Sec. 14.26.150. - Technical standards and specifications.
A. In determining what stormwater control measures shall be required and what technical standards shall apply to meet the requirements of this chapter, the director shall consider what measures are practicable and effective to prevent or minimize stormwater pollution, using the following standards, criteria, and requirements as a guide, in order of precedence: 1. The Urban Drainage and Flood Control District "Urban Storm Drainage Criteria Manual-Volume 3-BMP" or its successor; 2. Stormwater design standards, as described in subsection B of this section; 3. The current city design standards and construction specifications; 4. The state department of transportation stormwater quality requirements, and supporting documents; B. In support of the design for a permanent stormwater control permit, one of the following stormwater treatment design standards must be met: 1. Water quality capture volume (WQCV) standard. The control measure is designed to provide treatment or infiltration of the WQCV and both the following conditions are satisfied: a. Runoff from 100 percent of the applicable development site is captured, except the permittee may exclude up to 20 percent, not to exceed one acre, of the applicable development site area when it is not practicable to capture runoff from portions of the site that will not drain towards control measures. In addition, the permittee must also determine that the implementation of a separate control measure for that portion of the site is not practicable (e.g., driveway access that drains directly to street). b. Evaluation of the minimum drain time shall be based on the pollutant removal mechanism and functionality of the control measure implemented. Consideration of drain time shall include maintaining vegetation necessary for operation of the control measure (e.g., wetland vegetation). 2. Runoff reduction standard. The control measure is designed to infiltrate into the ground where site geology permits, evaporate, or evapotranspire a quantity of water equal to 60 percent of what the calculated WQCV would be if all impervious area for the applicable development site discharged without infiltration. This base design standard can be met through practices such as green infrastructure. The term "green infrastructure" generally refers to control measures that use vegetation, soils, and natural processes or mimic natural processes to manage stormwater. Green infrastructure can be used in place of, or in addition to, low impact development principles. 3. Alternate treatment methodologies approved by the city to be equivalent to one of the other listed standards above. C. Low impact development. An evaluation of low impact development techniques to control stormwater runoff from the site is required for all applicable development sites that install permanent stormwater control measures. Implementation of low impact development techniques is required to the maximum extent practicable.
(Ord. No. O-2020-01, § 1(14.26.150), 1-14-2020)
Ask a question about Longmont law
Corpus searches the Longmont sections it holds and shows the ones that match, with their citations. Free, no sign-in.