For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-21 — Amendment of State Building Code

Code of Ordinances of the City of Danbury, Connecticut (Codified through Ordinances of May 2, 2023 (Supp. No. 2; publisher-stale)) · Danbury Code of Ordinances § 6-21

Corpus is an independent public-information project, not the official City of Danbury website. Stable reference: corpuslaw.us/code/46920982-d5ac-4d57-8b31-f0dcf75c6274

Sec. 6-21. - Amendment of State Building Code.

(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning: Value of work, actual cost of the work and actual cost of demolition mean and include the entire cost to the owner of construction, alteration, repair or demolition and shall include the value of all materials and labor used. _____ (b) Fees generally. (1) In accordance with the provisions of section 108.2 of the State Building Code, before receiving a building permit the owner or his agent shall pay a fee in accordance with the following schedule and based on the value of the work to be performed: Valuation of Work | Fee For single-family and multifamily residential structures below one thousand dollars ($1,000.00) in value | Twenty-two dollars ($22.00)* One thousand dollars ($1,000) and above | Twenty-two dollars ($22.00) for the first one thousand dollars ($1,000.00) in value plus eleven dollars ($11.00) for each additional one thousand dollars ($1,000.00) or part thereof* For commercial and industrial structures | Eighteen dollars ($18.00) per one thousand dollars ($1,000.00) or part thereof* For separate permits, available at the option of the owner, covering mechanical, electrical, plumbing, heating and air conditioning, sprinklers, chimneys and fireplaces | Five dollars ($5.00) for each one hundred dollars ($100.00) in value up to one thousand dollars ($1,000.00) plus eleven dollars ($11.00) for each additional one thousand dollars ($1,000.00)* *Except that the fee for all residential and commercial structures located in the Downtown Revitalization Zone as specified in section 7.F. of the City of Danbury Zoning Regulations shall be reduced by fifty (50) percent. Any State fees shall not be reduced. No application for a building permit shall be processed without payment of the foregoing fees. If after the filing of an application for a building permit a change is made to the scope of the work to be performed which affects the value of the work, a new fee shall be calculated. Any increase in the fee shall be paid prior to the issuance of a building permit unless a building permit has already been issued, in which case said increased fee shall be paid prior to the issuance of a certificate of occupancy. Any decrease in the fee resulting from a change in the work shall be refunded in accordance with the provisions of subsection (e) of this section. (2) The fee established in subsection (b)(1) of this section shall cover the eight (8) inspections specified herein or so many thereof as are required or applied for on any particular project. Required inspections, to the extent applicable, include: a. Footing inspections. b. Footing drains and waterproofing. c. Rough electrical. d. Rough plumbing. e. Framing. f. Insulation. g. Gas or oil burner. h. Final; including, but not limited to, electrical, plumbing, fire divisions and exits. Additional inspections shall be performed for an additional fee of thirty-three dollars ($33.00) per inspection. Each separate trip to the site shall be deemed to be a separate inspection. Such additional fees shall be due and payable prior to the issuance of a certificate of occupancy. The holder of a valid building permit may request that some or all of the foregoing inspections be performed outside of normal business hours. The Building Official may authorize performance of such inspections outside of normal business hours if appropriate personnel are available to provide such service. No certificate of occupancy shall be issued to any permit holder for whom inspections have been performed outside of normal business hours until the permit holder has paid a fee to cover the additional expense incurred by the city in connection with such inspections. All such fees shall be in an amount equal to the wages paid to personnel performing said inspections. (c) Additional fees. Before receiving a permit or certificate for the following uses or for the conduct of any of the following activities, the owner or his agent shall pay the fee prescribed below: Type of Permit or Certificate | Fee (1) Demolition permits | Four percent (%) of the actual cost of demolition (2) Permits for the moving of buildings | Two hundred seventy-five dollars ($275.00) per building (3) Permits for wood stoves | Fifty-five dollars ($55.00) each (4) Permits for tanks a. With a capacity of six hundred sixty (660) gallons or less | Fifty-five dollars ($55.00) each b. With a capacity of more than six hundred sixty (660) gallons but less than two thousand (2,000) gallons | Eighty-three dollars ($83.00) each c. With a capacity of two thousand (2,000) gallons or more | One hundred ten dollars ($110.00) each (5) Permits for signs a. If ten (10) square feet or less | Eleven dollars ($11.00) b. If in excess or ten (10) square feet | Eleven dollars ($11.00) for the first ten (10) square feet plus fifty-five cents ($0.55) for each additional square foot or part thereof (6) Certificate of occupancy | Twenty-eight dollars ($28.00) each (7) Pools | Fifty-five dollars ($55.00) for the first one thousand dollars $1,000.00) in value plus eleven dollars ($11.00) for each additional one thousand dollars ($1,000.00) or part thereof (8) Certificate of approval. For all completed work that requires a building permit but does not require a certificate of occupancy. Such work shall include, but not be limited to: fences over six (6) feet in height; retaining walls over three (3) feet in height; and electrical, plumbing and mechanical repairs or alterations performed in the absence of additional work that requires a certificate of occupancy. | Twenty-eight dollars ($28.00) each (d) Exemptions. (1) Demolition performed by, or on behalf of, any State, Federal or Municipal government shall be exempt from the permit fee requirements of this section. (2) Artistic or cultural organizations shall be exempt from the permit fee requirements of this section, provided that the work for which a building permit is sought is intended to be used exclusively for carrying out the artistic or cultural activities of the organization. For purposes of this section, the term "artistic or cultural organization" means a nonprofit organization in the State which is exempt from taxation pursuant to section 501(c)(3) of the Internal Revenue Code of 1986, as from time to time amended, the primary purpose of which is the participation in, promotion, development, acceptance or appreciation of, artistic and cultural activities which shall include, but are not limited to, music, theater, dance, painting, sculpture, architecture, literature, films and allied arts and crafts. In order to be eligible for exemption under this subsection, no officer, member or employee of such organization may receive or, during the calendar year preceding the building permit application, have received any pecuniary profit from the operations of the organization except reasonable compensation for services in effecting its artistic or cultural purposes or as proper beneficiary of the strictly charitable purposes thereof. (e) Refunds. (1) In the event that an application is withdrawn prior to the issuance of a building permit, the applicant may obtain a refund of eighty (80) percent of the fee paid pursuant to the provisions of subsection (b)(1) of this section. Twenty (20) percent of said fee shall be retained to cover the costs associated with application and plan reviews. No such refund may be made unless the applicant shall apply for the refund within one (1) year of the date of application. (2) In the event of a change in the work which results in a reduction of the fee required pursuant to the provisions of subsection (b)(1) of this section, the applicant may obtain a refund of eighty (80) percent of said fee. Twenty (20) percent of said fee shall be retained to cover the costs associated with application and plan reviews. No such refund may be made unless the applicant shall apply for the refund within one (1) year of the date of application. (3) In accordance with the provisions of the State Building Code, any building permit issued by the Building Official shall become invalid if the authorized work is not commenced within six (6) months after issuance of the permit. In the event of the expiration of a permit in accordance with the foregoing, the permittee may obtain a refund of eighty (80) percent of the fee paid pursuant to the provisions of subsection (b)(1) of this section. Twenty (20) percent of said fee shall be retained to cover the costs associated with application and plan reviews. No such refund may be made unless the permittee shall apply for the refund within one (1) year of the date of issuance of the permit. (f) Renewal. (1) In accordance with the provisions of the State Building Code, any building permit issued by the Building Official shall become invalid if the authorized work is not commenced within six (6) months after the issuance of the permit, or if the authorized work is suspended or abandoned for a period of six (6) months after the time of commencing the work. In the event of the expiration of a building permit in accordance with the foregoing, the permittee may make application for the renewal of the permit upon payment of the fee required hereunder. (2) The fee for the renewal of a building permit pursuant to the provisions of this subsection shall be equal to twenty (20) percent of the original permit fee or the difference between the original permit fee and the permit fee which would otherwise be paid for a new permit issued at the time of the renewal, whichever is greater. No building permit may be renewed more than twice pursuant to the provisions of this section.

(Code 1961, § 6-02; Ord. of 8-28-1961; Ord. of 11-9-1961; Ord. of 10-4-1962; Ord. No. 26, 1-7-1965; Ord. No. 122, 12-5-1967; Ord. No. 176, 5-2-1972; Ord. No. 266, 2-3-1981; Ord. No. 297, 5-3-1983; Ord. No. 317, 6-4-1985; Ord. No. 368, 9-7-1988; Ord. No. 384, 2-6-1990; Ord. No. 419, 6-4-1991; Ord. No. 429, 11-7-1991; Ord. No. 525, 3-4-1997; Ord. No. 528, 3-4-1997; Ord. No. 544, 5-2-2000; Ord. No. 559, 5-15-2001; Ord. No. 5770, 5-7-2002; Ord. No. 608, 4-6-2004; Ord. No. 719, § 6-02, 11-19-2012; Ord. No. 10, 5-6-2014)

Ask a question about Danbury law

Corpus searches the Danbury sections it holds and shows the ones that match, with their citations. Free, no sign-in.