For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.08.321 — Bypass

Code of Ordinances of the City of Longmont, Colorado (Codified through Ordinance No. O-2026-39, enacted June 23, 2026 (Supp. No. 9)) · Longmont Code of Ordinances § 14.08.321

Corpus is an independent public-information project, not the official City of Longmont website. Stable reference: corpuslaw.us/code/c6ffde81-2fac-455d-a629-8d4c64413085

Sec. 14.08.321. - Bypass.

A. Except as provided for in subsection B of this section, bypass is prohibited and the control authority may take an enforcement action against a user for an unanticipated or anticipated bypass, unless: 1. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; 2. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventative maintenance; and 3. The user submitted the notices required in subsection C of this section. B. An industrial user may allow a bypass to occur which does not cause pretreatment standards or requirements or any of the provisions or prohibitions of this Code to be violated, but only if the bypass is necessary for essential maintenance to ensure efficient operation. Such a bypass is subject to the notification requirements in subsection C of this section. C. Notification requirements. 1. If an industrial user knows in advance of the need for a bypass, it shall submit prior notice to the control authority, at least ten days before the date of the bypass. 2. An industrial user shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards to the control authority within 24 hours from the time the industrial user becomes aware of the bypass. A written submission shall also be provided within five days of the time the industrial user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate and prevent reoccurrence of the bypass. The control authority may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. The control authority may approve an anticipated bypass, after considering its adverse effects, if the control authority determines that it will meet the three conditions listed in subsection A of this section.

(Code 2009, § 14.08.321; Ord. No. O-2007-78, § 12(14.08.321))

Ask a question about Longmont law

Corpus searches the Longmont sections it holds and shows the ones that match, with their citations. Free, no sign-in.