§ 7.4.5 — PAVEMENT CONSTRUCTION
Code of Ordinances of the City of Hartford, Connecticut (Supp. No. 119: codified through Ordinance of May 11, 2026) · Hartford Zoning Regulations § 7.4.5
Corpus is an independent public-information project, not the official City of Hartford website. Stable reference: corpuslaw.us/code/05d8548b-ef19-4e48-8f2b-edd560ea8dc4
7.4.5 - PAVEMENT CONSTRUCTION
Pavement construction standards of 7.3.1 H. shall apply to all loading spaces. Figure 7.4-A Required Loading Facilities ***Expand table to lock table headings in place while scrolling*** REQUIRED LOADING FACILITIES Gross Floor Area | Loading Spaces Required 0—1,400 square feet | 0 spaces 1,401—20,000 square feet | 1 space 20,001—100,000 square feet | One space plus one space for every 20,000 square feet in excess of 20,000 square feet 100,001—500,000 square feet | 5 spaces plus one space for every 40,000 square feet in excess of 100,000 square feet 500,001+ | 15 spaces plus one space for every 80,000 square feet
Ask a question about Hartford law
Corpus searches the Hartford sections it holds and shows the ones that match, with their citations. Free, no sign-in.
