For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-54 — Submission requirements

Revised Municipal Code of the City of Commerce City, Colorado (Codified through Ordinance No. 2732, adopted November 17, 2025. (Supp. No. 29)) · Commerce City Revised Municipal Code § 22-54

Corpus is an independent public-information project, not the official City of Commerce City website. Stable reference: corpuslaw.us/code/6c86c4ca-90ab-470b-899f-8aced971c8a7

Sec. 22-54. - Submission requirements.

In addition to the requirements set forth in Article III of this chapter, an application for a permit to locate or engage in the site selection of an arterial highway, interchange or collector highway shall include and be accompanied by the following documents and information: (a) A list of all reasonable alternative corridor locations for the project. (b) For the proposed and each alternative corridor location considered, including the no-action alternative, the information specified below: (1) A general description of the project, with a discussion of the advantages and disadvantages of the alternative. (2) A discussion of social, economic and environmental impacts whose significance is uncertain. The level of analysis should be sufficient to adequately identify the impacts and appropriate mitigation measures and address known and foreseeable public concerns. (3) A location map showing the corridor and general area. (4) Any corridor location proposal, study or other documentation that includes: a. Type, scale and appearance of the improvement; b. Cost estimate, including mitigation costs; and c. Approximate timetable for construction and right-of-way acquisition. (5) Demographic information in the impact area and within the city, including: a. Current population and density; b. Total employment, occupation types and major employer locations; c. Average family income; and d. Population projections in five-year increments over the next twenty (20) years. (6) The need for the project. (7) Major traffic generators in the impact area and the city. (8) The planned level of service in relationship to projected user demand within the city. (9) A map showing the geographic extent of the impact area, as that term is defined in section 22-6 and a description of existing land use in the impact area in relationship to the existing circulation system and the project. (10) A map of the impact area within the city showing planned, proposed or expected land use at each year of population projection provided pursuant to subparagraph (b)(4) above, with and without the project. (11) The approximate number of users of the proposed corridor or interchange location in terms of existing city residents, new city residents and non-city residents. (12) Plans for promoting the use of alternative modes of transportation. (13) Anticipated noise levels resulting from the project, including noise levels expressed through eight-hour and twenty-four-hour equivalent sound level metrics, as well as single-event noise metrics. (14) A description of noise abatement measures that are proposed for each alternative, including for each alternative the estimated construction costs and costs of operations and maintenance, decibel reduction effectiveness and height, length and material type for barriers. (15) A description of resulting net shade and shadow impacts, after mitigation measures. (16) The local air quality impacts of the project, including attainment of federal and state ambient air quality standards and risks to human health and the environment posed by air pollutants, including but not limited to nitrogen oxides (NOx), ozone, PM-10, benzene, 1, 3-butadiene and other fuel combustion by-products. (17) The impacts of the project on accessibility to and from existing public facilities, commercial and industrial facilities and residential areas within the city. (18) Any health and safety hazards, including exposure to hazardous materials and hazardous air pollutants, which may result from locating the project. (19) How the project and its impacts will conform to the Comprehensive Plan goals, objectives and policies. (20) How the project and its impacts will conform to any applicable state plans, goals, objectives and policies. (21) The development potential that would result in the impact area and within the city with and without the completion of the project measured in terms of land values, land availability, land use controls, vacancy rates, tax revenues and public expenditures, along with indices of accessibility to school/education, utility service, other public and quasi-public services, local and regional amenities and employment opportunities and the demographic indices identified in subsection (5) above. (22) The increased demand that the potential development described in subsection (21) above will place on the following public services within the city: a. Other roadways, mass transit, trails, bike paths and other transportation; and b. Housing, employment, schools, commercial services, health services, police and fire protection, solid waste disposal, water supply systems, wastewater collection and disposal systems, storm water collection and release systems, power, communications, parks, open space and recreation, other public and quasi-public utilities and other planned public services. (23) The costs and benefits to the city resulting from the land use commitment necessitated or facilitated by the project compared to alternative projected land uses in terms of land suitability, transportation, community services, utilities and revenues. (24) Alternatives that may be used by the city in planning for and controlling adjacent land use. (25) Local impacts of the project on water quality and water resources, including effects on floodplains and wetland values and functions. (26) The impact of the project on historic properties and districts or other historic resources in the city. (27) The impact, including but not limited to the impact on property values and other economic indicators, of the project on sensitive, key commercial tourist or visitor areas or districts within the city. (28) Impacts of the project on wildlife and fisheries, sensitive, endangered or threatened species and scenic parks, recreational, archeological, paleontological or other natural resources. (29) Impacts of the project on the character of adjacent or nearby neighborhoods or development, as well as the impacts of increased division or separation of neighborhoods caused by the project. (30) All feasible alternatives for mitigating adverse effects of the project described above, including but not limited to effects on the level of public services, access to public services, division of existing communities, water quality, air quality, noise levels and scenic, historic, recreational, archeological or natural resources. Mitigation alternatives to be considered include, but are not limited to: a. Alternative locations, configurations and access for the project, including but not limited to grade-separated interchanges and complete or partial construction below grade with cover and landscaping suitable for recreational use or for construction of city streets, bike paths or pedestrian walkways; b. Alternative pavement types; c. Alternative highway maintenance and snow removal methods; d. Sound walls and other sound-mitigating structures, such as transparent noise barriers; e. Berms; f. Landscaping; g. Speed limits; h. Speed control devices; i. Limits on the use of compression brakes; and j. Wildlife crossings and pedestrian bridges.

Ask a question about Commerce City law

Corpus searches the Commerce City sections it holds and shows the ones that match, with their citations. Free, no sign-in.