12.12.250 - Street excavations of one hundred feet or more.
Whenever any opening or excavation is made in any street or highway which is one hundred (100) linear feet or more, the following provisions shall be applicable: A. An applicant is defined as a contractor and/or public utility or public service company. If the work to be performed will not be conducted by an employee of the public utility, then the public utility shall provide the name of the contractor as part of the application. The permit issued shall indicate the name of the public utility, the name of the licensed contractor and the work number assigned by the call before you dig clearinghouse. All applications shall be submitted to the department of public facilities no less than five business days prior to the date that the excavation would commence. In the event of an emergency repair, i.e. valve repairs, main or cable breaks, the department of public facilities shall receive oral notification of the emergency within twenty-four (24) hours after the excavation has commenced. If the emergency occurs after five p.m. on a business day, or on a weekend or holiday, the applicant shall make oral notification on the next business day following said emergency. Any such emergency notification shall be followed by a written application which includes a detailed explanation of the emergency and the work performed, no more than five calendar days after the excavation work has commenced. These permits are non-transferable without the written permission of the director of public facilities or his/her designee. B. The applicant shall submit plans in duplicate, one set to the engineering department and one set to the department of public facilities at its administration office. C. Public utilities shall cause their inspectors to reasonably inspect during the excavation, temporary and final restoration of city streets. These inspectors shall be required to maintain, and submit to the department of public facilities, trench logs and inspection forms which record the method of excavation and installation, the quality of materials, soil and compaction tests used in patching and paving, where applicable. The public utility shall meet all requirements set forth in the state statutes and regulations, and the city's ordinances regarding construction, equipment installation and restoration, and is responsible for ensuring compliance with the requirements of this section. These forms and logs shall be modified to address different industry standards where applicable. D. A materials and/or compaction test, paid by the applicant, shall be required where the depth of opening, materials or other conditions warrant. E. The opening and/or excavation shall be refilled in manner that ensures that the same shall not settle. The depth for permanent patches shall be four inches, or the thickness prior to excavation, whichever is greater. A patch of any opening and/or excavation of any street or highway shall be hot mix bituminous asphalt except where the director of public facilities approves a substitute. A substitute will only be allowed during winter months when hot mix asphalt is not readily available due to plant closings. F. Final restoration shall be required as follows and is based on a combination or age of road and established Pavement Condition index (PCI) as determined by the city. The director of public facilities or his/her designee shall have discretion on adherence to this section and at times may enforce stricter requirements based on the nature of work. For roads that have been paved within the last five years and in good condition, the pavement restoration limits will be curb to curb. At a minimum, the standards for milling and depth of paving set forth in the policy of the State Department of Transportation for restoring utility trench excavations, highway maintenance directive number 93-1, shall be used. The depth of paving may be increased at the discretion of the director of public facilities depending on the amount of travel on an individual road or depending on the existing pavement thickness. For roads paved within ten years but no less than five years the pavement restoration limits will be centerline/esplanade to curb. This limit will consist of complete lane rehabilitation on a parallel plane, and restoration of any and all areas of impact as approved by the director of public facilities. At a minimum, the standards for milling and depth of paving set forth in the policy of the State Department of Transportation for restoring utility trench excavations, highway maintenance directive number 93-1, shall be used. The depth of paving may be increased at the discretion of the director of public facilities depending on the amount of travel on an individual road or depending on the existing pavement thickness. Milling or saw cutting from the road crown or centerline to the curb will be the method used for this operation unless construction operations impact into or disturb more than one lane, at which time complete curb or esplanade to curb rehabilitation will be required. Relief from these requirements may be obtained in writing from the director of public facilities. The director of public facilities shall have authority to negotiate the terms of pavement restoration with a utility company or contractor performing work in the city right-of-way. Final restoration will take place as soon as practical under industry standards, but in no case any later than six months from the date of the patch. The director of public facilities or his/her designee shall grant an exemption from all requirements for final restoration to any public service company, as defined in Section 16-1 of General Statutes of Connecticut, which requests such relief. G. Highway line striping on all roads requiring same shall be restored at the expense of the applicant according to city standards, as will any signage or signalization structures. Temporary pavement markings are required when permanent markings cannot be applied due to weather or when duration of time exceeds one week. All permanent marking must be applied as soon as possible. At no time will a paved area be left unmarked for longer than two weeks. H. The applicant shall provide a five-year guarantee of compaction and pavement serviceability from the date of completion or corrective repair, whichever is later. When the applicants are a public utility and a contractor, the guarantee shall be provided by the public utility. The five-year guarantee is separate from the three-year bond requirement. The director of public facilities reserves the right to uphold the five-year guarantee at his/her discretion and may take further action including the holding of future permit issuance to a utility or contractor deemed unresponsive. I. If an exemption has not been granted in accordance with subsection F., and the applicant fails to commence and/or complete final restoration in a satisfactory and timely manner, the city may perform such final restoration after thirty (30) days notice to, and at the full cost of, the applicant. J. The applicant shall post a bond in an amount satisfactory to fully comply with this section. The duration of the bond shall be three years. If the applicant is a public service company, as defined in Section 16-1 of the General Statutes of Connecticut and, if applicable, the work will be performed by an outside contractor hired by said company, the requirement of a bond shall be waived in accordance with Section 16-230 of the General Statutes of Connecticut, provided the utility submits the following documents to the director of public facilities: (1) a certificate of proof of solvency in accordance with Section 16-230 of the General Statutes of Connecticut; and (2) verification that the construction and/or restoration work will be performed by an employee of the utility, or a letter which states that the public service company shall be responsible for ensuring compliance with the requirements of this section. K. At the discretion of the director of public facilities, or his/her designee, a contractor who is found in violation of subsections C, D, E, F, G, H or I of this section more than once in a three-month period may be prohibited from performing construction, installation or restoration work on and in city streets for a minimum period of six months and a maximum period of twelve (12) months. This prohibition may be waived by the director for good cause shown and the submission of a written application. The director shall respond to all such requests within fifteen (15) business days of receiving the written application. No later than fifteen (15) days after the issuance of a denial of such a waiver, a contractor may request a public hearing for reconsideration of the denial. The department of public facilities shall hold such a hearing no later than fifteen (15) business days after a written request for reconsideration has been submitted to that department. The decision of the hearing officer appointed to that matter shall be final.
(Ord. dated 8/5/24)
Ask a question about Bridgeport law
Corpus searches the Bridgeport sections it holds and shows the ones that match, with their citations. Free, no sign-in.