§ 17-16-234 — Review Criteria for All Applications
Code of Ordinances of the City of Pueblo, Colorado (Codified through Ordinance No. 11209, adopted June 25, 2026 (Supp. No. 110)) · Pueblo Code of Ordinances § 17-16-234
Corpus is an independent public-information project, not the official City of Pueblo website. Stable reference: corpuslaw.us/code/2f9ac378-4e8a-48b2-a7cd-7e1c38cbd777
17-16-234 - Review Criteria for All Applications
In addition to the review criteria listed at Sections 17-16-311, 17-16-411 and 17-16-511, all applications under these Regulations shall be evaluated against the following general considerations. The general considerations are in regular type and the actual criteria that the general considerations relate to are in bold type. Where terms such as "reasonable," "feasible" and "adequate" are used in the following criteria, the Permit Authority shall determine in each case what is or is not reasonable, feasible or adequate. 17-16-234.1 The health, welfare and safety of the citizens of this City will be protected and served. 17-16-234.2 The proposed activity is in general conformance with the City's Master Plan, Water Quality Management Plan, NPDES Permit, or other duly adopted plans of the City. The determination of conformance of the Project with these plans may include but is not limited to the following considerations: 17-16-234.2.1 Likelihood that the Project will/will not cause or contribute to urban sprawl or "leapfrog" development. 17-16-234.2.2 Significant changes in the amount of impervious surfaces. 17-16-234.2.3 Contiguity of development associated with the Project to existing growth centers. 17-16-234.2.4 Changes to unique land forms. 17-16-234.2.5 Changes in the amount or character of open space. 17-16-234.2.6 Changes to traffic patterns, road capacity and congestion. 17-16-234.3 The Project is financially feasible. The determination of financial feasibility of the Project may include but is not limited to the following considerations: 17-16-234.3.1 The business plan submitted by the applicant. 17-16-234.3.2 Relevant bond issue, loan and other financing approval or certifications (e.g.: approved bond issue; bond counsel opinion). 17-16-234.4 The Project is not subject to significant risk from natural hazards. The determination of risk from natural hazards to the Project may include but is not limited to the following considerations: 17-16-234.4.1 Faults and fissures. 17-16-234.4.2 Unstable slopes including landslides, rock slides and avalanche areas. 17-16-234.4.3 Expansive or evaporative soils and risk of subsidence. 17-16-234.4.4 Wildfire hazard areas. 17-16-234.4.5 Floodplains. 17-16-234.5 The Project will not have a significant adverse effect on the capability of local governments affected by the Project to provide local infrastructure and services, or exceed the capacity of service delivery systems. The determination of the effects of the Project on local government services may include but is not limited to the following considerations: 17-16-234.5.1 Current and projected capacity of roads, schools, parks, infrastructure, drainage and/or stormwater infrastructure, housing, and other services necessary to accommodate development, and the impact of the Project upon the current and projected capacity. 17-16-234.5.2 Changes caused by the Project in the cost of providing education, transportation networks, water treatment and wastewater treatment, stormwater drainage, channel stabilization, bridges, emergency services, or other governmental services or facilities. 17-16-234.5.3 Need for temporary roads to access the Project for construction and maintenance. 17-16-234.5.4 Change in demand for public transportation. 17-16-234.6 The Project will not have a significant adverse effect on the quality or quantity of recreational opportunities and experience. The determination of effects of the Project on recreational opportunities and experience may include but is not limited to the following considerations: 17-16-234.6.1 Changes to existing and projected visitor days. 17-16-234.6.2 Changes in quality and quantity of fisheries. 17-16-234.6.3 Changes in instream flows or reservoir levels. 17-16-234.6.4 Changes in access to recreational resources. 17-16-234.6.5 Changes to quality and quantity of hiking, biking, or horseback riding trails. 17-16-234.6.6 Changes to hunting experiences. 17-16-234.6.7 Changes to open space. 17-16-234.6.8 Changes to existing conservation easements. 17-16-234.6.9 Changes to regional or neighborhood parks. 17-16-234.7 The Project will not significantly degrade air quality. The determination of effects of the Project on air quality may include but is not limited to the following considerations: 17-16-234.7.1 Applicable air quality standards. 17-16-234.8 The Project will not significantly degrade existing visual quality. The determination of visual effects of the Project may include but is not limited to the following considerations: 17-16-234.8.1 Visual changes to ground cover and vegetation, waterfalls and streams, or other natural features. 17-16-234.8.2 Interference with viewsheds and scenic vistas. 17-16-234.8.3 Changes in landscape character types of unique land formations. 17-16-234.8.4 Compatibility of structure size and color with scenic vistas and view sheds. 17-16-234.8.5 Changes to open space. 17-16-234.8.6 Changes to existing conservation easements. 17-16-234.8.7 Changes to impacts to regional or neighborhood parks. 17-16-234.9 The project will not significantly degrade surface water quality. The determination of effects of the Project on surface water quality may include but is not limited to the following considerations: 17-16-234.9.1 Changes to existing water quality, including patterns of water circulation, temperature, conditions of the substrate, extent and persistence of suspended particulates and clarity, odor, color or taste of water. 17-16-234.9.2 Applicable narrative and numeric water quality standards. 17-16-234.9.3 Changes in point and nonpoint source pollution loads. 17-16-234.9.4 Increase in erosion. 17-16-234.9.5 Changes in sediment loading to waterbodies. 17-16-234.9.6 Changes in stream channel or shoreline stability. 17-16-234.9.7 Changes in stormwater runoff flows. 17-16-234.9.8 Changes in trophic status or in eutrophication rates in streams, rivers, lakes and reservoirs. 17-16-234.9.9 Changes in the capacity or functioning of streams, lakes or reservoirs. 17-16-234.9.10 Changes to the topography, natural drainage patterns, soil morphology and productivity, soil erosion potential, and floodplains. 17-16-234.9.11 Changes to stream sedimentation, geomorphology, and channel stability. 17-16-234.9.12 Changes to lake and reservoir bank stability and sedimentation, and safety of existing reservoirs. 17-16-234.9.13 Changes to nutrient loadings including phosphorus, nitrogen and chlorophyll a in streams, rivers, lakes and reservoirs. 17-16-234.10 The Project will not significantly degrade groundwater quality. The determination of effects of the Project on groundwater quality may include but is not limited to the following considerations: 17-16-234.10.1 Changes in aquifer recharge rates, groundwater levels and aquifer capacity including seepage losses through aquifer boundaries and at aquifer-stream interfaces. 17-16-234.10.2 Changes in capacity and function of wells within the impact area. 17-16-234.10.3 Changes in quality of well water within the impact area. 17-16-234.11 The Project will not significantly degrade wetlands and riparian areas, terrestrial or aquatic plant or animal life. The determination of effects of the Project on these areas shall include the considerations raised in the applicable federal and/or state permits. 17-16-234.12 The Project will not significantly deteriorate soils and geologic conditions. The determination of effects of the Project on soils and geologic conditions may include but is not limited to the following considerations: 17-16-234.12.1 Loss of topsoil due to wind or water forces 17-16-234.12.2 Changes in soil erodibility 17-16-234.12.3 Physical or chemical soil deterioration 17-16-234.12.4 Terrain deformation/ mass wasting/subsidence 17-16-234.12.5 Compacting, sealing and crusting 17-16-234.12.6 Waterlogging 17-16-234.12.7 Soil morphology and productivity 17-16-234.13 The Project will not cause a nuisance. The determination of nuisance effects of the Project may include but is not limited to the following considerations: increase in odors, dust, fumes, glare, heat, noise, vibration or artificial light. 17-16-234.14 The Project will not result in unreasonable risk of releases of hazardous materials. The determination of the risk of release of hazardous materials caused by Project may include but is not limited to the following considerations: 17-16-234.14.1 Plans for compliance with federal and state handling, storage, disposal, and transportation requirements. 17-16-234.14.2 Use of waste minimization techniques. 17-16-234.14.3 Adequacy of spill prevention and response plans. 17-16-234.15 Urban development, population densities, and site layout and design of storm water and sanitation systems shall be accomplished in a manner that will prevent the pollution of aquifer recharge areas. The determination of potential for pollution of the aquifer recharge areas by the Project may include but is not limited to the following considerations: 17-16-234.15.1 Proximity of urban development and population densities to aquifer recharge areas. 17-16-234.15.2 Proximity of stormwater and sanitation systems to aquifer recharge areas. 17-16-234.15.3 Changes in water quality in the aquifer recharge areas. 17-16-234.16 The Project shall be reasonably necessary to meet projected community development and population demands in the areas to be served by the Project, or to comply with regulatory or technological requirements. The determination of whether the Project is reasonably necessary may include but is not limited to the following considerations: 17-16-234.16.1 Relationship to reasonable growth projections and local land use plans. 17-16-234.16.2 Relationship to other providers' service areas. 17-16-234.16.3 Whether the Project is not in compliance with regulatory or technological requirements or will not be in compliance in the near future.
(Ord. No. 8691 §1, 1-13-14)
Ask a question about Pueblo law
Corpus searches the Pueblo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
