For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 42-86 — Permanent repairs to roads

Code of Ordinances of the City of Danbury, Connecticut (Codified through Ordinances of May 2, 2023 (Supp. No. 2; publisher-stale)) · Danbury Code of Ordinances § 42-86

Corpus is an independent public-information project, not the official City of Danbury website. Stable reference: corpuslaw.us/code/61c10f80-3f39-4306-aafe-2ec2fce8a1ce

Sec. 42-86. - Permanent repairs to roads.

(a) Surface treatment and gravel base, or bituminous concrete surface with gravel base, or bituminous concrete surface and binder course with gravel base. The permittee shall cut back sides of the path area with a saw or a pneumatically operated spade. The cut shall be vertical and in straight lines as directed by the Superintendent of Public Highways. If pavement outside of the trench area has settled, cracked or been damaged in any way due to excavation, it shall also be included in the removal and repair. If the trench edge is generally three (3) feet or less from the face of the curb or from the edge of a concrete gutter, the pavement between said curb or gutter shall be removed and replaced in its entirety. (1) After the temporary material has been removed, the kerfed edges shall be given a light tack coat with an asphalt emulsion or RC-2. The hot-laid bituminous concrete shall then be placed so as to give either a minimum of a two-inch compacted surface or the full depth of the existing bituminous concrete pavement, whichever is greater. The Superintendent of Public Highways shall require a power-driven roller for compaction. The finished surface shall be tight and free from waves or depressions. (2) After final rolling has been completed the entire exposed joint shall be sealed with a coating of asphalt emulsion or RC-2, overlapping all edges at least two (2) inches. (3) See subsection (d) of this section relative to the option of pavement overlays. (b) Bituminous concrete surface and penetration macadam base, or surface treatment and penetration macadam base. On relatively small repairs, that is, less than three (3) feet in width and twenty (20) feet in length, permanent repairs may be made, if authorized by the Superintendent of Highways, with a processed gravel base and a hot-laid bituminous class I or II concrete surface course in a manner previously described. (1) For repairs where large areas of pavement are involved, permanent repairs shall conform to the undisturbed section of the existing road thickness and type of material to be used. Material specifications and construction methods shall be in accordance with the City's standard specifications for this type of work. (2) See subsection (d) of this section relative to the option of pavement overlays. (c) Bituminous concrete surface and cement concrete base, or cement concrete surface and gravel base, or bituminous concrete surface and soil cement base. The temporary patch shall be removed from the original excavation and the subgrade smoothed so that there will be a uniform depth over the area equal to the depth of the slab. However, no additional filling of the subgrade will be permitted at this time, and, if any part of the normal subgrade under the temporary patch is excavated when the patch is removed, the entire void shall be filled with concrete when the permanent patch is poured. Following the removal of the temporary patch, the existing pavement shall be cut back at least twelve (12) inches beyond both edges of the original excavation, care being taken not to disturb the base below the concrete thus removed. This shelf or ledge will provide a firm support for the permanent patch. Whenever the present pavement opening is six (6) feet, six (6) inches or less from a transverse expansion joint, or three (3) feet or less from a longitudinal joint or the outer edge of pavement, the entire part of the concrete pavement from the excavation to the joint or edge shall be removed and replaced with the new surface. All final cuts in concrete pavement shall be made with a concrete saw in straight lines and square corners. When using the concrete saw, care shall be taken not to cut any reinforcement. The saw cut shall extend to the top of the reinforcement only; concrete below this shall be taken out with a pavement breaker. The entire subgrade and edges of the original pavement shall be wet down before the new concrete is placed. Care shall be taken to ensure that expansion joints are re-established, when destroyed by the permittee's operations, in a manner comparable to the original installation. (1) Materials. a. Cement. All cement shall be Portland cement which will conform with the requirements of the specifications of the American Association of State Highway Officials, M-85, type II with all subsequent changes or additions. The proportion of concrete for all pavement work shall be 1-2-2½, which is one (1) part cement, two (2) parts fine aggregate or sand, and two and one-half (2½) parts coarse aggregate or stone, which by weight is as follows: cement, ninety-four (94) pounds; sand or fine aggregate, one hundred eighty-one (181) pounds; stone or coarse aggregate, two hundred twenty-six (226) pounds. To these materials shall be added not more than five (5) gallons of water for each bag of cement used. b. Fine aggregate. Fine aggregate shall be sand, consisting of clean, hard, durable, uncoated particles of quartz or other rock, free from lumps of clay, soft or flaky material, loam or organic material. In no case shall sand containing frozen material be used. Fine aggregate shall be uniformly graded from coarse to fine and shall meet the following requirements: Square-Opening Sieves | Percent by Weight Passing ⅜-inch | 100 No. 4 | 95—100 No. 16 | 45—80 No. 30 | 20—55 No. 50 | 10—30 No. 100 | 2—10 The gradation in this table represents the extreme limits which shall determine suitability for use from all sources of supply. The gradation from any one (1) source shall be reasonably uniform and not subject to the extreme percentages of graduation specified in this table. For the purpose of determining the degree of uniformity, a fineness modulus determination shall be made upon representative samples from any source. Fine aggregates from any one (1) source having a variation in fineness modulus greater than two-tenths (0.20) either way from the fineness modulus of the representative samples shall be rejected. c. Coarse aggregate. Coarse aggregate shall be broken stone, or gravel when allowed, consisting of clean, hard, tough, durable fragments of rock of uniform quality throughout. It shall be free from soft, disintegrated pieces, mud, dirt, organic or other injurious material and shall not contain more than one (1) percent crusher dust by weight. The coarse aggregate shall consist of fifty (50) percent, one and one-quarter-inch and fifty (50) percent, one-half-inch broken stone. Percent by Weight Passing Sieves in Gradation of Coarse Aggregate Size of Sieve | 1¼-inch stone | ½-inch stone 1½-inch | 100 1¼-inch | 90—100 1-inch | 35—70 ¾-inch | 0—25 ⅝-inch | 100 ½-inch | 0—5 | 90—100 ⅜-inch | 30—50 No. 4 | 0—8 No. 8 | 0—3 d. Water. The water shall be reasonably clean, shall not be salty or brackish, and shall be free from oil, acid and injurious alkali or vegetable matter. Water shall not be taken from shallow, muddy or marshy surfaces. (2) Measurement of materials. Quantity shall be measured carefully, and the permittee shall be required to use such equipment as, in the opinion of the inspector, shall ensure uniformity of volume and proportion. Proportioning by means of shovels will not be permitted. In determining the volume of aggregate, consideration shall be given to the bulking effect of any moisture contained in these materials. (3) Mixing. A truck mixer shall be used. The permittee shall add, an extra forty-seven (47) pounds of Portland cement to each cubic yard of concrete proportioned by the formula mentioned heretofore. The dry mix shall be batched at a central plant and transported to the site of the work in the truck mixer. The water shall be added only after the arrival of the truck mixer at the site of the work, and the amount of water added shall be under the control of the inspector. a. When the concrete is mixed in top-door-loading truck mixers, the mixing period shall consist of not less than forty (40) revolutions of the drum, at mixing speed, after the water is added to the cement and aggregates in the drum. b. When concrete is mixed in end-loading truck mixers and the mixer is loaded in excess of fifty (50) percent but not in excess of fifty-seven and one-half (57½) percent of the gross volume of the drum, the mixing period shall consist of not less than sixty (60) revolutions of the drum, at mixing speed, after the water is added to the cement and aggregates in the drum. If loaded to not more than fifty (50) percent of the gross volume of the drum, the mixing period shall consist of not less than forty (40) revolutions of the drum, at mixing speed, after the water is added to the cement and aggregates in the drum. During the period of the mixing, the drum shall rotate at the speed for which it has been designed. The entire contents of the mixer shall be removed from the drum before materials for the succeeding batch are placed therein. The mixer shall preferably be equipped with mechanical means for preventing the addition of aggregate after the mixing has commenced, but in any event the addition of aggregate after the commencement of mixing shall not be permitted. (4) Retempering. Concrete shall be mixed only in such quantities as are required for immediate use and shall be used fresh and before initial set has taken place. Any concrete in which initial set has begun shall be wasted and not used in the work. No retempering of concrete shall be allowed. (5) Placing concrete. Concrete shall be placed on a moist subgrade in the area to be patched in a continuous horizontal layer immediately after the mixing, and in no case shall concrete be used which has not reached its final position within twenty (20) minutes after the time the water is first added to the mix. The method and manner of placing shall be such as to avoid the possibility of segregation or separation of the aggregate or the displacement of the reinforcement. Special care shall be taken to fill each part of the area by depositing concrete directly as near to its final position as possible. (6) Finishing concrete. On narrow patches, concrete may be compacted by working with a slicing rod and tamper. On large areas, the new concrete shall be vibrated with an immersion-type vibrator. After all of the concrete is in place and well worked, it shall be finished to a smooth and even surface by the use of a straight-edge or wood float so that when the concrete has set it will conform to the cross-section of the surrounding pavement or base course. On concrete pavements, when the concrete has taken up all the water and just before initial set, the new patch shall be gone over with a broom, drawn from inside to outside of the patch, after which the exposed edge and the edge parallel to all expansion joints shall be finished with an edging tool acceptable to the Inspector. The inspector shall determine whether dragging the surface with burlap is required to match the texture of the original surface. Where bituminous concrete surface is used, the surface of the base course shall be roughened with a rake or similar instrument so that a good bond may be obtained. (7) Curing and protection: a. Normal weather. Under normal weather conditions, after the surface of the concrete has been given its final finish, it shall be protected by a covering of moist mats. These mats shall be laid longitudinally over the surface of the finished pavement by unrolling from a supported roll, so as not to bring an excessive weight upon or to mar the new surface of the pavement. When properly laid, these mats shall be saturated and kept saturated for a period of seventy-two (72) hours, at the end of which time they may be removed, and no further wetting or artificial curing will be required. b. Cold weather protection. When, in the opinion of the Superintendent of Highways the condition of the weather is such that any pavement which has not been completely cured is liable to be frozen, such pavement shall be protected by covering it, as soon as the concrete has hardened sufficiently, with mats acceptable to the Superintendent of Highways, upon which shall be placed a layer of hay or straw, six (6) to eight (8) inches in thickness, over which another layer of mats shall be spread. The edges of these mats shall be firmly fastened in place. The protecting material shall remain in place for such time as the Superintendent of Highways may direct. Any concrete laid during cold weather shall be placed at the permittee's risk, and all damaged sections shall be removed and replaced at his own expense. (d) Bituminous concrete overlay. The permittee shall overlay the entire road width with bituminous concrete. The temporary pavement (except cold patch mix which shall be removed) specified under section 42-84 shall serve as a base for permanent pavement. The permittee shall fill all depressions and potholes with bituminous concrete and properly clean and prepare the entire road surface to receive a final overlay of bituminous concrete.

(Code 1961, § 17-79; Ord. No. 245, § 35, 8-7-1979; Ord. No. 284, 6-1-1982; Ord. No. 347, 6-2-1987)

Ask a question about Danbury law

Corpus searches the Danbury sections it holds and shows the ones that match, with their citations. Free, no sign-in.