§ 4.18.1 — BUILDING SITING
Code of Ordinances of the City of Hartford, Connecticut (Supp. No. 119: codified through Ordinance of May 11, 2026) · Hartford Zoning Regulations § 4.18.1
Corpus is an independent public-information project, not the official City of Hartford website. Stable reference: corpuslaw.us/code/4d56dd19-fa08-41d4-9ee3-0bff54f7d6ae
4.18.1 - BUILDING SITING
The following defines the line item requirements within subsection "A. Building Siting" in each Building Type Table. Refer to 4.3 through 4.16 Building Types. A. Multiple Principal Buildings. The allowance of more than one principal structure on a lot. (1) Not Permitted. When noted as such, the building type is limited to one principal building per lot. (2) Permitted. When noted as such, the building type is permitted to have more than one principal building per lot. Each building shall fulfill the requirements of the building type, and combined shall fulfill the minimum Front Lot Line Coverage requirement, unless otherwise noted. B. Occupation of Corner. When required, a principal building shall be located at the intersection of the front and corner build-to zones. Refer to Figure 4.18-A Build-to Zone & Occupation of Corner. C. Minimum Front or Primary Lot Line Coverage. The minimum percentage of street wall or building facade required along the street. (1) Measurement. The width of the principal structure(s) (as measured within the front or Primary Street build-to zone) shall be divided by the maximum width of the front or Primary Street build-to zone. Refer to Figure 4.18-B Measuring Front Lot Line Coverage. (2) Exceptions. Exceptions, such as the following, are noted in the tables. (a) Some building types have this number set to also allow the development of a courtyard along the front lot line. (b) Some building types allow side yard parking to be exempted from the Front Lot Line Coverage calculation. Figure 4.18-A Build-to Zone & Occupation of Corner [image omitted; see the official code] D. Front or Primary Street Build-to Zone. The build-to zone parallel to the front or Primary Street lot line, typically defined in reference to the Building Line. In the downtown districts, this build-to zone is defined by Primary Street designation, located on the city's Zoning Map. Refer to Figure 4.18-A Build-to Zone & Occupation of Corner. (1) Encroachments. (a) Building-supported awnings, canopies, balconies, eaves, and cornices are permitted to encroach beyond the building line up to 5 feet over the lot line, provided they allow a minimum of 8 feet vertical clearance in any public right-of-way. No additional support is permitted. (b) A porch or stoop may project into the front yard for a distance not less than 5 feet and not exceeding 10 feet, or the established veranda line, whichever is more restrictive. This shall be interpreted to include porches which may be enclosed by removable windows or fixed canopies. (c) Ramps are preferred in the side or rear yard and shall not encroach into the respective setbacks. If a ramp is to be located in the front yard, it shall not encroach beyond the veranda line or other setbacks. Exception to the requirements of front yard placement may be given by the zoning administrator if a Reasonable Accommodation form is completed and placed on file with the Planning Division. Figure 4.18-B Measuring Front Lot Line Coverage [image omitted; see the official code] (2) Determining Front Lot Line on Corner Lot. On corner lots, the front lot line is determined first by primary street designation per 2.2.3 Primary Street Designations. If no primary street designation is determined, the front lot line shall be determined by the 2 abutting lots on each side of the lot under the direction of the zoning administrator. Figure 4.18-C Maximum Impervious & Additional Semi-Pervious Coverage [image omitted; see the official code] (3) Percent Within Build-to Zone. A minimum of 80 percent of each building must be placed within the build-to zone, and the remaining 20 percent must be placed within the build-to zone or within 6 feet behind the build-to zone. When meeting this requirement, the zoning administrator shall determine that the portion of the building not within the build-to zone does not adversely impact the streetscape and character of the architecture. E. Corner or Secondary Street Build-to Zone. The build-to zone or setback parallel to the corner lot line. In the downtown districts, this build-to zone is defined by the Secondary Street designation, located on the city's Zoning Map. (1) Encroachments. Building-supported awnings, canopies, balconies, bays, eaves, and cornices are permitted to encroach provided they allow a minimum of 8 feet vertical clearance in any public right-of-way. No additional support is permitted. F. Minimum Side Setback. The minimum required building setback along a side lot line. (1) Encroachments. Building-supported awnings, bays, eaves, and cornices are permitted to encroach beyond the building line up to 2 feet from the lot line. No additional support is permitted. G. Minimum Rear Setback. The minimum required building setback along a rear lot line. H. Minimum Lot Width. The minimum width of a lot, measured at the front or Primary Street lot line. I. Maximum Building Width. The maximum width of the building measured parallel to the front or Primary Street lot line. J. Maximum Building Coverage. The maximum percentage of a lot permitted to be covered by principal structures and accessory structures. Figure 4.18-D Surface Parking Lot [image omitted; see the official code] K. Maximum Impervious Area. The maximum percentage of a lot permitted to be covered by principal structures, accessory structures, pavement, and other impervious surfaces. Refer to Figure 4.18-C Maximum Impervious & Additional Semi-Pervious Coverage. L. Additional Semi-Pervious Area. The additional percentage of a lot beyond the maximum impervious coverage, which may be covered in a semi-pervious surface, including a green roof or pavers. Refer to 1.6 Definitions for definition of a semi-pervious surface. Refer to Figure 4.18-C Maximum Impervious & Additional Semi-Pervious Coverage. M. Permitted Parking & Loading Location. Each building type defines yards where surface parking lots and accessory parking structures are permitted. Refer to 1.6 for yard definition and Figure 4.18-D Surface Parking Lot. (1) Corner Side & Front Yards. Parking is not permitted in any corner side or front yard. (2) Rear Yard. Parking is permitted in the rear yard, but may not encroach into the minimum rear and side setback areas. Refer to 6.0 Sitework & Landscape for buffers and parking lot landscape requirements. (3) Side Yard. Parking may be either permitted or limited in the side yard, but may not encroach into the minimum side setback areas. (4) Loading Location. Loading, refuse and recycling collection is defined per permitted yard, typically the rear yard. Refer to 1.6 for yard definition. Refer to 6.12 Screening of Necessary Appurtenances. N. Permitted Vehicular Access. The permitted means of vehicular ingress and egress to the lot. Refer to 4.1.2 I. for general vehicular access design requirements and 7.5 Site Access & Driveways. Figure 4.18-E Measuring Height [image omitted; see the official code]
(Amend. of 12-13-2022)
Ask a question about Hartford law
Corpus searches the Hartford sections it holds and shows the ones that match, with their citations. Free, no sign-in.
