For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-4-2 — Amendments to Colorado plumbing code, section 1.2 e.1.to add following:

Code of Ordinances of the City of Pueblo, Colorado (Codified through Ordinance No. 11209, adopted June 25, 2026 (Supp. No. 110)) · Pueblo Code of Ordinances § 4-4-2

Corpus is an independent public-information project, not the official City of Pueblo website. Stable reference: corpuslaw.us/code/cc60d22d-0ae4-4cb1-b473-455b22fbf85b

Sec. 4-4-2 - Amendments to Colorado plumbing code, section 1.2 e.1.to add following:

Section 103.1 Creation of Agency of the I.P.C. is amended and adopted to read as follows: 103.1 Southern Colorado Building Department - Enforcement Agency: Administration and enforcement of this code and all related and secondary codes are hereby delegated to the Southern Colorado Building Department. Wherever in this code the phrase "Building Official" appears, it shall be construed to refer to the Building Official of the Southern Colorado Building Department or the Building Official's designated representative. The Building Official, the Building Official's designated representatives, and such plumbing inspectors as the Building Official may appoint, shall be vested with the authority of a law enforcement officer with respect to enforcing this code and Chapter 4 of Title IV of the Pueblo Municipal Code, including the authority to issue summons and complaints for the violation thereof. Section 109 Fees of the I.P.C. is hereby adopted. vvv. Section 202 General Definitions of the I.P.C. is amended to revise the definition of plumbing system to provide as follows: PLUMBING SYSTEM. A system that includes the water distribution pipes; plumbing fixtures and traps; water-treating or water-using equipment; soil, waste and vent pipes; and building drains; in addition to their respective connections, devices and appurtenances within a structure or premises; and the water service, building sewer and building storm sewer serving such structure or premises. This includes all portions of private water mains, sewer mains, storm sewer and fire mains. www. Section 305.4 Freezing of the I.P.C. is amended to read as follows: 305.4 Freezing. Water, soil and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than forty-eight (48) inches below grade. xxx. Section 305.4.1 Sewer depth of the I.P.C. is amended to read as follows: 305.4.1 Sewer Depth. Building sewers that connect to private sewage disposal systems shall be installed not less than twelve (12) inches below finished grade at the point of septic tank connection. Building sewers shall be installed not less than twelve (12) inches below grade. yyy. Section 306.3 Backfilling of the I.P.C. is amended to add a subsection as follows: 306.3.1 Time to Backfill. Backfilling shall be completed within seventy-two (72) hours after approved inspection. zzz. Table 403.1 of the I.P.C. is amended to add Footnote g as follows: g. Mop sinks or service sinks shall not be installed in restrooms. aaaa. Subsection 405.3.1 of the I.P.C., entitled "Water closets, urinals, lavatories and bidets," is amended by the addition of a paragraph to read as follows: Where more than one (1) water closet or water closets and urinals are installed in a room, they shall be separated by an approved partition wall. Urinals set next to each other or another fixture shall have an approved splash guard. bbbb. Section 605.3 Water service pipe of the I.P.C. is amended by the addition of the following exception to read as follows: EXCEPTION: All new or replaced water service piping smaller than two (2) inches (51 mm) from the main to the meter shall be no lighter than Type L Copper or PEX, PE-AL-PE, and PEX-AL- PEX pipe. A blue fourteen (14)-gauge tracer wire shall be installed with all nonmetallic water services. All service piping two (2) inches (51 mm) or larger shall be Type K Copper, Class 50 or Ductile Iron, Class 150 Asbestos Cement, or PVC American Water Works Association approved pressure pipe or other approved material. Water service piping shall be installed to a minimum of forty-eight (48) inches (1219.2 mm) depth from the top of the pipe. cccc. Section 608.1 General of the I.P.C. is amended by the following addition: All new or remodeled public buildings shall have a reduced pressure-type backflow preventer installed on the water service supplying such buildings or any portion thereof. dddd. Section 701.2 Connection to Sewer Required is amended by the addition of a new Section to read as follows: 701.2.1 Connections. Taps made to existing sanitary sewers for building sewers draining into the existing sanitary sewer system of the City shall be made by an approved mechanical cutting device and an approved saddle or by removing a section of sewer pipe, and the installation of a new pipe section or sections with a wye fitting and an approved coupling to make the joint at the juncture of the new pipe with the existing system. Such work shall be done by either a Plumbing Contractor or Plumbing Utility Contractor who is licensed to do such work as provided by Title IV, Chapter 1 of the Pueblo Municipal Code. Connections to new sanitary sewers or newly repaired sanitary systems and installations of building sewers from the main sewer to the building drain shall be installed by a Plumbing Contractor or a Plumbing Utility Contractor who is licensed to do such work. When a sewer main is installed in the street or alley right-of-way, the building sewer, as defined in this code, shall be installed to the property line and properly marked with magnetic ductile tape for the full length of said sewer line. Building sewers, including each tap and wye, shall be inspected by personnel of either the Southern Colorado Building Department or the City Department of Wastewater. eeee. Section 903.1.1 Roof extension unprotected of the I.P.C. is amended to read as follows: 903.1.1 Roof extension unprotected. Open vent pipes that extend through a roof shall be terminated not less than six (6) inches above the roof. ffff. Section 904.1.1 Installation of the I.P.C. is deleted in its entirety. gggg. Section 903.2 Frost Closure of the I.P.C. is deleted in its entirety. hhhh. Section 904.1.2 Size of the I.P.C., is amended to read as follows: 904.1.2 Size. The required vent size shall not be less than the aggregate cross-sectional area of the largest required building drain. iiii. Section 918.3 Where Permitted of the I.P.C. is amended to read as follows: 918.3 Where permitted. Air Admittance Valves may be permitted for use on fixtures located on the same floor at the following locations: Islands, Peninsulas, under windows, at bearing walls and other applications where conventional venting methods are not possible due to the existing constructions and structural locations. jjjj. Chapter 12 Special Piping and Storage Systems of the I.P.C. is deleted in its entirety. kkkk. Appendix E Sizing of Water Piping System of the I.P.C. is deleted in its entirety.

(Ord. No. 8891 §2, 7-13-15; Ord. No. 9965 §2, 7-12-21; Ord. No. 10684 §2, 4-8-24; Ord. No. 11082, §3, 11-24-25)

Ask a question about Pueblo law

Corpus searches the Pueblo sections it holds and shows the ones that match, with their citations. Free, no sign-in.