For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 31-302 — Definitions

Code of Ordinances of the City of Hartford, Connecticut (Supp. No. 119: codified through Ordinance of May 11, 2026) · Hartford Code of Ordinances § 31-302

Corpus is an independent public-information project, not the official City of Hartford website. Stable reference: corpuslaw.us/code/d66c54c9-42a6-4336-8c61-a1de3aad4819

Sec. 31-302. - Definitions.

For purposes of this article the following definitions apply: Complete street means a public right-of-way that is planned, designed, constructed, operated, and maintained in such a way as to enable safe, comfortable and convenient access along and across the right-of-way by users of all ages and abilities. Improvement project means new construction, reconstruction, resurfacing, rehabilitation, repair or maintenance of the existing transportation network located within the public right-of-way or that may affect the public right-of-way, whether such improvement project is funded wholly, partly, or not at all by the city. An improvement project does not include ordinary repair designed to keep transportation network facilities in safe working condition, such as, but not limited to, mowing, cleaning, sweeping, spot repair, pothole filling, water, sewer and drainage or other utility installation or repairs. Phase means planning, design, construction, operation, and maintenance. Public right-of-way means an area, public or private, dedicated for use by pedestrians and vehicles. Public right-of-way includes thoroughfares such as streets, highways, bike paths and walkways and normally incorporates curbs, lawn strips, street trees, sidewalks, lighting, signage, drainage facilities, street furniture, and other similar features.

(Ord. No. 07-16, 8-8-16; Ord. of 10-21-24)

Ask a question about Hartford law

Corpus searches the Hartford sections it holds and shows the ones that match, with their citations. Free, no sign-in.