§ 23-45 — Connection prerequisites
Zoning Ordinances of the City of New Britain, Connecticut (Municode product) (Codified through Ordinance No. 36885-3, adopted October 21, 2025 (Supp. No. 6)) · New Britain Code of Ordinances § 23-45
Corpus is an independent public-information project, not the official City of New Britain website. Stable reference: corpuslaw.us/code/8191b633-d7e8-4d11-a5b6-3e6ade465ecd
Sec. 23-45. - Connection prerequisites.
A connection to the public sanitary sewer will be made only after the building's plumbing has been approved by the city building inspector in order to insure that minimum standards are met for the installation. A fresh air vent shall be required for the building and all plumbing shall be in good working order. No trench containing a connection to the sanitary sewer shall be backfilled until the director has completed an inspection of and approved the work. The water level in the trench shall be maintained at a level below the sanitary sewer connection before the cap is removed and while the connection is being made and until such time as it has been inspected, approved and backfilled. The contractor shall notify the director twenty-four (24) hours before starting any work authorized under this permit.
(Code 1970, § 19-13(4.2(b)); Ord. of 3-82; No. 26824-1, 2-27-02)
Ask a question about New Britain law
Corpus searches the New Britain sections it holds and shows the ones that match, with their citations. Free, no sign-in.
