Chapter 2 — PUBLIC SANITARY SEWERS AND CONNECTIONS GENERALLY

Zoning Ordinances of the City of New Britain, Connecticut (Municode product) (Codified through Ordinance No. 36885-3, adopted October 21, 2025 (Supp. No. 6)), New Britain, CT · 16 sections. Independent public-information project, not the official City of New Britain website.

  1. § 23-41 — Sanitary sewer connection permit—Required; application; issuance; voidance
  2. § 23-42 — Same—Revocation
  3. § 23-43 — Unauthorized connections prohibited
  4. § 23-44 — Changes in discharges or connection; prior application to director required
  5. § 23-45 — Connection prerequisites
  6. § 23-46 — Installation and connection costs to be borne by owner
  7. § 23-47 — Separate and independent connection required for each building; exception
  8. § 23-48 — Use of existing connections for new buildings restricted
  9. § 23-49 — Size, slope, alignment and materials of connections; methods of installation, etc
  10. § 23-50 — Elevation; lifters
  11. § 23-51 — Connection of surface water runoff sources to public sanitary system prohibited
  12. § 23-52 — Excavation safeguards
  13. § 23-53 — Proximity of connections to water supply restricted
  14. § 23-54 — Connections to be installed by licensed drain layer
  15. § 23-55 — Assessments for sewer connections in adjacent streets
  16. § 23-56 — Water closets in cellar; special permit required