For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21.06.010 — Standards for all matters of state interest

Municipal Code of the Town of Castle Rock, Colorado (Codified through Ordinance No. 2026-014, enacted May 5, 2026 (Supp. No. 63)) · Castle Rock Municipal Code § 21.06.010

Corpus is an independent public-information project, not the official City of Castle Rock website. Stable reference: corpuslaw.us/code/48c0cb9a-ae69-46e6-8ea5-3474a47be26d

21.06.010 - Standards for all matters of state interest.

The following standards will be applied by the Town to determine whether a Permit can be issued for the Project: A. The applicant has the necessary expertise and financial capability to develop and operate the Project consistent with all requirements and conditions. B. The Project is technically and financially feasible. The following criteria will be applied to determining whether this standard is satisfied: 1. Amount of debt associated with the Project. 2. Debt retirement schedule and sources of funding to retire the debt. 3. Estimated construction costs and construction schedule. 4. Estimated annual operation, maintenance, mitigation, and monitoring costs. 5. Market conditions. C. The applicant will obtain all necessary property rights, permits, and approvals for the Project prior to any site disturbance. The Town Council may, at its discretion, defer making a final decision on the application until outstanding property rights, permits, and approvals are obtained. D. The Project will not impair property rights held by others. E. Water supplies are adequate for the current and future operational needs of the Project in terms of quantity, quality, and dependability. F. The Project will not degrade air quality. G. The Project will not degrade soil and geologic conditions. H. The Project is not subject to risk from natural hazards and will not exacerbate natural hazards. I. The Project will not result in unreasonable risk of releases of hazardous materials. J. Construction and operation of the Project will ensure that, in the event of an emergency, adequate practices, procedures, and infrastructure are in place to protect public health and safety and repair damage caused by emergencies. K. The growth and development anticipated as a result of the Project can be accommodated within the financial and environmental capacity of the Town. L. The Project will not have an adverse effect on the current or future capability of the Town to provide services or on the capacity of the Town's service delivery systems. M. The Project will not create an undue tax burden on existing or future residents of the Town. N. The Project will not have an adverse effect on short- or long-term housing availability, location, condition, or cost. O. The Project will not degrade any sector of the Town economy. P. The Project will not degrade areas of paleontological, historic, or archaeological importance. Q. Traffic. 1. Construction traffic will not cause an adverse impact on local traffic in the areas affected by the Project. During construction of the Project, the level of service for each affected road segment will not be reduced over pre-project conditions. 2. The Project will be designed to minimize or mitigate impacts to physical infrastructure of the Town's transportation system; ensure public safety; and maintain quality of life for other users of the Town's transportation system, adjacent residents, and affected property owners. R. The owner will bear the cost of all road repairs and maintenance necessitated by construction of the Project. 1. If the projected use of public roads by construction traffic will result in a need for increased roadway maintenance, the owner will enter into an agreement with the Town whereby the owner assumes responsibility for the repairs and additional road and bridge maintenance or reimburses the Town for repairs and maintenance. 2. The owner will maintain financial assurance to secure the maintenance and repair obligations. The amount of such financial assurance will be determined by the Town. S. The Project will not have an adverse effect on land use patterns. T. The Project will not interfere with the use and enjoyment of property within the area affected by the Project. U. Areas disturbed by construction of the Project will be revegetated and maintained in conformance with the approved Vegetation and Weed Management Plan and will not result in intrusion of noxious weeds or other invasive species. V. The Project will comply with all plans and reports required by the Town under these Regulations.

(Ord. No. 2021-028, § 2, 10-5-2021)

Ask a question about Castle Rock law

Corpus searches the Castle Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.