§ 18-78 — Colocation of the city's fiber conduit
Municipal Code of the City of Greeley, Colorado (Codified through Ordinance No. 16, 2026, enacted April 21, 2026 (Supp. No. 6, Update 1)) · Greeley Municipal Code § 18-78
Corpus is an independent public-information project, not the official City of Greeley website. Stable reference: corpuslaw.us/code/d0a2fc44-a7cc-4923-ae89-49974df3ce9f
Sec. 18-78. - Colocation of the city's fiber conduit.
(a) Intent. The intent of this section is to permit the city to colocate conduit for fiber whenever an entity is proposing construction activities that involve directional boring or open trenching within public rights-of-way. (b) Requirements. To colocate and install city-owned fiber conduit simultaneously with a permit holder's construction activity at the city's request: (1) Right-of-way permits. All permittees proposing construction activities that involve directional boring or open trenching within public rights-of-way that extend more than 500 feet in length are required to colocate and install city-owned conduit simultaneously with the permit holder's construction activity at the city's request, unless such colocation requirement is not allowed by any other state or federal law, rule, or regulation. The city may, upon initial review of the permit application, determine that the permittee's proposed construction activity does not demonstrate a need for colocation of city infrastructure. (2) Colocation of conduit. For any construction activity that requires a colocation of city conduit, the city shall, as a condition of the issuance of the permit or the continued validity of a permit, direct the permittee to install city-owned conduit with tracer wire and associated infrastructure, as identified by the city, concurrent with the installation of the permittee's infrastructure following the city's review and approval of all estimated costs associated with the colocation of the city conduit. The permittee shall install the city conduit with tracer wire adjacent to the permittee's infrastructure and within the same bore or trench alignment. The city will bear all construction installation cost associated with the colocation, including the city conduit, pull boxes, and all other materials and infrastructure to be installed, including the incremental labor and equipment cost incurred by the permittee (or its contractor or subcontractor) that are reasonably and directly attributable to the required colocation of city conduit, material and infrastructure. The city shall not pay for design or potholing cost. (3) Documentation. When a colocation of city conduit is required, the permittee may be required to submit signed as-built documentation of the city's conduit to the city if physical verification of the city conduit is not possible. (4) Fees. The city designated representative may incrementally waive rights-of-way permit fees set forth for any construction activities associated with the colocation project.
(Code 1994, § 14.80.040; Ord. No. 9, 2019, att., § 14.80.040, 3-5-2019)
Ask a question about Greeley law
Corpus searches the Greeley sections it holds and shows the ones that match, with their citations. Free, no sign-in.
