§ 12-2-503 — Temporary Construction, Storage, and Refuse Collection Uses
Municipal Code, City of Centennial, Colorado (Supp. 26 Update 4: codified through Ordinance of August 18, 2026 (online updated October 28, 2026)) · Centennial Municipal Code § 12-2-503
Corpus is an independent public-information project, not the official City of Centennial website. Stable reference: corpuslaw.us/code/5cd5f719-bc79-4b36-9e8c-4cf7bf211194
Sec. 12-2-503. - Temporary Construction, Storage, and Refuse Collection Uses.
A. Generally. Temporary construction and storage uses include temporary asphalt or concrete plants; manufactured buildings; model homes and on-site real estate sales offices; and portable storage units. In districts where these uses are indicated as "L" or "C" in Table 12-2-306, Temporary Uses, the standards of this Section apply. B. Location and Operations. The location, hours of use, operational limitations, and duration of temporary construction and storage uses are set out in Table 12-2-503, Temporary Construction, Storage, and Refuse Collection Uses. Table 12-2-503 Temporary Construction, Storage, and Refuse Collection Uses Temporary Use | Location of Use | Hours of Use | Operational Limitations | Duration of Use Concrete, Mortar and Asphalt Batching Operations | Not less than 500 feet from any property in a residential district that is used for residential purposes | 7:00 a.m. to 7:00 p.m. if any one land use within a distance of 1,000 feet is residential; or 6:00 a.m. to 10:00 p.m. in all other locations | The facility shall be used only for a project within or immediately adjoining the City of Centennial | Established by approval to coincide with the use of the facility for a specified construction project Manufactured Buildings | On lot or parcel proposed for development, set back at least 10 feet from all property lines | On construction sites, active use shall be limited to 7:00 a.m. to 10:00 p.m.; unrestricted if located at least 300 feet from parcels or lots used for residential purposes | May be used by construction superintendent, construction workers, contractors, and other personnel on a construction team; a security office; or as temporary office. May not be used as a residence | Construction-related facilities to be removed prior to certificate of occupancy for last building; other facilities: 2 years from date of permit Temporary Construction Yard | Within ½ mile of the construction to which the construction yard relates | 7:00 a.m. to 7:00 p.m. if any one land use within a distance of 300 feet is residential; or 6:00 a.m. to 10:00 p.m. in all other locations | The facility shall be used only for a construction site in the City of Centennial or an infrastructure project that is wholly or partially located in the City of Centennial | Established by approval; to coincide with the use of the facility for a specified construction project Model Homes and On-Site Real Estate Offices | On lot or parcel proposed for development | — | Sales limited to units located on the lot or parcel proposed for development; sales offices within model homes shall meet applicable building code criteria | On-site real estate offices shall be removed upon completion of model home or suitable permanent floor area on-site; must be removed by issuance of last certificate of occupancy for development Storage Pod use on nonresidential property (for Storage Pod use on residential property, see CPMC Section 7-4-40) | On parcel or lot served by portable storage unit. No encroachment onto lawn areas or sidewalks is permitted. On nonresidential parcels, must be located behind principal building | — | — | If used for construction or renovation, may remain in place as long as a valid building permit is in place and until seven (7) days after the permit is closed. If used for other purposes, seven (7) days unless, located behind the principal building and screened from view from public right-of-way, then one (1) year. Temporary Dumpster use on nonresidential property (for Temporary Dumpster use on residential property, see CPMC Section 7-5-40) | On parcel or lot using dumpster, set back at least 5 ft. from the property line on a hard surface. In nonresidential and mixed-use districts, dumpsters shall be located behind buildings (where possible) and shall not obstruct required parking areas | — | Refuse shall be contained within the dumpster, and shall be secured if necessary to prevent it from being removed from the dumpster by wind or wildlife | If used for construction or renovation, may remain in place as long as a valid building permit is in place and until seven (7) days after the permit is closed. If used for other purposes, seven (7) days unless, located behind the principal building and screened from view from public right-of-way, then one (1) year. C. Sanitary Facilities. Restroom facilities shall be provided for operators of concrete, mortar, and asphalt batching operations and for users of manufactured buildings (except when used exclusively for storage), model homes, and on-site real estate offices. D. Additional Standards Applicable to Concrete, Mortar, and Asphalt Batching Operations. The Director of Public Works shall review all applications for concrete, mortar, and asphalt batching operations for compliance with the following standards and shall make a recommendation to the Director. Where this use is indicated as a conditional use in Table 12-2-306, Temporary Uses, the Director shall refer the Director of Public Works's recommendation to the Planning and Zoning Commission with the staff report and recommendation on the application. 1. Surety. The applicant shall provide a written agreement and advanced surety in the amount of 125 percent of the estimated site restoration cost to ensure complete site restoration upon the facility's dismantling or revocation of the permit, plus the estimated road restoration/replacement costs along anticipated principal truck routes. This amount shall be approved by the Director of Public Works or designated appointee. 2. Access. If deemed necessary by the Director of Public Works, the property access shall be controlled by special traffic markings and/or signalization at the applicant's expense. Instances warranting such traffic improvements may include locations at busy intersections or other areas where interference with primary traffic from trucks would be extensive. 3. Power and Lighting. The Director of Public Works shall approve all electric and lighting facilities. 4. Noise. Maximum noise levels shall be complied with in accordance with Article 7, Open Space, Floodplain Management, and Environmental Quality. E. Extension of Approvals. Approvals may be extended upon demonstration of good cause, appropriate maintenance, extension of any surety, and diligent pursuit of the purposes for which the temporary construction or storage uses were established. All applications for renewal of a temporary use permit issued pursuant to this Section shall be submitted to the Director at least ten working days before the expiration date of the permit.
(Ord. 2021-O-13 §11)
Ask a question about Centennial law
Corpus searches the Centennial sections it holds and shows the ones that match, with their citations. Free, no sign-in.
