§ 21-129 — Pavement construction schedule
Code of Ordinances of the City of Bristol, Connecticut (Codified through Amendments of February 11, 2025, effective February 28, 2025. (Supp. No. 4)) · Bristol Code of Ordinances § 21-129
Corpus is an independent public-information project, not the official City of Bristol website. Stable reference: corpuslaw.us/code/72858833-7ca0-4116-985a-15b232262020
Sec. 21-129. - Pavement construction schedule.
The bituminous concrete surface on all streets shall not be constructed until ordered by the superintendent of public works and the city engineer. If the volume of construction on private property warrants it, the roadway base shall receive two (2) coats of hot liquid asphalt and sand as specified in this article to provide a temporary wearing surface until such time as the permanent surface is feasible.
(Code 1960, § 49-3.14; Ord. of 2-3-70)
Ask a question about Bristol law
Corpus searches the Bristol sections it holds and shows the ones that match, with their citations. Free, no sign-in.
