§ 12-6-5 — Obstructing streets; limitations
Code of Ordinances of the City of Pueblo, Colorado (Codified through Ordinance No. 11209, adopted June 25, 2026 (Supp. No. 110)) · Pueblo Code of Ordinances § 12-6-5
Corpus is an independent public-information project, not the official City of Pueblo website. Stable reference: corpuslaw.us/code/42a6cd35-4162-44b5-b6f1-f27fbcc41b3c
Sec. 12-6-5. - Obstructing streets; limitations.
(a) It shall be unlawful, without having first obtained written permission of the Director of Public Works and the Director of Transportation, to block more than that portion of the street running from the centerline to either street edge except where the excavation is, by necessity, to be in the street center, in which case one (1) lane of moving traffic shall be maintained. (b) It shall be unlawful to block more than one (1) lane of traffic in each direction within an intersection without having first obtained the written permission of the Director of Public Works and the Director of Transportation. (c) It shall be unlawful to block a driveway overnight. A permittee shall give notice to the occupant of a residence prior to blocking any driveway in a residential area. (d) Except as may be otherwise provided in Subsection (e) hereof, any person who causes to make or who makes a street or alley cut, opening or excavation shall backfill the same and replace cut or removed pavement immediately after completion of the work for which the cut, opening or excavation was made and before leaving the site of a street or alley cut, opening or excavation. (e) No longitudinal street or alley excavation shall be extended into the next succeeding street intersection or block until the excavation has been backfilled and all pavement removed in an intersection or in front of a driveway or entrance onto said street or alley shall be replaced. Notwithstanding the foregoing, all pavement removed from any longitudinal street or alley excavation shall be replaced within two (2) weeks after the excavation has been backfilled; provided, however, utility locate borings shall be repaired and replaced within seven (7) days after the date of the boring. (f) All backfilling and pavement replacement shall be done in accordance and in compliance with specifications relating to street and alley excavations adopted by resolution of the City Council.
(1957 Code, §9-130; Ord. No. 3835, 9-9-74; Ord. No. 10400, §2, 2-27-23)
Ask a question about Pueblo law
Corpus searches the Pueblo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
