For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19.04.020 — Water rights required for development

Municipal Code of the City of Loveland, Colorado (Codified through Ordinance No. 6832, enacted June 2, 2026. (Supp. No. 14)) · Loveland Municipal Code § 19.04.020

Corpus is an independent public-information project, not the official City of Loveland website. Stable reference: corpuslaw.us/code/b6862e11-aa17-44a2-9750-40b32086f79a

19.04.020 - Water rights required for development.

A. Residential development. 1. The City shall not issue a building permit for a residential building or development that establishes new residential units until the City has received water bank credits and/or cash-in-lieu of water rights in the total amount of water rights required for such building or development, in acre-feet of water, as determined by the following table: Residential Dwelling Type | Water Meter | Indoor Water Rights | Outdoor Water Rights2 Acre-feet (AF) per building square footage (sf)1required x building square footage | Acre-feet (AF) per lot square footage (sf)3required x net lot square footage For lots of 15,000 or less square feet per lot | Acre-feet (AF) per lot square footage (sf)3required x net lot square footage For lots greater than 15,000 square feet per lot Single-Family | Without Dedicated Irrigation Meter | Separate water meter to each dwelling unit | 0.00015 AF/sf (approx. 49.1 gal/sf) | 0.000034 AF/sf (approx. 11.0 gal/sf) | 0.000035 AF/sf (approx. 11.4 gal/sf) With Irrigation Meter | 0.00015 AF/sf (approx. 49.1 gal/sf) | 0 AF/sf | 0 AF/sf Acre-feet (AF) per dwelling unit required x No. of dwelling units | Acre-feet (AF) per acre required x net lot acreage4 | Acre-feet (AF) per acre required x net lot acreage4for lots more than 15,000 square feet per lot Multi-Family | Without Dedicated Irrigation Meter | Water meter serves multiple dwelling units | 0.16 AF/unit | 1.3 AF/acre | 1.7 AF/acre With Dedicated Irrigation Meter | 0.16 AF/unit | Acre feet (AF) per acre of irrigated area 3.0 AF/acre 1 "Building square footage" refers to the total square footage, including unfinished space, of all habitable buildings on the lot (i.e. buildings that may be legally occupied, not non-habitable outbuildings like garages or sheds). 2 If a dedicated irrigation meter provides all the water for outdoor use, then the outdoor water rights requirements would not apply for the individual lots. Instead, 3.0 AF per acre of water rights as specified in Section 19.06.040 (Irrigation with treated City water) or the amount specified in an approved Hydrozone plan as authorized by Section 19.06.050 (Irrigation subject to Hydrozone water budget) would be required for the total area irrigated from the dedicated irrigation meter. 3 "Net lot square footage" refers to the total square footage of a lot from lot line to lot line recorded on the subdivision plat. 4 "Net lot acreage" refers to the total acreage of a lot from lot line to lot line recorded on the subdivision plat. Acreage may need to be calculated from square footage. 2. The applicant shall have a credit toward the requirements set forth in this Subsection A. for any water rights previously transferred to the City as part of any annexation, zoning, or previous platting. Said credit shall be eligible for use only to fulfill water rights requirements arising on the property associated with the credit or property physically contiguous with such property if part of a larger subdivision. B. Nonresidential development. 1. The City shall not issue a building permit for a nonresidential building until the City has received water bank credits and/or cash-in-lieu of water rights in the total amount of water rights required for such building or development, in acre-feet of water, as determined by the following table: Water Meter Size | Acre-feet Required ¾" | 1 1" | 4 1½" | 8 2" | 13 3" | 26 4" | 40 >4" | As determined by City Council 2. The applicant shall have a credit toward the requirements set forth above for water rights previously furnished in conjunction with annexation, zoning, or previous platting. 3. Where property has been subdivided at or after the time of the furnishing of water rights, the water rights furnished shall be prorated among the parcels of the subdivision based upon the respective land areas. Water rights furnished to fulfill the requirements of this Subsection B in connection with other water meters previously granted on the same tract or larger tract, as the case may be, shall not be prorated. 4. Whenever a nonresidential water meter is abandoned or reduced in size, a credit shall be established in the City's water bank for the difference between the required water rights for the existing water meter and the required water rights for the new water meter, if any. Said credit shall be eligible for use only to fulfill water rights requirements arising on the property served by the original water meter, unless otherwise approved by council. Any unused credit remaining after ten years from the date the credit is created shall be canceled, and the owner thereof shall have no further claim to said credit. Upon application to City Council made prior to the expiration date, City Council may, for good cause shown, extend the expiration date as it sees fit. C. Dedicated irrigation meters. Water rights requirements for dedicated irrigation meters are set forth in Chapter 19.06. D. Time of Satisfaction of Water Rights Requirements. 1. The timing of water rights payments depends on the type of dwelling unit (single-family or multi-family) and the type of payment method (water bank credit, cash-in-lieu ("CIL"), or combination thereof) selected by the applicant. The timing and options for water rights payments are dictated in the subsections below. The following table presents a summary of the options and timing associated with water rights payments for residential development. See the subsections noted for further clarification. RESIDENTIAL DEVELOPMENT WATER RIGHTS PAYMENTS Time of Dedication | > Water Rights to Be Dedicated | > Permitted Method of Dedication SINGLE FAMILY RESIDENTIAL (subsection D.2.) Prior to plat being recorded | All water rights may be dedicated for all residential units | Water Bank, CIL, or combination Prior to building permit application | Water rights for a group of lots within the development; 4 AF or more | Water Bank, CIL, or combination Prior to building permit issuance | Water rights for a building or lot within the development | CIL only MULTIFAMILY RESIDENTIAL (subsection D.3.) Prior to plat being recorded | All water rights may be dedicated for all residential units | Water Bank, CIL, or combination Prior to building permit issuance | 4 AF or more | Water Bank, CIL, or combination Prior to building permit issuance | Less than 4 AF | CIL only NONRESIDENTIAL AND MIXED-USE (subsection D.4.) After City acceptance of complete building permit application and prior to permit issuance | All invoiced water rights must be dedicated for non-residential meter | Water Bank, CIL, or combination DEDICATED IRRIGATION (including Hydrozone) (subsection D.5.) After Irrigation Meter Permit Application is completed and approved, but prior to City's activation of meter | All invoiced water rights must be dedicated for irrigation meter | Water Bank, CIL, or combination 2. Water rights for new detached single-family (NDSF), new attached single-family (NASF), duplex residential, and other residential dwelling units that do not qualify as multiplex or multifamily in the Loveland Unified Development Code. An applicant may satisfy residential water rights requirements for this type of development only at the following times: a. Residential development with final plat. i. Prior to final plat. After acceptance by the City of a complete final plat application and prior to the recording of a final plat, applicant may satisfy all water rights required for the development shown on the plat. Methods of satisfaction shall be those outlined in Section 19.04.040. ii. Prior to acceptance by the City of a building permit application for a group of lots within the development. After recording of the final plat and prior to application for building permit, applicant may satisfy the water rights requirements for a group of lots within the development, so long as the group of lots will require a cumulative value of no less than four acre-feet of water rights. Applicant must commit to the specific lots by legal description in order to satisfy the water rights requirements for such a group of lots. Methods of satisfaction shall be those outlined in Section 19.04.040. iii. Prior to issuance of a building permit for an individual building or lot within the development. After recording of the final plat and prior to the issuance of the building permit, applicant may satisfy the water rights requirements for an individual building or lot within the development by paying the current per acre-foot cash-in-lieu price outlined in Section 19.04.041. b. Residential development with site development plan. i. Prior to site development plan. After acceptance by the City of a complete site development plan application and prior to the City's approval of a site development plan, applicant may satisfy all water rights required for the development shown on the site development plan. Methods of satisfaction shall be those outlined in Section 19.04.040. ii. Prior to acceptance by the City of a building permit application for a group of buildings within the development. After approval of a site development plan and prior to application for building permit, applicant may satisfy the water rights requirements for a group of buildings within the development, so long as the group of buildings will require a cumulative value of no less than four acre-feet of water rights. Applicant must commit to the specific buildings in an approved exhibit in order to satisfy the water rights requirements for such buildings. Methods of satisfaction shall be those outlined in Section 19.04.040. iii. Prior to issuance of a building permit for an individual building or lot within the development. After approval of a site development plan and prior to the issuance of the building permit, applicant may satisfy the water rights requirements for an individual building or lot within the development by paying the current per acre-foot cash-in-lieu price outlined in Section 19.04.041. c. Residential development that does not require a final plat or site development plan. i. After Director authorization, the applicant shall satisfy the water rights requirements prior to the City's acceptance of a building permit application by paying the current per acre-foot cash-in-lieu price outlined in Section 19.04.041. 3. Water rights for new attached residential dwelling units that qualify as multiplex or multifamily in the Loveland Unified Development Code. An applicant may satisfy residential water rights requirements for this type of development only at the following times: a. Multifamily residential development with final plat. i. Prior to final plat. After acceptance by the City of a complete final plat application and prior to the recording of a final plat, applicant may satisfy all water rights required for the development shown on the plat. Methods of satisfaction shall be those outlined in Section 19.04.040. ii. Prior to issuance of building permits for a lot or group of lots within the development. After recording of the final plat and prior to issuance of the building permit, applicant may satisfy the water rights requirements for a lot or group of lots within the development, so long as the lot or group of lots will require a cumulative value of no less than four acre-feet of water rights. Applicant must commit to the specific lots by legal description in order to satisfy the water rights requirements for such a group of lots. Water rights for multiplex or multifamily developments must be satisfied prior to issuance of building permit and may not be satisfied prior to acceptance by the City of a complete application for building permit. Methods of satisfaction shall be those outlined in Section 19.04.040. iii. Prior to issuance of a building permit for an individual building or lot within the development. After recording of the final plat and prior to the issuance of the building permit, applicant may satisfy the water rights requirements for an individual building or lot within the development by paying the current per acre-foot cash-in-lieu price outlined in Section 19.04.041. b. Multifamily residential development with site development plan. i. Prior to site development plan. After acceptance by the City of a complete site development plan application and prior to the City's approval of a site development plan, applicant may satisfy all water rights required for the development shown on the site development plan. Methods of satisfaction shall be those outlined in Section 19.04.040, Satisfying water rights requirements. ii. Prior to issuance of building permits for a group of lots within the development. After approval of a site development plan and prior to issuance of the building permit, applicant may satisfy the water rights requirements for a group of lots within the development, so long as the group of lots will require a cumulative value of no less than four acre-feet of water rights. Applicant must commit to the specific lots by legal description in order to satisfy the water rights requirements for such a group of lots. Water rights for multiplex or multifamily developments must be satisfied prior to issuance of building permit and may not be satisfied prior to acceptance by the City of a complete application for building permit. Methods of satisfaction shall be those outlined in Section 19.04.040. iii. Prior to issuance of a building permit for an individual building or lot within the development. After approval of a site development plan and prior to the issuance of the building permit, applicant may satisfy the water rights requirements for an individual building or lot within the development by paying the current per acre-foot cash-in-lieu price outlined in Section 19.04.041. c. Residential development that does not require a final plat or site development plan. i. After Director authorization, the applicant shall satisfy the water rights requirements prior to the City's acceptance of a building permit application by paying the current per acre-foot cash-in-lieu price outlined in Section 19.04.041. 4. Nonresidential and mixed-use development. For the purposes of this section, "mixed-use development" shall mean those buildings containing both residential and nonresidential uses. Water rights for nonresidential and mixed-use development must be satisfied prior to issuance of building permit and may not be satisfied prior to acceptance by the City of a complete application for building permit. 5. Dedicated irrigation meter. Water rights for a dedicated irrigation meter must be satisfied prior to the City's activation of the dedicated irrigation meter and may not be satisfied until the Irrigation Meter Permit Application has been completed and approved by City staff. 6. Activating a water meter prior to satisfaction of the water rights requirements is a violation of Section 13.02.130 of this Code. E. Once an applicant has satisfied water rights for a development, lot within a development, or meter within a development by payment of cash-in-lieu of water rights or dedication of water bank credits as described by Section 19.04.040, those water rights are irrevocably dedicated to the plat, group of lots, lot, meter, or designated irrigated area for which the water rights requirements were satisfied, unless the plat associated with meter or meters for which the water rights requirements were satisfied does not receive final approval by the City and the applicant desires to withdraw the application. In such an event, the applicant may provide a request to the Director in writing that the City refund the water rights by issuance of water bank holding receipt or receipts in the amount of water rights previously satisfied by the applicant.

(Ord. No. 6789, § 1, 12-16-2025; Ord. No. 6742, § 1, 11-5-2024; Ord. No. 6636, § 63, 9-5-2023; Ord. No. 6429, § 1, 10-6-2020; Ord. No. 6324, § 2, 9-3-2019)

Ask a question about Loveland law

Corpus searches the Loveland sections it holds and shows the ones that match, with their citations. Free, no sign-in.