Sec. 24-203. - Major subdivision.

a. Applicability. Major subdivisions apply to all land divisions or other alterations of legal boundaries of lots or tracts that are ineligible for minor subdivision processes in section 24-202. Major subdivision applications may be initiated by the property owner. Major subdivisions require comprehensive review through separate preliminary and final plat procedures, due to the complexity of coordinating planning, design and engineering requirements. In accordance with section 24-201.b, the director may determine at a pre-application conference that a preliminary and final plat may be submitted concurrently, where the application is small or routine. b. Preliminary plat. The preliminary plat provides detailed planning review of development patterns, street networks, block and lot layout, and the ability to meet public facility and utility requirements for future development, prior to preparation of detailed construction and engineering plans. A preliminary plat shall be processed according to the following specific procedures: 1. Review criteria. A preliminary plat shall be reviewed according to the following criteria: (a) The application is in accordance with the comprehensive plan, or any other specific plan created under that plan, and in particular, the physical development patterns and design concepts of the plan. (b) The development and infrastructure is arranged in a manner to minimize impacts on geologic hazards, environmentally sensitive areas, wildlife habitat, or other natural features of the land. (c) The arrangement and proposed design of streets, blocks, and open spaces meet the development and design standards of the subdivision regulations, and are coordinated with existing or potential development on adjacent property. (d) The proposed blocks and lots are capable of meeting all development and site design standards under the applicable zoning district. (e) The application demonstrates a preliminary likelihood of being able to meet the design, construction, performance, and maintenance requirements for all required improvements. (f) Any phasing is clearly indicated and demonstrates a logical and coordinated approach to development, and the timing, location, and construction of amenities is consistent throughout phases. (g) Any impacts identified by specific studies or technical reports, including a review of stormwater, are mitigated with generally accepted and sound planning, engineering, and urban design solutions that reflect long-term solutions and sound fiscal investments. (h) The design does not impede the construction of anticipated or planned future public infrastructure within the area, or deter future development on adjacent property from meeting the goals and policies of the comprehensive plan. (i) The recommendations of professional staff or any other referral agencies authorized to review the subdivision plan. 2. Review procedure. In addition to the general requirements in table 24-2-1 and section 24-201, the requirements in this subsection apply to preliminary plat applications: (a) At the pre-application meeting, and based on the size, scope and impact of any future development anticipated or pending with the request, the director shall determine how to coordinate the notice of meetings or hearings necessary for the formal review. (b) Any application that is particularly complex or involves significant planning and design issues, may be coordinated with a rezoning in section 24-204 or a planned unit development in section 24-205, prior to official submittal of a preliminary plat. (c) After review by staff, receipt of any comments from referral agencies, and any necessary resubmittal, the director shall schedule review by the planning commission. (d) The planning commission shall hold a public hearing and make a decision on the preliminary plat. Provided no substantial changes are made in association with a subsequent final plat, a final plat may be administratively approved by staff and public improvements accepted by city council according to subsection 24-203.c.2. 3. Effect of decision. The approval of the preliminary plat does not constitute an acceptance of the subdivision but authorizes preparation of the final plat. Denial of a preliminary plat may be appealed to the city council. 4. Term of expiration. The approval of the preliminary plat shall be effective for three years, except that any complete submittal of final plat for any phases indicated on a preliminary plat shall stall the three-year period, and approval of the final plat shall extend the expiration deadline for one year for the remaining portions of the preliminary plat. The director may grant up to two extensions of this period for up to six months each, if the applicant demonstrates substantial progress towards the design and engineering requirements necessary to submit a final plat. Any such extension shall be requested by the applicant in writing prior to the expiration of the preliminary plat. c. Final plat. A final plat requires review and refinement of the preliminary plat, review and coordination of construction documents, and review and dedication of easements, rights-of-way and public lands prior to recording subdivisions and authorizing the sale of lots to different owners. After approval of the preliminary plat, the applicant may submit a final plat for all or for portions of the preliminary plat area subject to a phasing plan approved with the preliminary plat. A final plat shall be processed according to the following specific procedures: 1. Review criteria. A final plat shall be reviewed according to the following criteria, as well as all criteria applicable to the preliminary plat review: (a) The layout and design of the final plat is consistent with the approved preliminary plat considering the number and size of lots and outlots; the block layout, street designs and access; the open space systems and civic design elements; the infrastructure systems; or other elements of coordinated developments. Deviations that result from further detail in planning, design, and engineering, and that meet the standards of this code, are generally considered "consistent" with the subdivision plan. (b) The construction plans for any utilities, infrastructure or public facilities meet all technical specifications. (c) All required improvements, dedications, fees, financial guarantees, and maintenance guarantees are provided. (d) The phasing and timing of public improvements ensures construction and performance guarantees. Any phasing that meets an approved preliminary plat is presumed acceptable. Any deviations of the final plats from an approved phasing plan may be approved provided it does not alter the timing or coordination of required improvements or amenities for the proposed final plat or any previous approved final plats. (e) The recommendations of professional staff or any other public entity authorized to review the final plat. (f) Deviations in the final plat from the approved preliminary plat may be approved if: (1) Any aspect of the project different from the approved preliminary plat complies with all applicable zoning standards, subdivision design standards, and meets the intent and design objectives of those standards; (2) The change does not increase the impact of any development on required improvements beyond the capacity for required improvements established in the preliminary plat; (3) The change does not violate any condition of the planning commission associated with the approval of the preliminary plat or any general development plan applicable to the property; (4) If technical studies were required with the preliminary plat, the author of the study shall submit an amendment noting that the change does not impact any findings of the study; and (5) The change is generally consistent with development concepts in the preliminary plat in terms of land uses, scale and intensity of development, and in no case changes the number of lots, dwelling units, or buildings, or sizes of blocks and open spaces by more than ten percent. 2. Review procedure. In addition to the general requirements in table 24-2-1 and section 24-201, the requirements in this section apply to final plat applications: (a) The applicant shall identify all improvements to be constructed, either according to the required improvements listed this code or by a specific agreement for the project. The applicant shall submit final plans and specifications for these improvements, and ensure construction of these improvements of financial guarantees as provided in section 24-304. (b) The staff shall review the final plat for conformance with the planning and design elements, and the engineering specifications for required improvements, and a final plat meeting these criteria shall be approved. (c) A final plat not meeting the review criteria may require reprocessing as a revised preliminary plat. (d) The director shall make the final decision on final plats. (e) Any final plat approved by the director and which includes dedication of rights-of-way, public lands or other public improvements, shall be placed on the consent agenda for the city council to accept the dedication. 3. Effect of decision. (a) Subdivision improvement agreement. The applicant shall enter into a subdivision improvement agreement with the city for any required improvements, which shall be recorded with or prior to recording of the final plat. The director may waive the need for a subdivision improvement agreement where there are no required improvements or for routine applications, where the requirements of the code are sufficient to address construction of improvements. At a minimum, the agreement shall indicate the following: (1) Acknowledgement of all required improvements per section 24-304, and any specific deviations or additions from this section. (2) A refined timeline coordinating construction drawings, permits, construction, inspections and final acceptance. (3) Specifics on performance and maintenance guarantees, and any particular consequences or contingencies if there is a default. (4) Any additional improvements made necessary by technical studies required by section 24-201.j or adequate public facilities analysis in section 24-305. (5) A provision binding any future landowners to the agreement. (6) Any other requirements prior to building permits or certificates of occupancy. (b) Recording. The director shall record the final plat with the county clerk and recorder within 60 days. The director may grant an extension of this period for up to 90 days in order to complete any agreement, or otherwise address the timing and implementation of improvements. Any final plat not recorded within this time shall expire. (c) Vested rights. A recorded final plat shall create a vested property right for three years, or for any other time specifically identified in a subdivision improvement agreement. If improvements or other obligations are not completed within this time, or the applicant or future landowners otherwise default on the subdivision improvement agreement, the final plat shall expire and a new plat shall be required prior to any development.

(Ord. No. 34, 2021, § 3(app. A, § 3), 9-21-2021; Ord. No. 7, 2023, app. A(24-203), 2-21-2023)