Sec. 4-2-6. - Protection of the public during construction or demolition.
To fully implement Section 3303 of the International Building Code, the following additional requirements shall be applicable to all construction or demolition activities adjacent to a public way or which require or involve any temporary occupancy of public property for fences, walkways or other protective devices: (1) Prior to issuance of any building or demolition permit under the International Building Code, the applicant shall submit complete plans and specifications for the work, together with a routing form provided by the Building Official, to the Director of Public Works and to the Traffic Engineer for review. The Director and Traffic Engineer shall thereupon make a preliminary determination whether Section 3303 of the International Building Code will require protection of pedestrians or any temporary use or closure of streets, alleys or sidewalks, and shall notify the applicant and Building Official of such determination, which shall also be recorded upon the routing form. Thereafter, the Building Official shall condition the issuance of any permit upon compliance with the requirements of Section 3303 of the International Building Code and this Section. (2) In the event that Section 3303 of the International Building Code or the terms of any building or demolition permit issued under the International Building Code at any time require the erection of any temporary walkway, fence or other protective device upon any street, alley, sidewalk or other public way, the permittee shall not erect same until a separate permit therefor shall have been first applied for and obtained from the Director of Public Works, in the same manner and with the same requirements applicable thereto, as applies for street or sidewalk excavations under Chapter 6 of Title XII of this Code. (3) In the event that Section 3303 of the International Building Code, the terms of any building or demolition permit, or public safety, as determined by the Traffic Engineer, requires the temporary closure of any street, alley or sidewalk, or any portion thereof, the permittee shall first make application therefor to the Traffic Engineer and shall comply with all requirements for barricades, flagging, warning devices and detour signage reasonably required by the Traffic Engineer pursuant to Title XV of this Code and the Model Traffic Code adopted therein. (4) Nothing in Subsection (1) above shall operate, nor shall it be construed to bar, estop or otherwise limit or restrict the authority of the Director, the Traffic Engineer or the Building Official to require, at any time, walkways or other protective measures to be provided in connection with any construction or demolition, notwithstanding that the same were not made a condition of any permit at the time of permit issuance. (5) It shall be unlawful for any person to place or store any materials or equipment used in or required for construction or demolition work, or to erect any walkway, barricades, canopy, railing or fence upon any public property without having first obtained a permit in writing from the Director of Public Works. (6) No building permit shall be issued by the Building Official until there shall have been obtained such permit from the Director of Public Works.
(Ord. No. 6443, 6-28-99; Ord. No. 7112 §6, 2-23-04; Ord. No. 8157 §5, 3-22-10; Ord. No. 8885 §1, 6-22-15; Ord. No. 10466 §3, eff. 6-29-23)