§ 17-16-504 — Applicability; Prohibitions
Code of Ordinances of the City of Pueblo, Colorado (Codified through Ordinance No. 11209, adopted June 25, 2026 (Supp. No. 110)) · Pueblo Code of Ordinances § 17-16-504
Corpus is an independent public-information project, not the official City of Pueblo website. Stable reference: corpuslaw.us/code/8f2f90ce-ad9f-4f26-a2c2-24739ea9ae12
17-16-504 - Applicability; Prohibitions
17-16-504.1 These Regulations shall apply to the site selection and construction of all major facilities of a public utility wholly or partially within the incorporated territory of the City. 17-16-504.2 No electric transmission line or pipeline shall be constructed, located, relocated, reconstructed, enlarged or upgraded prior to receiving the written approval of the Director and the City's Director of Public Works as to location and alignment, except to cross such road at or near a perpendicular angle or to provide service to an individual utility customer. 17-16-504.3 A Permit is not required under these Regulations for the following activities: repair of storm damage, reframing, pole replacement, re-conductor and maintenance in the normal course of business without increasing the voltage rating of the transmission line, or reconstructing, upgrading or replacing substation equipment inside an existing substation or within an existing substation fence. 17-16-504.4 A permit under these Regulations is required to construct, locate, relocate, reconstruct, enlarge or upgrade any electric transmission line and appurtenant facilities used to transmit electricity at 115 kilovolts or more at any location within the incorporated area of the City. 17-16-504.5 A permit under these Regulations is required to construct, locate, relocate, reconstruct, enlarge or upgrade any pipeline and appurtenant facilities of twelve (12) inches or more in diameter which creates a hoop stress of twenty (20) percent or more at their specified minimum yield strength. 17-16-504.6 These Regulations shall not apply to interstate natural gas pipeline facilities regulated preemptorily by the Federal Energy Regulatory Commission (FERC), or its successor, provided the following requirements and procedures are complied with by persons or entities proposing to site and construct the interstate natural gas pipeline facility whenever site selection and construction of such facility will be partly located within the city limits of the City. 17-16-504.7 The requirements of these Regulations shall not be deemed to waive the requirements of Section 40-5-101, et seq., C.R.S., if applicable, that a public utility obtain a certificate of public convenience and necessity.
(Ord. No. 8691 §1, 1-13-14)
Ask a question about Pueblo law
Corpus searches the Pueblo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
