Sec. 26-544. - Stormwater facilities required for subdivisions.
(a) Prior to the final approval of the plat of any subdivision, or prior to commencement of construction upon any lot or parcel of land for which a drainage report and construction plan for the installation of stormwater facilities has not been prepared and approved by the City, the owners of the property being subdivided or upon which construction is being commenced shall, at such owners' cost, prepare a detailed drainage report and construction plans for the installation of all stormwater facilities required for such subdivision or lot, including any off-site facilities required to convey stormwater to existing drains, channels, streams, detention ponds or other points, all in conformity with the master plan of the stormwater basins, the Fort Collins Stormwater Criteria Manual adopted pursuant to § 26-500, and the Water Utilities Development Construction Standards adopted pursuant to § 26-29. (b) The Utilities Executive Director shall review such reports, plans and costs estimates; and after approval of the same, the plat of the subdivision or the building permit, if applicable, may be approved subject to the City's being furnished with acceptable assurance that such facilities will be constructed and installed as indicated and approved. (1) In order to obtain a certificate of occupancy for property prior to construction, certification, and acceptance of stormwater facilities, an owner may file a request with the Utilities Executive Director, along with a non-refundable administration fee of two hundred dollars ($200.00), and deposit an escrow in an amount determined by the Utilities Executive Director to be adequate to assure construction, installation, and certification of the facilities in accordance with final development plan documents. (2) All deferred construction, installation, and certification of stormwater facilities shall be completed within one hundred eighty (180) days of the date on the escrow receipt, issued at the time of its deposit with the City. (3) Escrows held by the City as assurance for deferred construction and installation of stormwater facilities shall be released upon filing by the property owner of the required lot grading or overall site drainage certification for the property prepared by a licensed engineer. Any escrow not claimed or released within the period established herein may be considered forfeited and the City may use such funds to address the drainage and grading requirements of the property.
(Code 1972, § 93-10; Ord. No. 162, 1986, § 1, 11-4-86; Ord. No. 154, 1987, § 9, 10-20-87; Ord. No. 85, 1991, § 7, 7-16-91; Ord. No. 8, 1996, § 15, 2-20-96; Ord. No. 130, 2002, § 33, 9-17-02; Ord. No. 080, 2011, § 1, 9-6-11; Ord. No. 163, 2011, § 8, 12-6-11; Ord. No. 174, 2011, § 3, 12-20-11; Ord. No. 042, 2015, § 2, 4-21-15)