§ 4.04.150 — Renewable water resource fee
Municipal Code of the Town of Castle Rock, Colorado (Codified through Ordinance No. 2026-014, enacted May 5, 2026 (Supp. No. 63)) · Castle Rock Municipal Code § 4.04.150
Corpus is an independent public-information project, not the official City of Castle Rock website. Stable reference: corpuslaw.us/code/118ef332-6cdb-49d1-b6dc-e6a2fcada48d
4.04.150 - Renewable water resource fee.
A. In order to defray the cost incurred by the Town in the acquisition and development of renewable water resources consistent with the water plan and this Chapter, there is imposed a renewable water resource fee as a condition to the right to connect to the municipal water system. The renewable water resource fee for the construction of any new commercial and industrial buildings and multifamily residential dwellings is established at the following schedule of fees in effect as of the date of a complete building permit application: Renewable Water Resource Fees - Commercial and Industrial Buildings and Multifamily Residential Dwellings Meter Size | SFE | Meter Capacity (GPM*) | 2026 and thereafter ⅗" x ¾" | .60 | 18 | $21,497 ⅝" × ¾" | .67 | 20 | $24,005 ¾" | 1.00 | 30 | $35,829 1" | 1.67 | 50 | $59,834 1.5" | 3.33 | 100 | $119,311 2" C2 | 6.67 | 200 | $238,979 2" T2 | 8.33 | 250 | $298,456 3" C2 | 16.67 | 500 | $597,269 3" T2 | 21.67 | 650 | $776,414 4" C2 | 33.33 | 1,000 | $1,194,181 4" T2 | 41.67 | 1,250 | $1,492,994 6" C2 | 66.67 | 2,000 | $2,388,719 6" T2 | 83.33 | 2,500 | $2,985,631 * Potential flow capacity in gallons per minute. B. Reserved. C. Credit against the renewable water resource fee may be granted in consideration of the dedication of tributary water on such terms and conditions acceptable to the Town Council, under Section 4.04.100. D. Payment of the renewable water resource fee shall be assessed in accordance with the schedule of rates in effect as of the date of submission of a complete building permit application. Payment of the renewable water resource fee shall be a condition to issuance of the building permit. E. Effective July 1, 2026, the renewable water resource fee for the construction of any new single-family residential dwelling (i.e., one-family and two-family dwellings as defined by Section 17.14.010) within the Town shall be imposed in accordance with the following schedule. Such fee shall be collected at the time a complete building permit application for the dwelling is submitted to the Town. For purposes of this subsection E, "gross floor area" shall mean the sum of the horizontal area of all floors of a building or structure, measured from the exterior face of exterior walls, or from the centerline of walls separating attached buildings. "Gross floor area" includes all enclosed and roofed floor space within the building, including basements, mezzanines, and interior circulation areas, but excludes parking garages and areas not enclosed by walls, including open balconies, decks, patios, and similar exterior spaces. Renewable Water Resource Fees - Single-Family Residential Dwellings Gross Floor Area in square feet | SFE | July 1, 2026, and thereafter Less than 500 | 0.27 | $ 9,654.52 500—999 | 0.33 | $ 11,799.97 1,000—1,499 | 0.39 | $ 13,945.42 1,500—1,999 | 0.42 | $ 15,018.14 2,000—2,499 | 0.65 | $ 23,385.40 2,500—2,999 | 0.81 | $ 29,178.11 3,000—3,499 | 0.82 | $ 29,392.65 3,500—3,999 | 0.83 | $ 29,607.20 4,000—4,499 | 0.85 | $ 30,465.38 4,500—4,999 | 0.87 | $ 31,323.56 5,000—5,499 | 0.93 | $ 33,254.46 5,500—5,999 | 1.00 | $ 35,829.00 6,000—6,499 | 1.05 | $ 37,545.36 6,500—6,999 | 1.06 | $ 37,974.45 7,000—7,499 | 1.11 | $ 39,690.81 7,500—7,999 | 1.15 | $ 41,192.62 8,000—8,499 | 1.20 | $ 42,908.98 8,500—8,999 | 1.24 | $ 44,410.80 9,000—9,499 | 1.29 | $ 46,127.16 9,500—9,999 | 1.34 | $ 47,843.51 Over 10,000 | 1.38 | $ 49,345.33
(Ord. No. 2026-014, §§ 1—3, 5-5-2026; Ord. No. 2025-033, § 3, 10-21-2025; Ord. No. 2024-017, § 3, 9-17-2024; Ord. No. 2024-004, § 10, 2-20-2024; Ord. No. 2023-027, § 3, 11-7-2023; Ord. No. 2022-025, § 4, 10-18-2022; Ord. No. 2021-027, § 4, 12-7-2021; Ord. No. 2020-017, § 4, 9-15-2020, Eff. 1-1-2021; Ord. No. 2019-030, § 4, 9-17-2019; Ord. No. 2018-031, § 3, 9-18-2018; Ord. No. 2017-027, § 4, 9-19-2017; Ord. No. 2016-044, § 2.M., 12-6-2016; Ord. No. 2016-030, § 5, 9-20-2016; Ord. No. 2015-46, § 4, 11-3-2015; Ord. No. 2015-05, § 5, 3-3-2015; Ord. No. 2014-31, § 4, 11-18-2014; Ord. 2013-34 § 4, 2013; Ord. 2012-30 § 4, 2012; Ord. 2011-31 § 2, 2011; Ord. 2011-21 § 6, 2011; Ord. 2009-20 § 2, 2009; Ord. 2006-20 § 1, 2006; Ord. 2006-19 § 1, 2006; Ord. 2006-12 § 2, 2006; Ord. 2005-35 § 3, 2005; Ord. 2004-58 § 1, 2004; Ord. 2002-66 § 4, 2002; Ord. 2002-11 § 2, 2002; Ord. 97-18 § 1(part), 1997; Ord. 93-5 § 2(part), 1993)
Ask a question about Castle Rock law
Corpus searches the Castle Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.
