Sec. 10-1303. - Standards for repairs and restoration.
(a) Permittee responsibility. The permittee shall be fully responsible for the cost and actual performance of all work in the public right-of-way. The permittee shall do all work in conformance with any and all engineering regulations, construction specifications, and design standards adopted by the city. These standards shall apply to all work in the public right-of-way unless otherwise indicated in the permit. (b) Restoration. All restoration shall result in a work site condition equal to or better than that which existed prior to construction. In addition to the regulations, specifications and standards referred to in subsection (a) of this section 10-1303, the following provisions shall apply to work in public rights-of-way. (1) Pavement cuts shall be filled with compacted select material. Either concrete or asphalt patches shall be placed to match the existing street cross section. Select material shall include select fill, stone (CDOT 26 or 57), controlled density ("flowable") fill or existing material as approved by the director. (2) Select fill shall be placed in an excavation to the density required by city compaction specifications. (3) Flowable fill backfill material, satisfying design and construction standards adopted by the city, may be used to restore trenches that have been excavated in the paved portion of any public street or alley. For trench excavations in excess of five (5) feet in depth, the permittee may use granular backfill material in lieu of flowable fill backfill material, provided that all of the following conditions are satisfied. a. Prior to the issuance of a permit, the applicant must request and receive approval for the use of granular backfill material. b. The type, gradation, placement, compaction and testing of the granular backfill material shall meet or exceed all requirements specified in design and construction standards adopted the city. (4) In cases where it is impossible to achieve the compaction required by the local design and construction standards on select fill, the city encourages the use of controlled density fill or flash fill material. When controlled-density fill-type material is used, steel plates shall be placed to cover the opening for the time required to allow the material to set. (5) Once the compacted backfill has been placed, an asphalt cutback shall be made. The cutback shall extend a minimum of six (6) inches on each side of the opening and shall be over undisturbed pavement material (a minimum of one and one-half (1½) inches deep). All edges of the opening shall be neatly cut with an asphalt saw at ninety (90) degrees to traffic and uniformly tacked. (6) The new asphalt will be placed in lifts (three (3) inches maximum) and compacted upon placement. Asphalt depths shall be governed by the existing cross section of the street, but not less than seven (7) inches of full-depth asphalt shall be used to fill a street cut regardless of the existing cross section. Concrete meeting all construction standards of the city shall be used to replace concrete pavement wherever it occurs.
Ask a question about Commerce City law
Corpus searches the Commerce City sections it holds and shows the ones that match, with their citations. Free, no sign-in.