§ 66-78 — Creation of an infrastructure reimbursement fee
Code of the City of Thornton, Colorado (Supp. No. 65: codified through Ordinance No. 3773, adopted June 9, 2026) · Thornton City Code § 66-78
Corpus is an independent public-information project, not the official City of Thornton website. Stable reference: corpuslaw.us/code/cfd2b7e8-2fa8-48ed-af84-4bbdf56765e1
Sec. 66-78. - Creation of an infrastructure reimbursement fee.
(a) Notice. The infrastructure department shall publish a notice of a proposed infrastructure reimbursement fee facility and specific geographic area within which the fee will apply pursuant to Section 2-1. The notice shall provide a description of the improvements the city intends to install, an estimate of the infrastructure reimbursement fee based upon the cost estimates for the facility, and the date and time that city council will consider establishing the infrastructure reimbursement fee. A notice shall also be mailed to property owners of record located within the specific geographic area. The notice shall also state that a public hearing will not be held unless requested by a property owner. Any property that benefits from the public improvement that annexes to the city after the improvement is constructed, may be charged its proportionate share through an annexation agreement. (b) Council consideration. The city council shall consider creation of an infrastructure reimbursement fee area as a regular business item unless a property owner within the specific geographic area requests a public hearing. If the city council determines to create the fee area, it shall adopt a resolution describing the general boundaries of the area that may be provided service by the facilities and the estimated costs for the infrastructure improvement. (c) Costs included in the infrastructure reimbursement fee. The actual costs of materials, labor, equipment, acquisition of rights-of-way and easements, including condemnation costs, engineering services, environmental assessment, and other costs directly related to the design and construction of the improvements shall be included in the infrastructure reimbursement fee. (1) Water distribution/transmission facilities. The city shall include in the calculation of the infrastructure reimbursement fee for water transmission or distribution facilities the actual costs for environmental assessment, engineering services, construction management, acquisition of rights-of-way, construction, easements, and condemnation costs. Section 74-100 of the City Code shall not apply regardless of line or facility sizing. The public works director shall identify a specific geographic area within which the reimbursement fee shall apply. The water distribution/transmission infrastructure reim-bursement fee shall be converted to a single-family equivalent fee for the meter sizes identified in the City of Thornton water and wastewater fees and charges ordinance. (2) Wastewater collection facilities. The city shall include in the calculation of the infrastructure reimbursement fee for wastewater collection facilities the actual costs for environmental assessment, engineering services, construction management, acquisition of rights-of-way, construction, rights-of-way, easements, and condemnation costs. Section 74-100 of the City Code shall not apply regardless of line or facility sizing. The public works director shall identify a specific geographic area within which the reimbursement fee shall apply. Specific properties within the geographic area that have been developed to their ultimate land use may be excluded from the geographic area and not be subject to the infrastructure reimbursement fee at the recommendation of the deputy city manager for infrastructure. The wastewater collection infrastructure reimbursement fee shall be converted to a single-family equivalent fee for the meter sizes identified in the City of Thornton water and wastewater fees and charges ordinance. (3) Regional thoroughfare or arterial streets. The city shall include in its calculation of the infrastructure reimbursement fee for regional thoroughfare or arterial street the actual costs for: Environmental assessment, engineering services, traffic study, construction management, acquisition and/or condemnation of rights-of-way, construction, and storm water. A traffic impact/cost allocation study shall be completed before or after construction of the infrastructure to identify the specific geographic area within which the infrastructure reimbursement fee shall apply and recommend an allocation formula or methodology. Such methodology may consider allocating the fee based upon an area or acreage basis; trip generation; allocating one-half of the cost of constructing the street improvement, curb, gutter, sidewalk, acceleration and deceleration lanes, and storm water to the property adjacent to the improvement; or any other alternate method. (4) Major storm water improvements. The city shall include in the calculation of the infrastructure reimbursement fee to major storm water improvements the actual costs for environmental assessment, engineering services, hydrologic and hydraulic studies, construction management, acquisition and/or condemnation of rights-of-way and easements, and construction. (d) Filing the infrastructure reimbursement fee. Upon completion of the construction of the infrastructure, the infrastructure department shall determine the initial fee based on actual costs and prepare a report for city council setting forth the actual infrastructure reimbursement fee for the initial year. The infrastructure reimbursement fee for water transmission/distribution or wastewater collection shall be included in the city of Thornton Water and Wastewater Fees and Charges Ordinance. The regional thoroughfare, arterial streets, or major storm water improvements infrastructure reimbursement fee shall be included in the resolution setting forth the annual fees and charges for the city. A map of the infrastructure reimbursement fee area, a general description of the infrastructure constructed, and a copy of the annual infrastructure reimbursement fee shall be filed with the finance director and the city development department. The infrastructure reimbursement fee shall be reviewed annually and may be adjusted for inflation based on the construction cost index provided in the "Engineering News Record". (e) Payment of fee. The infrastructure reimbursement fee for water transmission/distribution facilities and wastewater collection shall be paid at the same time as the water and wastewater development fees required by the City of Thornton water and wastewater fees and charges ordinance is paid. The regional thoroughfare or arterial street infrastructure reimbursement fee shall be paid no later than when the first building permit is issued in accordance with a subdivision plat subject to the fee. The infrastructure reimbursement fee for major storm water improvements shall be paid no later than when the first building permit is issued in accordance with a subdivision plat subject to the fee. (f) No service without payment of infrastructure reimbursement fee. No property shall be permitted to connect to a wastewater interceptor/collection or water transmission or distribution facility constructed pursuant to this section or receive a certificate of occupancy until any obligation for infrastructure reimbursement fees have been paid. No building permit shall be issued until the regional thoroughfare or arterial infrastructure reimbursement fee has been paid. (g) No reservation of capacity. The city shall not reserve capacity in any water transmission or distribution facilities or wastewater collection facilities for any connector unless a connector has paid the applicable fee. Prepayment of infrastructure reimbursement fees is not permitted. Available capacity shall be allocated based on a "first come, first served" basis.
(Ord. No. 2622, § 1, 7-24-00; Ord. No. 2656, § 33, 2-12-01; Ord. No. 2663, § 40, 4-23-01; Ord. No. 2786, § 4, 7-28-03; Ord. No. 3272, § 3, 10-8-13; Ord. No. 3392, § 20, 8-9-16; Ord. No. 3476, §§ 20, 7-10-18)
Ask a question about Thornton law
Corpus searches the Thornton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
