§ 24-804 — Plant specifications
Municipal Code of the City of Greeley, Colorado (Codified through Ordinance No. 16, 2026, enacted April 21, 2026 (Supp. No. 6, Update 1)) · Greeley Municipal Code § 24-804
Corpus is an independent public-information project, not the official City of Greeley website. Stable reference: corpuslaw.us/code/8db0a627-419c-4cd1-86e6-70c39540cefc
Sec. 24-804. - Plant specifications.
a. Design objectives. The plant specifications have the following design objectives: 1. Ensure the longevity and survival of landscape investments with proper species, location, installation, and maintenance of plants. 2. Promote regionally appropriate strategies, including limiting the risk of disease or infestation through diversity of urban forest materials on an area- or city-wide basis. 3. Establish minimum standards that balance immediate conditions with reasonable long-term growth and performance of landscape plans. 4. Require water-efficient strategies in terms of the water needs of landscape plans, and the continued operations and maintenance of sites. b. Species. All trees and shrubs shall be selected and planted according to Greeley's official landscape manual. In addition to any species on these lists, alternatives may be proposed and approved as part of the site plan provided they: 1. Are documented by a landscape architect or other credible information comparable in type and performance to any species on this list; 2. Are adaptable to the climate of the front range region and the specific conditions in which they are proposed; and 3. Are not invasive or otherwise problematic to the overall health of the landscape. c. Plant specifications. All landscape materials shall be healthy at the time of planting and be selected for their native characteristic or survival in the climate for the front range region. Species, specifications installation, and maintenance shall otherwise be according to American National Standards Institute (ANSI) standards. Plants shall meet the following specifications at planting: Table 24-8-4: Plant Specifications Type | Specification Tree (large, shade) | 2" DBH; mature height of 30'+ Ornamental tree | 1.5" DBH; 8' to 10' minimum planting height for multi-stemmed; mature height 15'—25' Evergreen tree | 6' minimum planting height; mature height of 10'+; evergreens with mature heights of 20' or more may be classified as large trees. Shrub | Volume #5 (ANSI Standards) Perennials | Volume #1 (ANSI Standards); Volume #2 (ANSI Standards) if substitution for shrubs Ground cover | Areas designed for vegetative cover shall have 50% ground cover at the time of planting and full coverage within 2 growing seasons General | Plants used for screening and buffers shall achieve the required opacity and function in its winter seasonal conditions within 2 years following planting d. Xeric guidelines. Projects that incorporate xeric planting design in streetscapes, outlots, and common open space areas, may request a raw water reduction subject to review and approval by the water and sewer department. Landscape plans are recommended to conserve water with landscape materials and design techniques using the following xeric principles: 1. Reduce water demand by grouping plants with similar water requirements together. Water-efficient, drought-tolerant, pollinator gardens and xeric landscaping are encouraged to be planted together to promote water conservation. 2. Limit high-irrigation turf and plantings to appropriate high-use areas with high visibility and functional needs, and use water-efficient or drought-tolerant grasses. 3. Use drought-tolerant plants suitable to the region, with low watering and pruning requirements. 4. Incorporate soil amendments and use of organic mulches that reduce water loss and limit erosion. All plant areas shall install soil amendments as required by the water and sewer department's adopted criteria. 5. Install efficient automatic irrigation systems that incorporate water conservation measures, including spray heads for ground cover, drip irrigation for shrubs and trees, and high-efficiency or precision nozzles. Provide regular and attentive maintenance to ensure irrigation systems are functioning properly. 6. Alternative sources of irrigation for all landscape areas is encouraged. e. Installation and maintenance. All landscape plans shall include installation specifications, method of maintenance including a watering system and statement of maintenance methods. 1. The developer, owners' association, property owner and/or tenant, shall be responsible for maintaining all on-lot plantings, right-of-way landscaping, or other landscaping in common areas. 2. All elements of an approved landscape plan including plant materials shall be considered elements of the project in the same manner as parking, buildings or other details. 3. Prior to the installation of turf-grass and/or other plant materials in areas that have been compacted or disturbed by construction activity, such areas shall follow soil amendment procedures pursuant to title 20 of this Code and the water and sewer lawn installation specifications. 4. Installed landscape material may be inspected periodically throughout the life of a development. 5. Plant material that fails to grow within a three-year period from the certificate of occupancy or which exhibits evidence of insect pests, disease, and/or damage shall be appropriately treated, and any plant in danger of dying is considered a violation of the site plan approval. The director may order that the plants be removed and replaced, or otherwise enforce this as a violation of this code. _____ f. Berms. Where earthen berms are used as part of the buffer or screen requirements, they shall meet the following specifications: 1. Berms shall have a slope not exceeding a horizontal to vertical ratio of no less than 3:1 ratio to no greater than a 4:1 ratio for turf-grass mowing, and must have a crown width of at least two feet. 2. All berms, regardless of size, shall be stabilized with grasses, especially at the crown. 3. Berms proposed to be placed along street rights-of-way shall be designed and constructed to provide adequate sight distances at intersections and shall not impair the safe operation of vehicles. [image omitted; see the official code] Figure 24-8-11: Earthen berms. g. Stormwater treatment. Landscape amenities that incorporate stormwater treatment are recommended. Techniques such as bioswales, water quality ponds, and rain gardens should be used to infiltrate runoff from parking lots, streets, civic spaces, and other impervious surfaces. Native grass or native grass seed shall be planted in detention and retention ponds and areas not highly trafficked by pedestrian activity. Landscape areas that are part of the stormwater system shall adhere to the storm drainage design criteria and construction specifications and the Urban Design Criteria Manual. [image omitted; see the official code] Figure 24-8-12: Bio-retention facilities. h. Irrigation systems. All major and minor development shall have an automatic irrigation system for all landscape areas, meeting the requirements of the storm drainage design criteria and construction specifications, and including the following: 1. Irrigation systems for major development shall require review and approval by the water and sewer department. 2. Irrigation systems shall be designed and maintained to minimize overspray and runoff onto adjacent impervious surfaces, such as roadways, sidewalks, and parking lots. 3. Trees, shrubs, and plantings in bed areas, such as landscape islands, shall be designed to group plants with similar water requirements and be irrigated by drip, bubbler systems, low volume spray heads and/or subsurface irrigation systems. 4. A temporary irrigation system is only allowed where native grass has been installed on an undeveloped lot or part of a developed lot, an outlot, or retention or detention pond. Plants shall be established within three to four growing seasons and shall comply with the re-vegetation standards as provided in the storm drainage design criteria and construction specifications. After native grass is established, the temporary irrigation must be removed within three months after establishment is complete. 5. An irrigation audit shall be required following the installation of the irrigation system. 6. The director may waive the requirement for irrigation systems for minor development or to facilitate infill development or redevelopment of existing sites without irrigation. i. Alternative compliance. Alternative compliance to the plant specification standards in this section may be authorized according to the process and criteria in section 24-208, and the following alternative criteria: 1. Projects with vegetative water quality ponds, bioswales, or prominent native or xeric landscape designs that will lead to better water resource management and improved water quality may request equal or better alternates to the specifications in this section. 2. Projects that include plantings with demonstrated superior survival rates in the front range climate, or which have reduced maintenance may request equal or better alternates to the specifications in this section.
(Ord. No. 36, 2021, § 3(app. A, § 3), 9-21-2021; Ord. No. 7, 2023, app. A(24-804), 2-21-2023)
Ask a question about Greeley law
Corpus searches the Greeley sections it holds and shows the ones that match, with their citations. Free, no sign-in.
