14.40.010 - Wireless communications facilities standards.
A. Design Criteria. Every WCF outside of the ROW shall comply with the following design criteria: 1. Architectural Compatibility. The WCF shall be architecturally compatible with the surrounding buildings and land uses in the same zone, or otherwise integrated, through location and design, to blend in with the existing characteristics of the subject property to the extent practical. Such WCF will be considered architecturally and visually compatible if they are camouflaged to disguise the WCF. 2. Color. Towers and antennas shall be of a color that generally matches the building, surroundings, or background, and minimizes their visibility, unless a different color is required by the FCC or FAA. Muted colors, earth tones and subdued colors shall be used wherever possible. 3. Lights, Signals, and Signs. No lights, signals, or signs shall be permitted on towers or other structures unless required by the FCC or the FAA. B. Tower Setbacks. Tower setbacks shall be measured from the base of the tower to the property line of the subject property. 1. Residential Zones. Towers shall be set back from all property lines a distance equal to 300 percent of tower height; provided, however, that a lesser setback may be permitted if the Director determines that: a. There are unusual geographical limitations that justify the reduced setback; b. The setback is not less than a distance equal to 100 percent of tower height; and c. The tower is camouflaged or otherwise adapted to be compatible with the surrounding area. 2. All Other Zones. In all zones that are not residential zones, towers shall comply with the minimum setback requirements of the area in which they are located, except that if property in such non-residential zone is adjacent to property in the residential zone, a tower shall be setback a distance of no less than 110 percent of the tower height from the property line abutting such residential property. C. Equipment Structures. Ground level equipment and buildings and the tower base shall be screened. The standards for equipment and buildings are as follows: 1. The maximum floor area is 350 square feet and the maximum height is 12 feet. 2. Equipment mounted on a roof shall have a finish similar to the exterior building walls. Equipment for roof mounted antenna may also be located within the building on which the antenna is mounted, subject to generally accepted engineering practices. Equipment, buildings, antennas, and related equipment shall occupy no more than 25 percent of the total roof area of a building. D. Structural Design. Towers shall be constructed to the FCC and EIA Standards, as may be amended from time to time, and all applicable construction, building, and safety codes. E. Fencing for Freestanding Communication Towers. A stucco, masonry, or stone security wall, not less than six feet in height, shall be provided around each freestanding communication tower. Alternative fencing materials may approved by the Director of Development Services if the tower is designed to accommodate co-location. Security walls or fencing shall be colored or designed to visually blend into the character of the existing environment. Access to the tower shall be through a locked gate. F. Antenna and Tower Height. 1. The applicant shall demonstrate that the antenna is the minimum height required to function satisfactorily. No antenna that is taller than the minimum height required to function shall be approved. 2. Towers shall be no taller than the maximum permitted height as set forth in Table 14.40.F, unless otherwise approved pursuant to conditional use review as set forth in the Unified Development Code. This section shall not apply to eligible facilities requests. Table 14.40.F Maximum Antenna and Tower Height WCF Category | Zones Residential Zones (ER, R1, R1e, R2, R3, R3e, and Residential PUDs) | Non-Residential (DT & B) | Mixed-Use Zones (MAC & E) | Industrial (I) | Parks & Developing Resource (PP & DR) Freestanding Communications Tower | n/a | 50 ft. | 50 ft. | 50 ft. | 50 ft. Alternative Tower Structure | 40 ft. | 45 ft. | 55 ft. | 55 ft. | 45 ft. Small Cell Wireless Facility | 35 ft. | 35 ft. | 35 ft. | 35 ft. | 35 ft. Roof-Mounted or Wall-Mounted Wireless Communications Facility | No more than 5 feet above building 1 1. For Wall-mounted WCF, refer to 14.40.I.2 3. Measurement of height. a. Towers. The height of a tower shall be measured as the vertical distance from the base of the support structure at grade to the highest point of the structure, even if said highest point is an antenna. Measurement of tower height shall include antenna, base pad, and other appurtenances, and shall be measured from the finished grade of the subject property. If the support structure is on a sloped grade, then the average between the highest and lowest grades shall be used in calculating the antenna height. b. Rooftop Facilities. The height of WCF that are mounted on a rooftop is measured from the plane of the top of the roof upon which the facility is mounted to the highest point on the WCF. c. Wall-Mounted Facilities. The height of a WCF that is mounted and supported entirely on the wall of a legally existing building is measured from the plane of the top of the roof of the building to the highest point on the WCF. G. Antenna Support Structure Safety. The applicant shall certify that the tower and all appurtenances comply with TIA-222-G or later and/or other industry standards regarding structural safety. All support structures shall be fitted with anti-climbing devices, as approved by the manufacturers. H. Site Characteristics. Site location and development shall preserve the pre-existing character of the area in which the WCF site is located as much as possible. Existing vegetation should be preserved or improved, and disturbance of the existing topography of the site should be minimized, unless such disturbance would result in less visual impact of the site on the surrounding area. The effectiveness of visual mitigation techniques shall be evaluated by the city, taking into consideration the site as built. I. Antenna Design Criteria. Antenna mounted on any tower, building, or other structure shall comply with the following requirements: 1. Wall-mounted WCF and roof-mounted WCF shall be architecturally compatible with the building and wall on which they are mounted so as to minimize any adverse visual impact and shall be constructed, painted, or fully screened to match as closely as possible the color and texture of the building and wall on which it is mounted. 2. Wall-mounted WCF shall be mounted on a wall of an existing building in a configuration as close to flush to the wall as technically possible and shall not project above the wall on which it is mounted unless for technical reasons. In no event shall an antenna project more than ten feet above the height of the building. 3. The antenna and its support structure shall be designed to withstand a wind force of 100 miles per hour without the use of supporting guy wires. 4. No antenna, antenna array, or its support structure shall be erected or maintained closer to any street than the minimum setback for the zone in which it is located. No guy or other support wires shall be used in connection with such antenna, antenna array, or its support structure except when used to anchor the antenna, antenna array, or support structure to an existing tower to which such antenna, antenna array, or support structure is attached. 5. On buildings that are 30 feet or less in height, the antenna may be mounted on the roof if: a. The city finds that it is not technically possible or aesthetically desirable to mount the antenna on a wall. b. The antenna or antennas and related base stations cover no more than an aggregate total of 25 percent of the roof area of a building. c. Roof mounted antenna and related base stations are completely screened from view by materials that are consistent and compatible with the design, color, and materials of the building. d. No portion of the antenna extends more than ten feet above the height of the existing building. J. Equipment Shelters. If an accessory equipment shelter is present, such building or structure shall blend with the surrounding buildings in architectural character and color. K. Landscaping and Screening. 1. Landscaping shall be required to screen as much of the support structure as possible. The wall surrounding the support structure and any other ground level features (such as a building), shall be designed to soften the appearance of the WCF site. The Director of Development Services may permit any combination of existing vegetation, berming, topography, walls, decorative fences or other features instead of landscaping, if they achieve the same degree of screening as the required landscaping. If an antenna is mounted flush on an existing building, and other equipment is housed inside an existing structure, landscaping shall not be required, except as otherwise required for the existing use. 2. The visual impacts of a tower shall be mitigated through landscaping or other screening materials at the base of the tower and ancillary structures. The following landscaping and buffering of towers shall be required around the perimeter of the tower and accessory structures: a. A row of evergreen trees a minimum of ten feet tall at planting and a maximum of six feet apart shall be planted around the perimeter of the fence; and b. A continuous hedge, at least 36 inches high at planting and capable of growing to at least 48 inches in height within 18 months, shall be planted in front of the tree line referenced above. 3. Landscaping shall be installed on the outside of fences. Landscaping and berming shall be equipped with automatic irrigation systems meeting the water conservation standards of the city. Existing vegetation shall be preserved to the maximum extent practicable and may be used as a substitute for or in supplement towards meeting landscaping requirements. The Director of Development Services may waive or modify landscaping requirements as appropriate to the site conditions. L. Maintenance and Inspection. 1. To ensure the structural integrity of towers, the owner of a tower shall ensure that it is maintained in compliance with standards contained in applicable city building and safety codes, regulations of the FCC, and the applicable standards for towers that are published by the IEEE-SA, as amended from time to time. If, upon inspection, the city concludes that a tower fails to comply with such codes, regulations, or standards and constitutes a danger to persons or property, then upon notice being provided to the owner of the tower, the owner shall have 30 days to bring such tower into compliance with such codes, regulations, and standards. If the owner fails to bring such tower into compliance within said 30 days, the city may remove such tower at the owner's expense, the costs of which shall constitute a lien against the property. 2. Each year after a facility becomes operational, the facility operator shall conduct a safety inspection in accordance with the IEEE-SA and FCC standards and, within 60 days of the inspection, file a report with the city building division. M. Non-Use or Abandonment. 1. In the event the use of any tower has been discontinued for a period of six months, the tower shall be deemed to be abandoned. Determination of the date of abandonment shall be made by the city, which shall have the right to request documentation or affidavits from the tower owner or operator regarding the issue of tower usage. Upon such abandonment, the owner or operator of the tower shall have an additional 60 days within which to complete one of the following: a. Reactivate the use of the tower or transfer the tower to another owner or operator who makes actual use of the tower within an additional 90 days. Only one transference of ownership is permitted in a 12-month period under these abandonment provisions. b. Dismantle and remove the tower. In such instance, if such tower is not removed within said 60 days, the city may remove such tower at the owner's expense. 2. If there are two or more users of a single tower, removal of the tower is not required unless all users cease using the tower. However, parts of the tower that are rendered unnecessary by partial abandonment shall be removed. 3. At the earlier of 60 days from the date of abandonment without reactivation or upon completion of dismantling and removal, city approval for the tower shall automatically expire. 4. If an abandonment of a tower occurs by all of the permittees or licensees and the owner of the tower, the owner of the tower shall remain primarily responsible if the tower ceases to be used for its intended purposes by either it or other permittees or licensees for the transmission or reception of personal wireless services. In the event that the tower ceases to be licensed by the FCC for the transmission of telecommunications or broadband services, the owner of the tower shall maintain the prescribed painting or illumination of such tower until it is dismantled.
(Ord. No. 6325, § 1, 8-20-2019)