5.26.020. - Plant operation standards.

A. Emissions from Concrete or Asphalt Batch Plants. 1. Emissions from a Concrete or Asphalt batch plant shall not exceed the following standards: a. Twenty percent Opacity during normal operation of the plant. For purposes of this section, "normal operation" shall mean all periods of operation other than daily initial startup of the plant or adjustment of air pollution control equipment. b. Thirty percent Opacity during periods of initial daily startup or adjustment of air pollution control equipment. c. Opacity percentages for (a) and (b) above shall be measured by a Qualified Observer using the United States Environmental Protection Agency's Method 9 for the Visual Determination of the Opacity of Emissions from Stationary Sources, 40 CFR Part 60, Appendix A-4, Method 9, as such standards may be amended. 2. Compliance with the Emission provisions of this ordinance will be determined by a Qualified Observer from or retained by the city, Jefferson County, or the State of Colorado. 3. Emissions from material handling (i.e., loading; unloading, storage, transfer or hauling) shall be controlled at all times by the periodic or routine application of water to the surface of materials unless natural moisture is sufficient to control such Emissions. B. Operations. 1. Hours of Operation. The hours of operation of any Concrete or Asphalt Plant, including all ancillary activities including, but not limited to the operation of equipment or truck engines or any plant equipment producing noise, but excepting on-site security operations, shall occur only as follows: a. October 1 to May 31 between the hours of 6:00 a.m. and 9:00 p.m., Monday through Saturday, and between 7:00 a.m. and 9:00 p.m. on Sunday. b. June 1 to September 30 between the hours of 5:00 a.m. and 9:00 p.m., Monday through Saturday, and between 7:00 a.m. and 9:00 p.m. on Sunday. c. Applications for any temporary exemption from the provisions of this section shall be made to the City Manager or designee. In approving or denying a temporary exemption, consideration shall be given to effective dates, hours of operation, type of noise, location, loudness, equipment noise characteristics and public health, safety and welfare. Any temporary exemption approved hereunder may provide for, without limitation, a public information program prior to operation under the exemption, restrictions on effective dates, hours of operation, type of noise, location, loudness and equipment type relating to that particular activity giving rise to the relief requested. The City Manager shall promptly notify the City Council of each temporary exemption approved. 2. Truck Routes. The Owner or Operator of any Concrete or Asphalt Plant shall submit to the City of Lakewood for approval a map showing pre-designated routes for all Transport Trucks traveling north, east, south and west between the plant and the nearest arterial street. The intent of this section is to control the route between the nearest arterial street and the plant, taking into consideration that the routes may be different depending on travel direction. The route maps shall restrict to the greatest extent possible the routing of Transport Trucks so as to eliminate or minimize routes that traverse residential neighborhoods, that unreasonably and adversely impact residential dwelling units, or that damage or degrade public streets from repetitive heavy weights or the spillage of materials from Transport Trucks. No plant operations shall commence until the City of Lakewood has approved the truck route map as conforming to the requirements of this section. Once the route map is approved by the City of Lakewood, all Transport Trucks shall travel the approved routes as shown on the route map unless a temporary diversion is necessary to avoid emergency or hazardous conditions along the approved route. The Owner or Operator shall promptly contact the Director in the event of any circumstance necessitating a diversion from the route map. 3. Surface Paving and Drainage. All areas of any Concrete or Asphalt Plant site on which Transport Trucks, customers, or employee-owned vehicles park, travel, maneuver, load or unload shall be paved with asphalt or concrete in accordance with City of Lakewood approved construction and pavement designs prepared by a Colorado-licensed professional engineer specializing in the geo-technical field. Such designs shall use the design parameters specified in the City Engineering Regulations, Construction Specifications and Design Standards and shall consider the anticipated traffic volume and vehicle types traversing such paved areas. a. The City Engineer is authorized to impose reasonable restrictions on the use of paved areas to ensure that any concrete or asphalt pavement remains undamaged by improper use. Such restrictions may include, but shall not be limited to, prohibiting use of specified paved areas by Transport Trucks, limiting access to specified paved areas by vehicles exceeding a specified weight, or requiring directional signage to prevent improper use of specified paved areas. b. All areas of the Concrete or Asphalt Plant shall include City of Lakewood approved engineered plans for grading, curb and gutter, pipes, swales or other similar drainage works, all designed and built in accordance with the Lakewood Engineering Regulations, Design Standards and Construction Specifications. These drainage works shall direct rainfall and other surface water to a stormwater detention/water quality control pond. Specific areas of the plant site may be exempted from this requirement by the City Engineer if the City Engineer determines it is physically infeasible to direct water from such areas to a stormwater detention/water quality control pond. 4. Tracking of Dirt, Mud, and Materials on Public Streets. Concrete and Asphalt Plants shall employ measures to limit the tracking, carrying, or depositing of aggregates, fillers, dirt, dust, mud, sludge, or other materials associated with the Concrete or Asphalt Plant upon any public street or thoroughfare. a. All Transport Trucks and equipment leaving a Concrete or Asphalt Plant shall be completely rinsed of asphalt, concrete, aggregates, fillers, dirt, dust, mud, sludge, or other Plant materials prior to leaving the site. b. All liquid residues resulting from the cleaning of Transport Trucks and equipment as required by Section 5.26.020(B)(4)(a) shall be directed to an impervious process holding basin(s) approved by the city. (i) Such process basin(s) shall be hydraulically separate from the stormwater detention/water quality control facilities which are required by Section 5.26.020(B)(3)(b) above and by other ordinances and regulations of the City of Lakewood. (ii) All liquids from such process basin(s) shall either be recycled through the plant or discharged to the sanitary sewer system. The process basin(s) shall be designed, maintained and operated to meet applicable statutory and regulatory standards for discharge from such basin(s). (iii) All residual material from process basins shall be collected and disposed of or recycled, all in accordance with applicable laws and regulations. (iv) After issuance of a license from the City of Lakewood per Section 5.26.030, records evidencing proper disposition of residue material must be maintained on-site in a place that is reasonably safe from theft or destruction and made available upon reasonable request for City of Lakewood inspection. The record retention time shall be three years for all records created after issuance of a license by the City of Lakewood. c. Notwithstanding subsections 5.26.020(B)(3)(b) and 5.26.020(B)(4)(b), the functions of a stormwater detention/water quality control pond and liquid residue process holding basin(s) may, with the approval of the City of Lakewood, be combined into a single facility where it can be demonstrated to the City of Lakewood that such a single facility will meet the discharge and water quality requirements provided for in subsections 5.26.020(B)(3)(b) and 5.26.020(B)(4)(b). 5. Sweeping of Public Roads and Plant Pavement. If, on public roadways, there are visible tracks or deposits of aggregates, fillers, dirt, dust, mud, sludge, or any other material associated with the operation of a Concrete or Asphalt Plant along the travel path of vehicles exiting the plant site, all such public road(s)) shall be swept by the Owner or Operator at least once each day of operation or more often as reasonably required by the city to remedy and remove the tracking and deposit of aggregates, fillers, dirt, dust, mud, sludge, or any other material associated with the operation of a Concrete or Asphalt Plant. The paved areas of the plant premises shall also be swept at least once each day of operation or more often as reasonably required by the City of Lakewood during plant operation hours when airborne dust from paved surfaces is crossing the property line of the plant premises. All such sweeping shall be done by a commercial grade mechanical, vacuum or regenerative air sweeper that uses water for controlling dust and is capable of removing caked-on debris from a paved surface with rotating brooms and which has an onboard storage hopper for debris that can be dumped off-site or into a truck. The Owner or Operator shall keep a daily written log of sweeping activities. The record retention time for the written log shall be one month for all sweeping records created after issuance of a license by the City of Lakewood. C. Permits Required. The Owner or Operator of any Concrete or Asphalt Plant shall obtain and shall maintain valid and current all federal, state, and local permits, authorizations, and certifications required for the operation of the Concrete or Asphalt Plant including, but not limited to Stormwater Industrial Discharge Permit(s), Process Water Industrial Permit(s), Air Permit(s) and Construction Permit(s). D. Site Plan Required. All Concrete or Asphalt Plant sites shall be improved in complete conformance with a City of Lakewood-approved Site Plan (as defined by Section 5.26.010) and meeting the requirements of this chapter, the zoning ordinance, the Lakewood Engineering Regulations, Construction Specifications and Design Standards and other applicable ordinances and regulations of the city. To obtain a license to operate a Concrete or Asphalt Plant from the City of Lakewood, the Owner or Operator shall meet all of the following requirements: 1. Obtain City of Lakewood approval of a Site Plan for the Concrete or Asphalt Plant in accordance with this chapter. 2. Construct all site improvements shown on the City of Lakewood approved Site Plan. 3. Obtain final approval by the City of Lakewood of the constructed improvements. 4. Comply with all standards of this chapter, City of Lakewood zoning, building, fire, and safety codes, and with the air quality and hazardous waste laws of, the State of Colorado and the United States.

(Ord. O-2019-24 § 4, 2019; Ord. O-2004-6 § 1, 2004).