§ 15.58.040 — Performance surety

Municipal Code of the Town of Castle Rock, Colorado (Codified through Ordinance No. 2026-014, enacted May 5, 2026 (Supp. No. 63)) · Castle Rock Municipal Code § 15.58.040

Corpus is an independent public-information project, not the official City of Castle Rock website. Stable reference: corpuslaw.us/code/a2b0bf58-4963-4be5-97bc-e46e0ece4bba

15.58.040 - Performance surety.

A. Unless otherwise specified by a Franchise Agreement with the Town or superseded by an Improvement Agreement, a performance Surety securing the completion of all Public Improvements shall be provided to the Town. The performance Surety shall be a condition to receiving a Construction Permit. The performance Surety amount shall be based on the Public Improvements cost, as identified on the approved Construction Documents, signed and stamped by a licensed professional engineer in the state of Colorado. B. The amount of the performance Surety will vary with the type of security provided, as follows: Surety Type | Public Improvements Amount of Opinion of Cost Bond | 100% Letter of Credit | 75% Cash/Escrow | 65% C. If the Surety is provided as a Bond, Letter of Credit or Escrow account, the Town shall review, provide comments and approve all language, conditions and terms of the agreement prior to it being finalized. D. For Projects deemed by the Town to be of Regional Significance or elements of the Project deemed by the Town to be of Regional Significance, Surety in the amount of 100% of the costs for such work must be provided, irrespective of the type of performance Surety provided. E. Developer shall have the option of providing one performance Surety for all work, or two separate Performance Sureties for: 1. Below-ground work, including but not limited to over lot grading or earth excavation processes, storm drain facilities and related appurtenances, culverts, channels, water distribution or transmission facilities and related appurtenances, sanitary sewer collection facilities and related appurtenances, water and wastewater treatment facilities or any other facilities located below ground 2. Above-ground work, including but not limited to pavement, curb and gutter, sidewalk, pedestrian/bike/equestrian paths, street lighting bridges, pavement markings/signage/striping, traffic signals and related appurtenance, landscaping and erosion control or any other facilities located above ground; and F. Upon request of the Developer, the performance Sureties may be reduced incrementally as general phases of the Project are completed in conformance with the Construction Documents and to the satisfaction of the Town. The Developer must provide a revised Consultant Engineer's Opinion of Cost to the Town for review, if required, and other appropriate documentation along with a fee (in accordance with the current Development Services Fee Schedule) for each incremental performance Surety reduction. The performance Sureties shall never be reduced to less than 15% of the total estimated cost of the work as determined by the Opinion of Costs.

(Ord. 2012-16 §1, 2012)