For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-202 — Fixing and deferral of industrial assessments on real property within the enterprise zone and the rehabilitation areas

Code of Ordinances of the City of Bristol, Connecticut (Codified through Amendments of February 11, 2025, effective February 28, 2025. (Supp. No. 4)) · Bristol Code of Ordinances § 18-202

Corpus is an independent public-information project, not the official City of Bristol website. Stable reference: corpuslaw.us/code/f3891069-4a5b-47f9-9023-87be8e4baf00

Sec. 18-202. - Fixing and deferral of industrial assessments on real property within the enterprise zone and the rehabilitation areas.

(a) Improvements of any real property which qualifies as a manufacturing facility under Section 32-9p(d) of the General Statutes shall be eligible for any fixed assessment pursuant to Section 32-9p-5. (b) There shall be a benefit floor. Only projects meeting minimum expenditures or scope of work for that zoning or use designation shall receive the assessment benefits herein. Industrial. The cost of renovation necessary to bring manufacturing buildings to code and ready for substantial use, or one hundred thousand dollars ($100,000.00) spent, or two hundred fifty thousand dollars ($250,000.00), spent in demolition and/or environmental review and remediation by the owner. (c) Eligible improvements include repair, upgrade, or replacement of: (1) Roofing; siding (except external insulation systems at grade level such as Drivet or other brand names, or that which obscures the architectural detail of a building); windows; flooring; painting; porches; decks; kitchen replacement; wiring; heating, ventilation and cooling; insulation; paving (except sidewalks); lead paint or asbestos abatement or removal; masonry and foundations; plumbing; and bathrooms. (2) The economic and community development department or its designee shall be the final arbiter of qualifications of work to be performed. (3) Individuals and companies seeking abatements shall submit plans with their enterprise zone application to the economic and community development department within thirty (30) days of submitting their building permit application. Along with a site plan, there should be drawings of elevations or improvements. A narrative of work to be performed should include a description of current conditions and all work to be performed including materials to be used. The need for professional drawings may be waived if a written description and photographs can clearly illustrate work to be performed. Any project issued a building permit on or after November 1, 1994 and before final state designation shall have until September 30, 1995 to apply. (4) Revisions to the dollar value of the benefit floors contained herein should be reviewed periodically and may be changed by a majority resolution of the city council.

(Ord. of 2-14-95; Ord. of 4-10-95; Ord. of 2-11-20)

Ask a question about Bristol law

Corpus searches the Bristol sections it holds and shows the ones that match, with their citations. Free, no sign-in.