§ 15.20.020 — Modifications to International Plumbing Code, 2024 Edition
Municipal Code of the City of Loveland, Colorado (Codified through Ordinance No. 6832, enacted June 2, 2026. (Supp. No. 14)) · Loveland Municipal Code § 15.20.020
Corpus is an independent public-information project, not the official City of Loveland website. Stable reference: corpuslaw.us/code/87059167-cf9c-43a2-850c-538160c84c3f
15.20.020 - Modifications to International Plumbing Code, 2024 Edition.
The International Plumbing Code, 2024 Edition, adopted in this chapter, is modified as follows: A. Section 101.1 - Title - is amended to read as follows: These regulations shall be known as the Plumbing Code of the City of Loveland, hereinafter referred to as "this code" or "plumbing code." B. Section 103 - Code Compliance Agency - is deleted in its entirety. See LMC 15.04.050. C. Section 104 - Duties and powers of the code official - is deleted in its entirety. See LMC 15.04.050. D. Section 105.5 - Permit issuance - is deleted in its entirety. See LMC 15.04.190. E. Section 106.1 - Construction documents - is amended to read as follows: Construction documents, engineering calculations, diagrams and other such data shall be submitted electronically with each application for a permit. The code official shall require construction documents, computations and specifications to be prepared and designed by a registered design professional where required by state law. Construction documents shall be drawn to scale and shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that the work conforms to the provisions of this code. Construction documents for buildings more than two (2) stories in height shall indicate where penetrations will be made for pipes, fittings and components and shall indicate the materials and methods for maintaining required structural safety, fire-resistance rating and fire blocking. F. Section 108 - Fees - is deleted in its entirety. See LMC 15.04.190. G. Section 112 - Means of appeals - is deleted in its entirety. See LMC 15.04.210. H. Section 113 - Board of appeals - is deleted in its entirety. See LMC 15.04.210. I. Section 114 - Violations - is deleted in its entirety. See LMC 15.04.230. J. Section 305.4 - Freezing - is amended to read as follows: Water, soil and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than fifty-four (54") below grade. K. Section 305.4.1 - Sewer depth - is amended to read as follows: Building sewers that connect to private sewage disposal systems shall be installed not less than twenty-four inches (24") below finished grade at the point of septic tank connection. Building sewers shall be installed not less than twenty-four inches (24") below grade. L. Section 312.6 - Water supply system test - is amended to state as follows: Upon completion of a section of or the entire water supply system, the system, or portion completed, shall be tested and proved tight under a water pressure not less than the working pressure of the system; or, by an air test of not less than fifty (50) psi (344 kPa). This pressure shall be held for not less than fifteen (15) minutes. The water utilized for tests shall be obtained from a potable source of supply. The required tests shall be performed in accordance with this section and Section 108. M. Table 403.1 - Minimum number of required plumbing fixtures - is amended by adding footnote (g): Footnote g: For business and mercantile occupancies with occupant loads of between fifteen (15) and one hundred (100), a water bottle dispenser or bottled water dispenser or similar appliance as approved by the building official shall be required. N. Section 504.6 - Requirements for discharge piping - is amended by the addition of subsections 504.6.1 and 504.6.2 as follows: Section 504.6.1 Collection of Relief Valve Discharge: A means shall be provided to capture the discharge from a relief valve and convey it to the sanitary drainage system or exterior of the structure either by gravity or a pumped discharge. Exceptions: Replacements for existing water heaters. Where a water sensing device wired to a normally closed solenoid valve installed in the water service piping is placed within the water heater drain pan. Section 504.6.2 Pumped discharge of relief valve collection Pumps used to discharge the clear water collection of relief valves shall have an operating temperature equal to or exceeding that of the relief valve discharge temperature and shall have a gpm rating equal to or greater than the discharge of the relief valve. O. Section 701.2 - Connection to sewer required - is amended by deleting the exception. P. Section 715.4 - Written instructions - is amended to state as follows: Written instructions for the operation, maintenance, safety and emergency procedures shall be provided to the building owner. Q. Section 717.4 - Permitting - is amended by to state as follows: 717.4 Permitting. Prior to permit issuance, a professional engineer shall review and evaluate the pre-installation recorded video camera survey to determine if the piping system is able to be relined in accordance with the proposed lining system manufacturer's installation requirements and applicable referenced standards. R. Section 717.7.1 - Material data report - is amended by to state as follows: 717.7.1 Material data report. The installer shall record the data as required by the relining material manufacture and applicable standards. The recorded data shall include but is not limited to the location of the project, relining material type, amount of product installed and conditions of the installation. A copy of the data report shall be provided to the professional engineer prior to final approval. S. Section 717.8 - Post-installation recorded video camera survey - is amended by to state as follows: 717.8 Post-installation recorded video camera survey. The completed relined piping system shall be inspected internally by a recorded video camera survey after the system has been flushed and flow-tested with water. The video survey shall be submitted to the professional engineer prior to finalization of the permit. The video survey/special inspection letter from the professional engineer shall be provided stating verification that no defects exist. Any defects identified shall be repaired and replaced in accordance with this code. T. Section 903.1.1 - Roof extension - is amended by inserting the number "6" in the brackets. U. Section 1002.4.1.2 - Reclaimed or gray water-supplied trap seal primer valve - is deleted in its entirety. V. Chapter 13 - Non-potable water - is deleted in its entirety. W. Chapter 14 - Subsurface Graywater Soil Absorption Systems - is deleted in its entirety. X. Appendix D - Degree day and design temperatures - is amended to add the following table: Winter Design Dry-bulb | 4 degrees F Summer Design Dry-bulb | 94 degrees F Summer Design Wet-bulb | 63 degrees F Degree Days Heating | 6,600 degrees F Degrees North Latitude | 40 degrees 24 minutes Air Freezing Index | 906
(Ord. No. 6812, § 1, 6-2-2026; Ord. No. 6589, § 1, 11-15-2022; Ord. No. 6376, § 1, 12-15-2020; Ord. 6262 § 3, 12-4-2018)