For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.04.350 — Computation of industrial user charges

Bridgeport, Connecticut Municipal Code (Supp. No. 24, Update 2: codified through Ordinance dated July 6, 2026) · Bridgeport Municipal Code § 13.04.350

Corpus is an independent public-information project, not the official City of Bridgeport website. Stable reference: corpuslaw.us/code/3960ec41-4437-4ba9-848e-27884e6b32cb

13.04.350 - Computation of industrial user charges.

A. The user charges for all manufacturing or other producers of wastewater over a minimum of twenty-five thousand (25,000) gallons per day to which this chapter applies, except for dry industries, will be computed by the use of the following formula: UC = VX + [YVW (C1-300) / 1000000 + ZVW (C2-350)]. / 1000000 UC = User charge (in dollars) for each billing period. V = Volume in gallons discharged to the city sanitary sewer system during the billing period. X = Cost per gallon of normal strength wastewater treated. Y = Cost to remove one pound of BOD. Z = Cost to remove one pound of TSS. W = Weight of water (8.33 lb./gal.). C1 = Concentration of discharge of BOD in mg/l. C2 = Concentration of discharge of TSS in mg/l. B. Those industries defined in this chapter as dry industries, or industries producing wastes containing BOD of less than three hundred (300) mg/l and TSS of less than three hundred fifty (350) mg/l, will pay a sewer service charge as established and revised by the WPCA. C. When an industry produces both domestic and process waste, the wastewater so delivered will be considered as industrial wastewater and the user charge computations will be in compliance with those described above in this section, based on combined volume, BOD and TSS content. D. A permittee may reduce his user charge rate by greater removals in pretreatment or plant operation procedure, but once the pretreatment or plant procedure is established to obtain a uniform or lower rate, written consent from the general manager to increase the delivered strength shall be required, and charges for a higher rate based on tests by the WPCA may be made without other notice to the permittee. E. Monthly or quarterly billing for industrial wastewater disposal will be accomplished using the established procedures.

(Ord. dated 5/5/14)

Ask a question about Bridgeport law

Corpus searches the Bridgeport sections it holds and shows the ones that match, with their citations. Free, no sign-in.