For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.04.010 — Purpose—Procedures

Bridgeport, Connecticut Municipal Code (Supp. No. 24, Update 2: codified through Ordinance dated July 6, 2026) · Bridgeport Municipal Code § 13.04.010

Corpus is an independent public-information project, not the official City of Bridgeport website. Stable reference: corpuslaw.us/code/25fa4ac8-20e4-45e3-a3fc-5c36e64b20f4

13.04.010 - Purpose—Procedures.

A. This chapter establishes the procedures for making connection to the public sewer in the city's sanitary system. It also establishes specific limits for pollutant discharges which by their nature or by their interaction with sewage or the wastewater treatment facility, pollute the waters of the state, or otherwise create a public nuisance. This chapter also establishes fair and reasonable connection and user charges as required to pay all costs of acquisition, administration, construction, operation, maintenance and repair/replacement, of all elements of the sewage system, based upon consideration of factors including but not limited to the kind, quality and quantity of materials received in or introduced into the sewage system, as determined at metering points established or approved by the water pollution control authority. B. This chapter is intended to: 1. Create a water pollution control authority; 2. Inform the public as to the technical and administrative procedures to be followed in obtaining connection to the city's sanitary sewer system; 3. Prevent the introduction of pollutants into the sanitary sewer system which will interfere with the collection and/or treatment system; 4. Prevent the introduction of pollutants into the treatment system which will pass through the system, inadequately treated, into the waters of the state, or the atmosphere, or otherwise be incompatible with the system; 5. Improve the opportunity to reclaim wastewaters and sludges from the system. 6. Establish fair and reasonable connection and user charges as required to pay all costs of acquisition, administration, construction, operation, maintenance and repair/replacement, of all elements of the water pollution control authority system, based upon consideration of factors including but not limited to the kind, the quality and quantity of materials received in or introduced into the sewage system, as determined at metering points established or approved by the water pollution control authority. 7. Provide incentives for customers to avoid and eliminate groundwater infiltration and storm water inflow to the sewage system in order to reduce the capital and operating costs of the WPCA and costs to WPCA customers for the conveyance and treatment of uncontaminated water, and in order to protection of the environment by means of waste minimization and compliance with other provisions of this ordinance. C. This chapter shall apply to the city and to persons outside the city who are users of the sewage system. Except as otherwise provided in this chapter, the general manager of the water pollution control authority shall implement and enforce the provisions of this chapter.

(Ord. dated 5/5/14)

Ask a question about Bridgeport law

Corpus searches the Bridgeport sections it holds and shows the ones that match, with their citations. Free, no sign-in.