§ 16-11.5-3 — Development policy
Code of Ordinances of the City of Pueblo, Colorado (Codified through Ordinance No. 11209, adopted June 25, 2026 (Supp. No. 110)) · Pueblo Code of Ordinances § 16-11.5-3
Corpus is an independent public-information project, not the official City of Pueblo website. Stable reference: corpuslaw.us/code/1144b4a8-8582-421e-b903-f63f5193fffb
Sec. 16-11.5-3. - Development policy.
(a) All development within the City shall be connected to the sewer collection system. (b) A developer is responsible for the cost and construction of the sewer collection system required to serve a development. The sewer collection system shall include, but is not limited to manholes, sewer mains, service lines, pumping stations, force mains and all necessary appurtenances. (c) The sewer collection system within a development shall be sized to the ultimate capacity of that portion of the sub-basin area which will discharge through the development, including the sub-basin area upstream of the development as determined by the Director of Public Works based upon present and future development within the sub-basin area. (d) If a larger sewer collection system (including pumping stations) is required to serve a sub-basin area as described in Subsections (b) and (c) above than is required to serve the development, the developer shall be responsible for construction of the larger sewer collection system. In such event, the developer may be eligible to recover a portion of the cost of the larger system under Section 16-5-5 of this Title. Cost recovery shall be based on the following: (1) Cost recovery related to oversizing the sewer collection system shall be considered only for mains twelve (12) inches or larger and shall be the difference in the cost of pipe and installation between ten (10) inches and the actual size installed. (2) Cost recovery related to oversizing a pumping system shall be based on the difference in cost between the capacity required to serve the development as described in Subsection (b) above and the capacity required to serve the sub-basin as described in Subsection (c) above, as determined from information and data submitted by the developer and approved by the Director of Public Works. (e) Developments will not be allowed to connect to sewer lines smaller than ten (10) inches, provided, however, that if adequate capacity is available, the Director of Public Works may approve connection to a sewer line smaller than ten (10) inches for a small residential development where there is no reasonable potential for the development or any future upstream development to lead to a requirement for constructing a relief sewer. (f) Developments shall discharge into the sewer collection system within the basin in which the development is located at a point or points identified in the Master Sewer Plan then in effect. A development may be allowed to discharge outside of its identified basin boundary if such development will not adversely impact the sewer collection system outside of its identified basin boundary as determined and approved by the Director of Public Works.
(Ord. 7277 §1, 2-28-05)
Ask a question about Pueblo law
Corpus searches the Pueblo sections it holds and shows the ones that match, with their citations. Free, no sign-in.