For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.10.030 — Floodplain development permit procedures

Municipal Code of the Town of Castle Rock, Colorado (Codified through Ordinance No. 2026-014, enacted May 5, 2026 (Supp. No. 63)) · Castle Rock Municipal Code § 18.10.030

Corpus is an independent public-information project, not the official City of Castle Rock website. Stable reference: corpuslaw.us/code/585c4a39-5fe8-49ba-8d48-6936487ade02

18.10.030 - Floodplain development permit procedures.

A. Floodplain development permit application. The property owner shall submit to the Floodplain Administrator an application for a floodplain development permit on forms furnished by the Town. Sufficient information must be provided with the application to determine the impact of the proposed activities within the floodplain and ensure compliance with the requirements of this Title. At a minimum, the following information shall be required: 1. A complete description and applicable drawings of the activities that are proposed. The drawings shall include an accurate representation of the location and extent of the proposed floodplain activities. Construction drawings or other representation of the work to be completed must be provided, drawn to scale, showing the type, location, dimensions and elevations of existing and proposed improvements, alterations and structures, and the location of the foregoing in relation to the Special Flood Hazard Area and the Base Flood Elevation. 2. All plan view, profiles, cross-sections and details as applicable or required to justify compliance with the provisions as set forth in Chapter 18.12, CRMC, and other applicable Floodplain Regulations. 3. Accurate mapping, depicting all applicable Special Flood Hazard Areas that affect the property. All known floodplain delineations including floodway, floodway fringe and areas of shallow flooding must be shown. Base Flood Elevation information, if available, must be shown. For Special Flood Hazard Areas that do not have accurate delineation or base flood information available, it may be necessary to provide hydrologic and/or hydraulic analysis. The source of all mapping and study information is to be provided. 4. A flood modification study for watercourse alteration activities. The scope and extent of the study will be in accordance with the mapping designation of the floodplain and determined by the Floodplain Administrator. Submittal requirements for flood modification studies are set forth in the Town of Castle Rock Storm Drainage Design and Technical Criteria Manual, as amended. 5. Documentation of approval from all necessary federal, state or local governmental agencies from which prior authorization is required. B. Approval or denial of a floodplain development permit by the Floodplain Administrator shall be based on all of the provisions of this Title and the following relevant factors: 1. The danger to life and property due to flooding or erosion damage; 2. The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner(s); 3. The danger that materials may be swept onto other lands to the injury of others; 4. The compatibility of the proposed use with existing and anticipated development; 5. The safety of access to the property in times of flood for ordinary and emergency vehicles; 6. The costs of providing governmental services during and after flood conditions, including maintenance and repair of streets and bridges and public utilities and facilities such as sewer, gas, electrical and water systems; 7. The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters expected at the site; 8. The necessity to the facility of a waterfront location, where applicable; 9. The availability of alternative locations not subject to flooding or erosion damage for the proposed use; 10. The relationship of the proposed use to the comprehensive plan for that area. C. Conditional permits. Upon consideration of these provisions and the intent of this Section, the Floodplain Administrator may require any of the following as conditions to the granting of a floodplain development permit: 1. Modification of waste disposal and water supply facilities. 2. Limitations of periods of use and operation. 3. Imposition of operational controls. 4. Bonds or other financial securities which may be required in order to assure that improvements will be made according to the provisions of the permit, and/or that adequate maintenance will be provided. 5. Implementation of flood hazard mitigation measures. Through the floodplain development process, the Floodplain Administrator may require the applicant to submit a plan or document illustrating the flood hazard mitigation measures to be employed. These measures may include: a. Anchorage to resist flotation and lateral movement; b. Installation of watertight doors, bulkheads and shutters; c. Reinforcement of walls to resist water pressures; d. Use of paints, membranes or mortars to reduce seepage of water through walls; e. Addition of mass weight to structures to resist flotation; f. Installation of pumps to lower water levels in structures; g. Construction of water supply and waste treatment systems so as to prevent the entrance of floodwaters; h. Pumping facilities for subsurface external foundation wall and basement floor pressures; i. Construction to resist rupture or collapse caused by water pressure or floating debris; and j. Cutoff valves on sewer lines or the elimination of gravity flow basement drains. D. Certificate of Occupancy and acceptance of improvements. No land within the 100-year floodplain shall be occupied or used and no structure which is erected, placed, moved or structurally altered shall be used or changed in use until the Town approves a Certificate of Occupancy stating compliance with the provisions of this Title. The approval of Certificates of Occupancy for all uses and structures within lands located in the floodway district and the floodway fringe district are subject to verification that the premises and structures thereon conform with all of the requirements of this Title. 1. When there has been fill, excavation, erection or substantial improvement of a structure or construction, the applicant shall provide certification by a registered professional engineer that the finished fill, excavation, building floor elevations, floodproofing measures or other flood protection measures were accomplished in compliance with the provisions of this Title. Certification of the adequacy of the floodproofing of a building may be provided by a registered architect in lieu of a professional engineer. 2. The certification provided by the professional engineer or architect shall include the elevation, in relation to mean sea level, of the lowest floor, including basement, of all buildings that have not been floodproofed. Where buildings have been floodproofed, the elevation of the floodproofing must be established by certification and thereafter maintained in compliance with this Title. 3. A no-rise certification may be required upon completion of improvements to demonstrate that floodway encroachments have been constructed in accordance with the requirements set forth in Subsection 18.12.050.D., CRMC. No building permits shall be issued until the no-rise certification has been submitted and approved. 4. A Letter of Map Revision (LOMR) or Letter of Map Revision Based on Fill (LOMR-F) shall be required for development that alters the floodplain, shall be submitted within six months of the work and shall be approved by FEMA.

(Ord. 2013-38 §1, 2013)

Ask a question about Castle Rock law

Corpus searches the Castle Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.