For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16-11-2 — General requirements

Code of Ordinances of the City of Pueblo, Colorado (Codified through Ordinance No. 11209, adopted June 25, 2026 (Supp. No. 110)) · Pueblo Code of Ordinances § 16-11-2

Corpus is an independent public-information project, not the official City of Pueblo website. Stable reference: corpuslaw.us/code/e016efe0-2c01-4eb0-8988-4c21abb0df53

Sec. 16-11-2. - General requirements.

(a) A connection fee shall be assessed to all new connections and enlargements of existing connections, made to the City's sewer system on or after September 1, 1994. Additionally, a separate plant investment fee shall be assessed to all new connections and enlargements of existing connections made to the City's sewer system on or after January 1, 2003. The connection fee and the plant investment fee shall be paid prior to the issuance of any building permit or plumbing permit for any structure or facility which is to be served by a new or enlarged connection. (b) The amount of the connection fee and plant investment fee shall be paid in accordance with the amounts set forth in Section 16-11-3 of this Chapter. If the water service is enlarged on or after September 1, 1994, the connection fee shall be paid prior to installing the larger water meter and the amount of the fee shall be the difference between the current fee for the existing meter size connection and the current fee for the new water meter size; if the water service is enlarged on or after January 1, 2003, both the connection fee and the plant investment fee shall be paid before installation of the larger meter. (c) If a structure or property has multiple metered water taps, a connection fee and a plant investment fee shall be paid for each metered tap in accordance with Section 16-11-3 of this Chapter, except for metered taps used solely for irrigation and/or fire protection. No additional connection fee will be assessed for multiple sewer connections.

(Ord. No. 5872, 5-23-94; Ord. No. 6904 §1, 11-11-02; Ord. No. 9220 §1, 1-8-18)

Ask a question about Pueblo law

Corpus searches the Pueblo sections it holds and shows the ones that match, with their citations. Free, no sign-in.