwellings shall be assessed in accordance with the following schedule of rates in effect as of the date of submission of a complete building permit application: Wastewater System Development Fees - Commercial and Industrial Buildings and Multifamily Residential Dwellings* Meter Size | SFE | Meter Capacity (GPM*) | 2026 and thereafter ⅗" x ¾" | .60 | 18 | $3,678 ⅝" x ¾" | .67 | 20 | $4,107 ¾" | 1.00 | 30 | $6,130 1" | 1.67 | 50 | $10,237 1.5" | 3.33 | 100 | $20,413 2" C2 | 6.67 | 200 | $40,887 2" T2 | 8.33 | 250 | $51,063 3" C2 | 16.67 | 500 | $102,187 3" T2 | 21.67 | 650 | $132,837 4" C2 | 33.33 | 1,000 | $204,313 4" T2 | 41.67 | 1,250 | $255,437 6" C2 | 66.67 | 2,000 | $408,687 6" T2 | 83.33 | 2,500 | $510,813 * Does not apply to SFEs served by Pinery Water and Wastewater District. D. Reserved. E. Payment of the applicable system development fees shall be a condition to the issuance of the building permit. F. The applicant for a building permit shall furnish the certification of a registered professional engineer reasonably qualified to make such certification, that the building, improvements or development can be adequately serviced to established and recognized standards. The water supply required for any building and/or irrigation shall be determined by total load at peak demand in terms of water supply fixture units and gallons per minute (gpm). G. Nonpotable refers to Town-produced untreated or "raw" Denver Basin groundwater delivered exclusively for the purpose of irrigation. Unless otherwise specifically provided to the contrary, the provision of this Chapter pertaining to potable water service shall be similarly applicable to nonpotable water service. H. If the required system development fees are not paid for whatever reason, upon discovery of such nonpayment, the Town may revoke any and all outstanding development approvals, including building permits, or certificates of occupancy, and/or terminate municipal services, subject to the due process requirements of Chapter 13.14. I. With payment of the required system development fee and the renewable water resource fee imposed under Section 4.04.150 of this Code and issuance of a building permit, the permittee is granted a reservation of water and wastewater service in the amount of the specified SFE for a period coinciding with the term that a building permit is valid under Section 15.04.030 of this Code. Reservation of water, renewable water and wastewater service by prepurchase of SFE through contract with the Town shall be subject to specific service commitment and reservation terms contained therein, irrespective of the foregoing provision. J. A fee credit may be approved by the Town Manager. A fee credit may be considered in the event that the applicant commits, pursuant to a development agreement, subdivision improvement agreement or other legally binding instrument approved by the Town, to provide public capital facilities for which an applicable system development fee would otherwise be utilized. The eligibility and amount of the fee credit shall be determined by the Town Manager, taking into consideration the intent and purpose of the applicable system development fee and the monetary value of the public capital facilities to be provided by the applicant which otherwise would be paid for from system development fee proceeds. No fee credit shall be granted for public capital facilities otherwise required by any applicable Town Code or ordinance. An application for a fee credit shall be submitted to the Town Manager utilizing a form and information as may be required by the Town Manager. The Town Manager's decision on a fee credit application may be appealed to the Town Council. K. A qualifying attainable housing project shall be eligible to receive up to a one-hundred-percent reduction, per qualifying attainable housing unit, in the amount of the otherwise applicable system development fees. A qualifying attainable housing project and unit shall be defined as a housing project or unit participating in an attainable or affordable housing program through the Douglas County Housing Partnership, Colorado Housing Finance Authority or other certified local, state or federal attainable housing program. An application for this attainable housing fee reduction must be approved by the Town Council. L. The Town Manager may approve reductions or waivers in otherwise applicable system development fees up to a maximum of $100,000.00 for qualifying economic development priority projects, subject to the project incentive cap as defined in Section 2.25.020 of this Code. Economic development priority project fee reduction in an amount greater than $100,000.00 shall require the approval of the Town Council. The Town Manager may also approve deferrals of system development fees pursuant to Subsection 2.25.030.D. M. Effective July 1, 2026, the water system development fee for the construction of any new single-family residential dwelling (i.e., one-family and two-family dwellings as defined by Section 17.14.010) within the Town shall be imposed in accordance with the following schedule. Such fee shall be collected at the time a complete building permit application for the dwelling is submitted to the Town. Water System Development Fees - Single-Family Residential Dwellings Gross Floor Area in square feet | SFE | July 1, 2026, and thereafter Less than 500 | 0.27 | $ 2,676.02 500—999 | 0.33 | $ 3,270.69 1,000—1,499 | 0.39 | $ 3,865.36 1,500—1,999 | 0.42 | $ 4,162.69 2,000—2,499 | 0.65 | $ 6,481.91 2,500—2,999 | 0.81 | $ 8,087.52 3,000—3,499 | 0.82 | $ 8,146.99 3,500—3,999 | 0.83 | $ 8,206.46 4,000—4,499 | 0.85 | $ 8,444.32 4,500—4,999 | 0.87 | $ 8,682.19 5,000—5,499 | 0.93 | $ 9,217.40 5,500—5,999 | 1.00 | $ 9,931.00 6,000—6,499 | 1.05 | $ 10,406.74 6,500—6,999 | 1.06 | $ 10,525.67 7,000—7,499 | 1.11 | $ 11,001.41 7,500—7,999 | 1.15 | $ 11,417.68 8,000—8,499 | 1.20 | $ 11,893.41 8,500—8,999 | 1.24 | $ 12,309.68 9,000—9,499 | 1.29 | $ 12,785.42 9,500—9,999 | 1.34 | $ 13,261.16 Over 10,000 | 1.38 | $ 13,677.43 N. Effective July 1, 2026, the wastewater system development fee for the construction of any new single-family residential dwelling (i.e., one-family and two-family dwellings as defined by Section 17.14.010) within the Town shall be imposed in accordance with the following schedule. Such fee shall be collected at the time a complete building permit application for the dwelling is submitted to the Town. Wastewater System Development Fees - Single-Family Residential Dwellings Gross Floor Area in square feet | SFE | July 1, 2026, and thereafter Less than 500 | 0.27 | $ 1,651.80 500—999 | 0.33 | $ 2,018.86 1,000—1,499 | 0.39 | $ 2,385.93 1,500—1,999 | 0.42 | $ 2,569.46 2,000—2,499 | 0.65 | $ 4,001.02 2,500—2,999 | 0.81 | $ 4,992.10 3,000—3,499 | 0.82 | $ 5,028.80 3,500—3,999 | 0.83 | $ 5,065.51 4,000—4,499 | 0.85 | $ 5,212.34 4,500—4,999 | 0.87 | $ 5,359.16 5,000—5,499 | 0.93 | $ 5,689.52 5,500—5,999 | 1.00 | $ 6,130.00 6,000—6,499 | 1.05 | $ 6,423.65 6,500—6,999 | 1.06 | $ 6,497.07 7,000—7,499 | 1.11 | $ 6,790.72 7,500—7,999 | 1.15 | $ 7,047.66 8,000—8,499 | 1.20 | $ 7,341.32 8,500—8,999 | 1.24 | $ 7,598.26 9,000—9,499 | 1.29 | $ 7,891.92 9,500—9,999 | 1.34 | $ 8,185.57 Over 10,000 | 1.38 | $ 8,442.51 O. For purposes of subsections M and N of this Section, "gross floor area" shall mean the sum of the horizontal area of all floors of a building or structure, measured from the exterior face of exterior walls, or from the centerline of walls separating attached buildings. "Gross floor area" includes all enclosed and roofed floor space within the building, including basements, mezzanines, and interior circulation areas, but excludes parking garages and areas not enclosed by walls, including open balconies, decks, patios, and similar exterior spaces.

(Ord. No. 2026-014, §§ 4—9, 5-5-2026; Ord. No. 2025-033, §§ 4, 5, 10-21-2025; Ord. No. 2024-017, §§ 4, 5, 9-17-2024; Ord. No. 2023-027, §§ 4, 5, 11-7-2023; Ord. No. 2022-025, § 7, 10-18-2022; Ord. No. 2021-027, §§ 5, 6, 12-7-2021; Ord. No. 2020-017, § 5, 9-15-2020, Eff. 1-1-2021; Ord. No. 2019-030, § 5, 9-17-2019; Ord. No. 2018-031, §§ 6, 7, 9-18-2018; Ord. No. 2017-027, § 6, 9-19-2017; Ord. No. 2016-044, § 3.J., 12-6-2016; Ord. No. 2016-030, § 6, 9-20-2016; Ord. No. 2015-46, § 6, 11-3-2015; Ord. No. 2015-05, § 6, 3-3-2015; Ord. No. 2014-31, § 5, 11-18-2014; Ord. 2013-34 § 7, 2013; Ord. 2012-30 § 5, 2012; Ord. 2011-31 § 3, 2011; Ord. 2011-22 § 5, 2011; Ord. 2011-21 § 7, 2011; Ord. 2009-20 § 3, 2009; Ord. 2009-02 § 2, 2009; Ord. 2006-45 §§ 1, 2, 2006; Ord. 2006-12 § 3, 2006; Ord. 2005-35 §§ 1, 2, 2005; Ord. 2004-54 § 6, 2004; Ord. 2002-11 § 1, 2002; Ord. 97-18 § 1(part), 1997; Ord. 97-09 § 1, 1997; Ord. 96-18 § 1, 1996; Ord. 93-5 § 2(part), 1993)