For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21.05.010 — Application materials for all matters of state interest

Municipal Code of the Town of Castle Rock, Colorado (Codified through Ordinance No. 2026-014, enacted May 5, 2026 (Supp. No. 63)) · Castle Rock Municipal Code § 21.05.010

Corpus is an independent public-information project, not the official City of Castle Rock website. Stable reference: corpuslaw.us/code/cc77591f-d63d-4806-a27e-4cba26637513

21.05.010 - Application materials for all matters of state interest.

The following materials are required for all permit applications for designated matters of state interest. The Manager may waive one or more of the application materials when the information would not be relevant to a determination as to whether the Project complies with the approval standards in Chapter 21.06 of these Regulations. For site selection and construction or extension of domestic water and sewage treatment systems, the materials shall address all impacts of the Project throughout the Watershed Protection District. A. The names, addresses, including email address and fax number, organizational form, and business of the applicant and, if different, the owner of the Project. B. The names, addresses, and qualifications, including areas of expertise and experience with projects directly related or similar to the Project, of individuals responsible for constructing and operating the Project. C Authorization of the application package by the Project owner, if different than the applicant. D. Documentation of the applicant's financial and technical capability to develop and operate the Project, including a description of the applicant's experience developing and operating similar projects. E. Written qualifications of persons preparing the required reports. F. A narrative description of the Project, including but not limited to: description of the service area; estimated population to be served over what period of time; types of uses to be served, e.g. residential, commercial, agricultural, and industrial. G. Plans and specifications of the Project in sufficient detail to evaluate the application against the Permit approval standards in Chapter 21.06 of these Regulations. H. Vicinity map showing location of the Project on USGS quadrangle map. I. List of property owners within five hundred (500) feet of the Project and their mailing addresses. J. A description of the technical and financial feasibility of the Project that includes: 1. The estimated construction costs and period of construction for each phase of the Project. 2. Estimated cost of proposed mitigation measures and permit conditions. 3. Revenues and operating expenses for the Project. 4. The amount of any proposed debt and the method and estimated cost of debt service. 5. Details of any contract or agreement for revenues or services in connection with the Project. 6. Description of the number and location of persons or entity(ies) who will pay for or use the Project and/or services produced by the development and those who will benefit from any and all revenues generated by it. K. A description of the property rights, permits and approvals that includes: 1. Federal, state, and local permits or approvals that have been or will be required for the Project, together with any proposal for coordinating these permits or approvals with the Town's permitting process, and copies of any permits and approvals upon issuance. 2. Copies of any draft or final environmental assessments or impact statements prepared for the Project. 3. Description and documentation of property rights, easements, and rights-of-way agreements that are necessary for or that will be affected by the Project. L. Description of the water to be used by the Project, including: the source, amount and quality of water; the applicant's right to use the water, including adjudicated decrees and applications for decrees; proposed points of diversion and changes in the points of diversion; the existing uses of the water; and alternative water sources available to the applicant. If an augmentation plan for the Project has been decreed or an application for such plan has been filed in court, the applicant shall submit a copy of that plan. M. Air quality impact assessment and mitigation plan that includes: 1. Description of the airsheds to be affected by the Project, including the seasonal pattern of air circulation and microclimates. 2. Description of the ambient air quality and state air quality standards of the airsheds to be affected by the Project, including particulate matter and aerosols, oxides, hydrocarbons, oxidants, and other chemicals, temperature effects, and atmospheric interactions. 3. Assessment of adverse impacts of the Project to air quality during both construction and operation of the Project, and under both average and worst-case conditions. 4. A plan for mitigating adverse impacts to air quality. N. Floodplain, wetlands, and riparian areas impact assessment and mitigation plan that includes: 1. Existing conditions for floodplain, wetlands, and riparian areas affected by the Project, including: a. Structure and function of floodplain, wetlands, and riparian areas. b. Filtering and pollutant uptake capacities of wetlands and riparian areas. c. Aerial extent of floodplain, wetlands, and riparian areas. d. Wetlands species' composition and diversity. e. Transition from wetland to upland species. f. Aerial extent, function, and channel connectivity of floodplains. g. Alteration in hydrology that would allow succession to upland species. 2. Assessment of adverse impacts of the Project to floodplain, wetlands, and riparian areas. 3. A plan for mitigating adverse impacts to the floodplain, wetlands, and riparian areas. 4. A floodplain permit may be required under CRMC Title 18. O. Aquatic life and habitat impact assessment and mitigation plan that includes: 1. Existing conditions for aquatic life and habitat in streams affected by the Project, including a description of: a. Species composition and density. b. Threatened or endangered species. c. Aquatic food web. d. Habitat including riparian vegetation, stream bed and banks, spawning grounds, riffle and pool areas, off-channel habitat, flushing flows, nutrient accumulation and cycling, water temperature, depth and circulation, stratification, and any other conditions necessary for the protection and propagation of aquatic species. 2. Assessment of adverse impacts of the Project to aquatic life and habitat. The impact assessment should address: a. Species composition and density. b. Threatened or endangered species. c. Aquatic food web. d. Habitat including riparian vegetation, stream bed and banks, spawning grounds, riffle and pool areas, off-channel habitat, flushing flows, nutrient accumulation and cycling, water temperature, depth and circulation, stratification, and any other conditions necessary for the protection and propagation of aquatic species. 3. A plan for mitigating adverse impacts to aquatic life and habitat. P. Soils, geologic and natural hazards impact assessment and mitigation plan that includes: 1. Description of existing soils, geological characteristics, and hazardous conditions in the area affected by the Project, prepared by a registered engineer or geologist, including: a. Geotechnical assessment of all geologic hazards that have the potential to affect the Project and which may be de-stabilized or exacerbated by construction and operation of the Project. b. Description of soil types, drainage areas, floodplains, slopes, avalanche areas, debris fans, mud flows, rock slide areas, faults and fissures, seismic history, and wildfire hazard areas. 2. Assessment of adverse impacts of the Project to geologic and natural hazards and risks to the Project from geologic and natural hazards. 3. A plan for mitigating risks to the Project from geologic and natural hazards and mitigating adverse impacts of the Project on geologic and natural hazards. Q. Grading, erosion, and sediment control plan that includes: 1. Existing (dashed lines) and proposed (solid lines) contours at two-foot intervals or other contour intervals approved by staff. 2. Narrative description and scaled drawings of specific erosion and sediment control measures, including approximate locations of drainage facilities and drainage patterns in the areas affected by the Project; and wetlands or other water bodies receiving storm runoff from the site. Typical erosion control measures should be depicted using standard map symbols. 3. Construction schedule, indicating the anticipated starting and completion time periods of the site grading and/or construction phases including the installation and removal of erosion and sediment control measures, and the estimated duration of exposure of each area prior to the completion of temporary erosion and sediment control measures. 4. Estimated total cost of the required temporary soil erosion and sediment control measures, to determine performance guarantees for the proposed plan. 5. Calculations made for determining rainfall runoff and sizing of any sediment basins, diversions, conveyance, or detention/ retention facilities. 6. The applicant shall refer to Section 17.10.080, Stormwater to develop the grading plan. R. Hazardous materials management plan that includes: 1. Description of all hazardous, toxic, and explosive substances to be used, stored, transported, disturbed, or produced in connection with construction and operation of the Project, including the type and amount of such substances, their location, and the practices and procedures to be implemented to avoid accidental release and exposure. 2. Measures, procedures and protocols for spill prevention, storage, and containment. 3. Measures, procedures and protocols for reporting spills and storage to the Town, county, state, and federal officials. 4. Measures, procedures, and protocols for clean-up and contingency and description of the financial security for these provisions. Impacts resulting from spills and releases shall be investigated and cleaned up as soon as practicable. a. Town, or its designee, may undertake prevention, control, countermeasure, containment, and clean-up measures if the Applicant fails to comply with its obligations under the Hazardous Materials Management Plan. b. Applicant will pay all costs incurred by the Town for any such measures. S. Emergency preparedness and response plan that addresses events such as: explosions, fires, toxic emissions, transportation of hazardous material, and vehicle accidents or spills. The plan shall include proof of adequate personnel, supplies, and funding to immediately implement the emergency response during both construction and operation of the Project. T. Assessment of whether the Project is necessary to meet projected community development and population demands in the area to be served by the Project, including: 1. Description of the demands the Project expects to meet and the basis for projections of that demand. 2. Map(s) of the regional impact area and the area within the Town showing planned, proposed, or expected land use at each year of population projection, with and without the impacts of the Project. U. Town services impact assessment and mitigation plan that includes: 1. Assessment of existing capacity of and demand for Town services, including: roads, schools, water and wastewater treatment, water supply, emergency services, transportation, infrastructure, and other services necessary to accommodate the Project. 2. Assessment of adverse impacts of the Project to the capability of the Town to provide services or on the capacity of Town service delivery systems. 3. A plan for mitigating adverse impacts to Town services. V. Economic impact assessment and mitigation plan that includes: 1. Description of the Town economy, including revenues generated by the different economic sectors and the value or productivity of different lands. 2. Assessment of adverse impacts of the Project on the Town economy and opportunities for economic diversification. The impact assessment shall include: a. Changes to projected revenues generated from each economic sector. b. Changes in the value or productivity of any lands. c. Changes in opportunities for economic diversification. 3. A plan for mitigating adverse impacts to the Town economy. W. Tax burden impact assessment and mitigation plan that includes: 1. Description of the existing tax burden and fee structure for Town services, including assessed valuation, mill levy, rates for water and wastewater treatment, and costs of water supply. 2. Assessment of adverse impacts of the Project on the tax burden of residents. The impact assessment shall include: 3. A plan for mitigating adverse impacts to the tax burden on Town residents. X. Areas of paleontological, historic, or archaeological importance impact assessment and mitigation plan that includes: 1. A map and/or description of all sites of paleontological, historic, or archaeological importance affected by the Project. 2. Assessment of adverse impacts of the Project on sites of paleontological, historic, or archaeological importance. 3. A plan for mitigating adverse impacts to sites of paleontological, historic, or archaeological importance. Y. Traffic impact assessment and mitigation plan that includes: 1. A map(s) and description of existing land use in the area affected by the Project in relationship to the existing circulation system. 2. Existing and proposed traffic volume impacts to the adjacent road system, including local roads. 3. Existing and future Level of Service (LOS) and capacity of the transportation facilities before and after the Project is completed. 4. All transportation access information as required by the CDOT State Highway Access Code. 5. Assessment of adverse impacts to traffic conditions associated with the Project. 6. A plan for mitigating adverse impacts to traffic conditions associated with the Project. Z. Construction traffic route plan that includes: 1. Map indicating proposed trip routes for all traffic serving the Project. 2. Routes designed to avoid to the greatest extent possible residential areas, commercial areas, environmentally and visually sensitive areas, schools and other civic buildings, and already congested locations. 3. Limitation of traffic on public roads during seasons when heavy vehicle use, weather conditions, or water saturation may result in significant damage. 4. Restriction on weight of trucks so that they do not exceed road or bridge weight capacity established by the Town. 5. Operational measures to minimize impacts to the public such as limitations on time of day and week; vehicle fuel and emissions reduction technology; noise minimization; and traffic control safety measures. 6. Construction of the Project shall be phased to minimize interference with traffic movement. 7. For each segment of a proposed route in the Town, a description of vehicular traffic associated with the Project including vehicle types, sizes, weight, and numbers of axles; and the traffic volume, frequency (daily, weekly, total), and timing (times of day). 8. Maintenance practices on the proposed travel routes for construction traffic, including dust suppression, snow and ice management, sweeping of paved roads/shoulders, pothole patching, repaving, crack sealing, and chip sealing necessary to maintain an adequate surface of paved roads. 9. If the projected use of public roads by construction traffic will result in a need for an increase in roadway maintenance, the applicant shall enter into an agreement with the Town whereby the applicant provides for private maintenance or reimburses the Town for such increased costs and/or provides a bond or other financial assurance in an amount acceptable to the Town to cover the costs of mitigating impacts to public roads. AA. Land use impact assessment and mitigation plan that includes: 1. Description of land uses in the area affected by the Project, and a description of applicable provisions of the Town's Comprehensive Master Plan, Transportation Master Plan, and 3-Mile Plan. 2. Assessment of adverse impacts of the Project on existing and proposed land use patterns that includes: a. Compliance or consistency with the Town's Comprehensive Master Plan, potential annexation area (3-Mile Plan), and Transportation Master Plan, and other applicable land use plans and policies. b. Potential for the Project to cause or contribute to urban sprawl or "leapfrog" development. c. Increases in the amount of impervious surfaces. d. Contiguity of development associated with the Project to existing growth centers. e. Changes to unique landforms. f. Loss of open space and/or detrimental changes to the character of open space. 3. A plan for mitigating adverse impacts on land use patterns within the Town and the 3-Mile Plan area. BB. Nuisance impact assessment and mitigation plan that includes: 1. An assessment of noise, glare, dust, fumes, vibration, and odor caused by the Project. 2. A plan for mitigating adverse impacts caused by the Project to the use and enjoyment of property. CC. Revegetation and weed management plan that includes: 1. Description of the species, character, and density of existing vegetation in the area affected by the Project and summary of potential impacts to vegetation as a result of the Project. 2. Plan for re-vegetation that provides for: a. Removal of existing vegetation no more than thirty (30) days prior to commencement of initial site grading. b. Revegetation of areas that have been filled, covered, or graded as soon as practicable. c. Use of site-specific native seed mix and mulching to support vegetation growth. d. Topsoil from disturbed areas stripped and stockpiled on-site for redistribution over the completed final grade; stockpiling that conforms to best management practices and ensures that soil organisms in stockpiled soil remain viable until completion of the redistribution process. 3. A weed management plan that includes ongoing weed control at all locations disturbed by the Project.

(Ord. No. 2021-028, § 2, 10-5-2021)

Ask a question about Castle Rock law

Corpus searches the Castle Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.