§ 13.04.440 — Building sewers and connections

Bridgeport, Connecticut Municipal Code (Supp. No. 24, Update 2: codified through Ordinance dated July 6, 2026) · Bridgeport Municipal Code § 13.04.440

Corpus is an independent public-information project, not the official City of Bridgeport website. Stable reference: corpuslaw.us/code/3e055c80-6e67-4d7a-8dcf-abe49c427a71

13.04.440 - Building sewers and connections.

A. The director of public facilities shall direct licenses to be issued to such persons as shall be deemed competent to make all necessary connections with gas and water mains and public sewers. Each gas and water company shall have the right to nominate the person to tap its own mains. No person shall make or close up any connection with any such main or sewer, except the persons duly licensed as aforesaid. No person shall make any excavation in any street, or make any connection as aforesaid, except under authority of a license or permit therefor, issued by the director. B. No unauthorized person(s) shall uncover, make any connections with or opening into, use, alter, repair or disturb any public sewer or appurtenance thereof. C. Any person proposing a new discharge into the public sewer system or a substantial change in the volume or character of pollutants that are being discharged into the public sewer system shall notify both the director of public facilities and general manager at least forty-five (45) days prior to the proposed change or connection. D. A person intending to connect a building sewer from his property to the public sewer shall first obtain a permit to connect from the director of public facilities and the general manager. The applications shall be made on forms provided by the director of public facilities and the general manager of the WPCA, and it shall be accompanied by a sketch or plan showing the proposed installation in sufficient detail to enable the city engineer to determine that the proposed installation meets the requirements of this regulation and other applicable specifications, codes and laws. The application shall be signed by the owner of the premises to be served or his authorized agent and by the qualified contractor who has been chosen to perform the work of installing and connecting the building sewer to the public sewer. Upon approval of the application and plan, a permit shall be issued to have the work performed by the stated contractor. In the event the premises changes ownership before the work is completed, or if another contractor is chosen to perform or furnish the work, the original permit becomes void, and a new permit must be obtained by the new parties in interest. E. A connection to the public sewer will be made only after the building's plumbing has been approved by the city building inspector in order to ensure that minimum standards are met for the installation. A fresh air vent shall be required for the building and all plumbing shall be in good working order. No trench containing a building drain or connection to the sanitary sewer shall be backfilled until the general manager or his agent has completed an inspection of and approved the work. The water level in the trench shall be maintained at a level below the sewer connection before the cap is removed and while the connection is being made and until such time as it has been inspected, approved and backfilled. The contractor shall notify the general manager twenty-four (24) hours before starting any work authorized under this permit. F. Owners of land in adjoining towns may petition the WPCA in writing for the right to connect the sewers and drains from such lands with sewers. Each petition shall set forth the character and size of the owner's sewers or drains and a description of its materials and shall be accompanied by a survey, plan or layout showing the position of such sewer or drain and all connections thereof in such adjoining town and the place where such connection is to be made. The WPCA may then allow such connection to be so made and shall specify the manner, terms and conditions of the same. G. Permits to connect to the public sewer may be revoked and annulled by the director of public facilities or the general manager for such cause and at such times as he may deem sufficient and the city and WPCA held harmless as a consequence of said revocation or the cause thereof. All other parties in interest shall be held to have waived the right to claim damages from the city or its agents on account of said revocation. H. All costs and expenses incidental to the installation and connection of the building sewer shall be borne by the owner(s). The owner(s) shall indemnify the city from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer. I. A separate and independent building sewer shall be provided for every building. J. Existing building sewers may be used in connection with new buildings only when they are found, and proven to the satisfaction of the director of public facilities or general manager, to meet all requirements of this chapter. K. The size, slope, alignment, materials of construction of a building sewer and the methods to be used in excavating, installing the pipe, testing and backfilling the trench and connection of the building sewer to the public sewer shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city and WPCA. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the ASTM and WPCF Manual of Practice No. 9 shall apply. L. Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor with the exception of combined sewer areas. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by an approved means and discharged to the building sewer. Duplex lift systems shall be provided for commercial and industrial buildings. M. No person(s) shall make connection of roof downspouts, foundation drains, areaway drains or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer. Connection to a public combined sewer is allowed if no public storm sewer is available. N. All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the city. O. No building sewers shall be constructed within twenty-five (25) feet of a water supply well. If a building sewer is constructed within twenty-five (25) to seventy-five (75) feet of a water supply well, it shall be constructed in accordance with all applicable guidelines promulgated by the commissioner. P. All building sewers shall be installed by a drain layer who possesses a valid license issued under Chapter 393 of the Connecticut General Statutes as amended.

(Ord. dated 5/5/14)

Ask a question about Bridgeport law

Corpus searches the Bridgeport sections it holds and shows the ones that match, with their citations. Free, no sign-in.