For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12-14-206 — Floodplain Development Permit

Municipal Code, City of Centennial, Colorado (Supp. 26 Update 4: codified through Ordinance of August 18, 2026 (online updated October 28, 2026)) · Centennial Municipal Code § 12-14-206

Corpus is an independent public-information project, not the official City of Centennial website. Stable reference: corpuslaw.us/code/5deea62a-afbb-4eb5-b663-f18488bb17d9

Sec. 12-14-206. - Floodplain Development Permit.

A. Applicability. All development proposed within a floodplain and all development constructed, installed, commenced, improved or maintained within a floodplain (to the extent permitted by this LDC), is required to obtain a Floodplain Development Permit from the Floodplain Administrator in accordance with the procedures established in this Section, and the applicant for approval of such development shall pay the fee established by the City Council or SEMSWA. B. When Required. For any disturbance of the floodplain, a floodplain development permit shall be obtained from the Floodplain Administrator before start of construction or the beginning of development within any floodplain. The floodplain development permit is required prior to issuance of building permit, a street cut or right-of-way use permit, a grading permit, and any other development, use or change of the use of land located in the floodplain. The floodplain development permit is required in addition to other permits or review processes, which may be associated with an underlying zone district. All activities, regardless of impact, are required to be permitted. C. Floodplain Development Permit Requirements. Sufficient information must be provided with a floodplain development permit application to determine the impact of the proposed activities within the floodplain. At a minimum, the following will be required: 1. Floodplain Delineation and Mapping. Accurate mapping that shows all of the applicable floodplain delineations that affect the property. Base flood elevation information, if available, must be shown. Effective/existing and proposed delineations are required at a minimum. For floodplains that do not have base flood information available, the applicant may need to provide a hydraulic analysis. 2. Description and Drawings of Activities. The permit application should provide a complete description and applicable drawings of the activities that are proposed. The drawings should include an accurate representation of the location and extent of the proposed floodplain activities. Construction drawings, or other representation of the work to be completed, must be provided. 3. Engineer's Certification of No Impact. If there is no impact to the floodplain from the proposed development then the application must provide a certification by a registered Colorado Professional Engineer of no impact of the proposed activity with regard to the extents of the floodplain and the base flood elevation. 4. Floodplain Easement. Evidence that the floodplain areas of the property are contained within a floodplain easement must be provided. If the property is not within a designated floodplain easement, one may be required to be dedicated prior to final approval of the floodplain development permit. If the proposed activity modifies the existing floodplain and results in additional property being placed within the floodplain, additional easements will be required. It will be the applicant's responsibility to provide this easement, and to obtain this easement from other property owners when affected. 5. Floodplain Modification Study (when applicable). If it is determined that the proposed activities will modify and/or impact the existing SFHA a floodplain modification study certified by a registered Colorado Professional Engineer will be required prior to approval of the floodplain development permit. The scope and extent of this study will be in accordance with the mapping designation of the floodplain and determined by the Floodplain Administrator. For floodplain modifications that require FEMA approval, an approved CLOMR will be required prior to the issuance of the floodplain development permit. 6. GESC Report and Plan. For floodplain activities that involve grading or land disturbances, an approved GESC report and plan will be required prior to approval of the floodplain development permit. 7. LOMR Collateral. For projects where there is a significant floodplain modification including a LOMR, then collateral in the appropriate amount to guarantee that applicant's performance of the permit will be required. 8. Additional Information. The Floodplain Administrator may also require any additional information as specified in the SEMSWA Stormwater Management Manual. D. Standards. 1. The Floodplain Administrator shall review all floodplain development permits to determine whether they comply with the standards set out in Division 7-2, Use of Designated Open Space and Division 7-3, Floodplain management and Floodplain Damage Prevention. 2. The Floodplain Administrator shall review all floodplain development permits to determine if the proposed development impacts the floodplain. Permits shall be granted or denied based on the following criteria: a. If it is determined that there is no adverse impact and the development is not a building, then the permit shall be granted with an Engineer's Certification of No Impact from a registered Colorado Professional Engineer. b. If it is determined that there is an impact, then technical justification (i.e., a Floodplain Modification Study) for the proposed development is required following the SEMSWA Stormwater Management Manual and associated checklists. c. If the proposed development is a structure, then the provisions of Section 12-7-304, Provisions for Flood Hazard Reduction (Standards) apply. d. If a CLOMR is required, the CLOMR application must be accepted by FEMA prior to permit approval. e. If a LOMR is required to remove property from the floodplain prior to development, the LOMR must be accepted by FEMA and through the appeal period prior to permit approval. 3. At the time of issuance of building permits, the applicant shall certify that the proposed structure(s) are outside the floodplain as outlined in Section 12-7-304, Standards for Flood Hazard Reduction. 4. Building permits shall not be issued for any new structures within the boundaries of the floodplain. 5. Building permits for the renovation or substantial improvement of existing structures within the floodplain shall not be issued unless it is shown through certification (Elevation Certificate) that the structure is not in the floodway, meets freeboard criteria and the footprint within the floodplain has not increased. E. Other Permits and Approvals. All necessary state, local and federal permits shall be secured before building permits will be issued. F. Violations. Whenever a violation of these regulations has occurred, may occur, or is threatened, the Director shall be responsible for placing a temporary or permanent hold on further development orders, permits, approvals and actions (including building permits, rezoning actions, subdivision actions, grading permits, and the like) to the extent necessary to prevent or remedy the violation, and for notifying affected City departments of this action. The hold shall remain in place until the property owner complies with these Regulations.

Ask a question about Centennial law

Corpus searches the Centennial sections it holds and shows the ones that match, with their citations. Free, no sign-in.