Sec. 74-100. - Sizing and layout of water lines and sewer lines.

(a) The sizing and layout of the system are part of the total consideration of design, operation and maintenance of a water supply system that yields optimum quality service at the lowest total cost to the consumer. The infrastructure department reserves the right to size mains to provide for exceptional future needs. Oversizing of mains (anything greater than 16 inches in diameter), as dictated by the city's hydraulic model, may be required by the city, and costs of such oversizing shall be borne by the city. However, if such oversizing is required to meet the needs of the developer, the full cost thereof shall be borne by the developer. If oversizing is required, the developer shall provide a minimum of three qualified bids for 16-inch-diameter lines as well as bids for the oversized line. The city infrastructure department reserves the right to require additional bids in accordance with the city's purchasing and contract policies. The city shall pay the difference between the 16-inch-diameter and oversized pipe bids once approved by the engineer and upon completion and initial acceptance of the installation. (b) The size, slope, alignment, materials for construction of all sanitary sewers, including building sewers, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the Standards and Specifications. Any deviations from the Standards and Specifications must be approved in writing by the engineer. The infrastructure department reserves the right to size mains to provide for future needs. Oversizing of mains (anything greater than 15 inches in size) may be required by the city, and costs of such oversizing shall be borne by the city; however, if such oversizing is required to meet the needs of the developer, the full cost thereof shall be borne by the developer. If oversizing is required, the developer shall provide a minimum of three qualified bids for 15-inch-diameter lines as well as bids for the oversized line. The city infrastructure department reserves the right to require additional bids in accordance with the city's purchasing and contract policies. The city shall pay the difference between 15-inch-diameter and oversize bids once approved by the engineer and upon completion and initial acceptance of the installation.

(Code 1975, § 40-16; Ord. No. 1278, 9-12-83; Ord. No. 2306, § 7, 2-28-94; Ord. No. 2656, § 43, 2-12-01; Ord. No. 2663, § 47, 4-23-01)